---
title: "Clatskanie Peoples Util Dist (OR) Rate & SAIDI"
url: https://epri-peac.com/utilities/or-clatskanie-peoples-util-dist-28541/
description: "2025 EIA-861 profile for Clatskanie Peoples Util Dist (OR): 7.58 c/kWh rate, SAIDI 397.2 min/yr, 17 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Clatskanie Peoples Util Dist (OR) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Clatskanie Peoples Util Dist (EIA ID 28541, OR) serves 3,774 customers at 7.58 c/kWh (-7.88 c/kWh vs Oregon average) with 397.2 min/yr SAIDI (6.62 hrs/yr) with 17 net-metered residential solar systems (0.45% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 28541

- **Res. Rate** : 7.58 c/kWh

- **SAIDI (All Events)** : 397.2 min/yr

- **Net-Metered PV** : 17 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Clatskanie Peoples Util Dist Compare on Tariffs and Reliability?

Solar payback, residential tariff (7.58 c/kWh), and outage history inside Clatskanie Peoples Util Dist territory. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Evaluating solar or generator backup under Clatskanie Peoples Util Dist (Oregon) starts with its 7.58 c/kWh residential baseline (-7.88 c/kWh vs Oregon average) and 28.8-year 8 kW cash payback. EIA-861 records show Clatskanie Peoples Util Dist logged 397.2 SAIDI outage minutes (6.62 hrs/yr, 50.4% storm-driven), making battery backup or a standby ATS worthwhile across 3,774 accounts.

## Where Does Clatskanie Peoples Util Dist Sit Across US Utility Rates?

Benchmarking Clatskanie Peoples Util Dist's 7.58 c/kWh residential rate against 1,989 EIA-861 utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does Clatskanie Peoples Util Dist Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Clatskanie Peoples Util Dist across Oregon utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for Clatskanie Peoples Util Dist?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Clatskanie Peoples Util Dist in 2025.

Lowest Rate #26 / 1,989

### 7.58 c/kWh (-7.88 vs OR)

Commercial avg: 7.13 c/kWh; Industrial: 5.63 c/kWh; est. residential bill $112.61/mo.

Reliability #588 / 751

### 397.2 min/yr (6.62 hrs)

50.4% (200.0 min) from Major Event Days; avg restore 360.4 min (~10.8 kWh @ 1.8 kW).

Post-25D Payback

### 28.8 Years @ 7.58 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$819/yr at 1,350 kWh/kW.

Distributed PV

### 17 Net-Metered Systems

0.139 MW residential PV (0.45% of customers) across 2 counties; state FEMA declarations (2015-2026): 84.

Clatskanie Peoples Util Dist Reliability & Solar Offset Calculation

Backup_Energy = (360.4 min / 60) * 1.8 kW = 10.8 kWh/event | Solar_Offset = 10,800 kWh * $0.0758 = $819/yr

EIA-861 2025 Utility ID 28541: Rate=7.58 c/kWh, Cust=3,774, SAIDI=397.2 min, PV=17.

**Result:** 6.62 outage hrs/yr; 28.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Clatskanie Peoples Util Dist?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 28541. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Clatskanie Peoples Util Dist (Utility ID 28541).

| EIA Utility ID & BA Code | ID 28541 · BPAT |
|---|---|
| State & Ownership Type | OR · Political Subdivision |
| Retail Electricity Rates | 7.58 c/kWh Res · 7.13 c Comm · 5.63 c Ind |
| Avg Monthly Usage & Bill | 1,486.6 kWh/mo ($112.61/mo est.) |
| SAIDI (All Events w/ MED) | 397.2 min/yr (6.62 hrs/yr) |
| SAIDI (Without Major Events) | 197.2 min/yr (Storm share: 50.4%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.102 /yr · 360.4 min restore |
| Residential Net-Metered PV | 17 systems (0.139 MW) |
| Counties Served (Sample) | 2 counties (Clatsop, Columbia) |

## Which Peer Electric Utilities Operate in OR?

Benchmark Clatskanie Peoples Util Dist directly against Tesla Inc. and peer Oregon retail electric power providers. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Tesla Inc.**](https://epri-peac.com/utilities/or-tesla-inc-57313/) | 9.34 c | — | 0 | 3,129 |
| [**Surprise Valley Electrification**](https://epri-peac.com/utilities/or-surprise-valley-electrification-18260/) | 13.13 c | — | 8 | 1,215 |
| [**Sunrun Inc.**](https://epri-peac.com/utilities/or-sunrun-inc-59647/) | 12.22 c | — | 0 | 74 |
| [**Columbia Rural Elec Assn, Inc**](https://epri-peac.com/utilities/or-columbia-rural-elec-assn-inc-4041/) | 14.53 c | — | 0 | 44 |

What to Check & Best-Fit Scenarios

## What Should Clatskanie Peoples Util Dist Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Clatskanie Peoples Util Dist (Political Subdivision, OR) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Clatskanie Peoples Util Dist acts as a wires-only TDU or bundled utility in OR.
- Transformer limits: Clatskanie Peoples Util Dist interconnection engineering still checks neighborhood transformer kVA regardless of 397.2 SAIDI.

### Clatskanie Peoples Util Dist Solar & Battery Evaluators

Compare your actual Clatskanie Peoples Util Dist monthly kWh statement against 7.58 c/kWh and verify current export tariffs in OR.

### Clatskanie Peoples Util Dist Outage & Generator Planners

Use Clatskanie Peoples Util Dist's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Clatskanie Peoples Util Dist (Oregon) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Clatskanie Peoples Util Dist's residential electricity rate and 2026 solar payback?

Clatskanie Peoples Util Dist averages 7.58 c/kWh (-7.88 c/kWh vs Oregon average vs. Oregon). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$819/yr (28.8-year payback).

### How reliable is Clatskanie Peoples Util Dist compared to peer Oregon utilities?

Clatskanie Peoples Util Dist logged 397.2 SAIDI outage minutes (6.62 hrs/yr, 50.4% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Tesla Inc. (9.34 c/kWh) across Oregon.

### Which counties and customers does Clatskanie Peoples Util Dist serve in Oregon?

EIA-861 filings list 3,774 customers across 2 counties including Clatsop, Columbia, with 17 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Clatskanie Peoples Util Dist.

## Related Pages

Explore Oregon energy benchmarks, Tesla Inc., county outage profiles, and NEC 705.12 tools alongside Clatskanie Peoples Util Dist.

[Oregon State Energy Rates & Utilities](https://epri-peac.com/states/oregon/) [All Oregon County Power & Outage Profiles](https://epri-peac.com/counties/oregon/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 7.58 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
