title: "Emerald People's Utility Dist (OR) Rate & SAIDI"
url: https://epri-peac.com/utilities/or-emerald-people-s-utility-dist-40437/
description: "2025 EIA-861 profile for Emerald People's Utility Dist (OR): 11.54 c/kWh rate, SAIDI Not reported in EIA-861, 262 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# Emerald People's Utility Dist (OR) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Emerald People's Utility Dist (EIA ID 40437, OR) serves 19,946 customers at 11.54 c/kWh (-3.92 c/kWh vs Oregon average) with no standalone IEEE SAIDI filing (4 counties served) with 262 net-metered residential solar systems (1.31% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 40437

- **Res. Rate** : 11.54 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 262 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Emerald People's Utility Dist Compare on Tariffs and Reliability?

Solar payback, residential tariff (11.54 c/kWh), and outage history inside Emerald People's Utility Dist territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Evaluating solar or generator backup under Emerald People's Utility Dist (Oregon) starts with its 11.54 c/kWh residential baseline (-3.92 c/kWh vs Oregon average) and 18.9-year 8 kW cash payback. EIA-861 records show Emerald People's Utility Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 302.4 min/yr) across 19,946 accounts.

## Where Does Emerald People's Utility Dist Sit Across US Utility Rates?

Benchmarking Emerald People's Utility Dist's 11.54 c/kWh residential rate against 1,989 EIA-861 utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does Emerald People's Utility Dist Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Emerald People's Utility Dist across Oregon utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for Emerald People's Utility Dist?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Emerald People's Utility Dist in 2025.

Lowest Rate #320 / 1,989

### 11.54 c/kWh (-3.92 vs OR)

Commercial avg: 10.99 c/kWh; Industrial: 8.65 c/kWh; est. residential bill $143.02/mo.

State Reliability Context

### 302.4 min/yr (OR Avg)

Utility did not file separate IEEE SAIDI in 2025; Oregon customer-weighted SAIDI is 302.4 min/yr.

Post-25D Payback

### 18.9 Years @ 11.54 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,246/yr at 1,350 kWh/kW.

Distributed PV

### 262 Net-Metered Systems

1.951 MW residential PV (1.31% of customers) across 4 counties; state FEMA declarations (2015-2026): 84.

Emerald People's Utility Dist Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1154 = $1,246/yr

EIA-861 2025 Utility ID 40437: Rate=11.54 c/kWh, Cust=19,946, PV=262.

**Result:** 18.9 yr 8 kW cash payback at 11.54 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Emerald People's Utility Dist?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 40437. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for Emerald People's Utility Dist (Utility ID 40437).

| EIA Utility ID & BA Code | ID 40437 · PACW |
|---|---|
| State & Ownership Type | OR · Political Subdivision |
| Retail Electricity Rates | 11.54 c/kWh Res · 10.99 c Comm · 8.65 c Ind |
| Avg Monthly Usage & Bill | 1,238.8 kWh/mo ($143.02/mo est.) |
| Residential Net-Metered PV | 262 systems (1.951 MW) |
| Counties Served (Sample) | 4 counties (Benton, Douglas, Lane, Linn) |

## Which Peer Electric Utilities Operate in OR?

Benchmark Emerald People's Utility Dist directly against Tillamook Peoples Utility Dist and peer Oregon retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Tillamook Peoples Utility Dist**](https://epri-peac.com/utilities/or-tillamook-peoples-utility-dist-18917/) | 12.66 c | — | 91 | 20,263 |
| [**Consumers Power, Inc**](https://epri-peac.com/utilities/or-consumers-power-inc-4743/) | 13.9 c | 738.9 min | 678 | 18,921 |
| [**Midstate Electric Coop, Inc**](https://epri-peac.com/utilities/or-midstate-electric-coop-inc-12439/) | 11.85 c | — | 97 | 18,875 |
| [**Salem Electric - (OR)**](https://epri-peac.com/utilities/or-salem-electric-or-16555/) | 10.91 c | — | 151 | 18,499 |

What to Check & Best-Fit Scenarios

## What Should Emerald People's Utility Dist Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Emerald People's Utility Dist (Political Subdivision, OR) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Emerald People's Utility Dist acts as a wires-only TDU or bundled utility in OR.
- Transformer limits: Emerald People's Utility Dist interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### Emerald People's Utility Dist Solar & Battery Evaluators

Compare your actual Emerald People's Utility Dist monthly kWh statement against 11.54 c/kWh and verify current export tariffs in OR.

### Emerald People's Utility Dist Outage & Generator Planners

Use Emerald People's Utility Dist's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Emerald People's Utility Dist (Oregon) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Emerald People's Utility Dist's residential electricity rate and 2026 solar payback?

Emerald People's Utility Dist averages 11.54 c/kWh (-3.92 c/kWh vs Oregon average vs. Oregon). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,246/yr (18.9-year payback).

### How reliable is Emerald People's Utility Dist compared to peer Oregon utilities?

Emerald People's Utility Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 302.4 min/yr); compare rates and outage history directly with Tillamook Peoples Utility Dist (12.66 c/kWh) across Oregon.

### Which counties and customers does Emerald People's Utility Dist serve in Oregon?

EIA-861 filings list 19,946 customers across 4 counties including Benton, Douglas, Lane, with 262 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Emerald People's Utility Dist.

## Related Pages

Explore Oregon energy benchmarks, Tillamook Peoples Utility Dist, county outage profiles, and NEC 705.12 tools alongside Emerald People's Utility Dist.

[Oregon State Energy Rates & Utilities](https://epri-peac.com/states/oregon/) [All Oregon County Power & Outage Profiles](https://epri-peac.com/counties/oregon/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.54 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)