---
title: "Empire District Electric Co (OK) Rate & SAIDI"
url: https://epri-peac.com/utilities/ok-empire-district-electric-co-5860/
description: "2025 EIA-861 profile for Empire District Electric Co (OK): 14.93 c/kWh rate, SAIDI 199.6 min/yr, 44 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Empire District Electric Co (OK) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Empire District Electric Co (EIA ID 5860, OK) serves 3,951 customers at 14.93 c/kWh (+1.72 c/kWh vs Oklahoma average) with 199.6 min/yr SAIDI (3.33 hrs/yr) with 44 net-metered residential solar systems (1.11% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 5860

- **Res. Rate** : 14.93 c/kWh

- **SAIDI (All Events)** : 199.6 min/yr

- **Net-Metered PV** : 44 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Empire District Electric Co Compare on Tariffs and Reliability?

EIA-861 rate delta (+1.72 c/kWh vs Oklahoma average), customer scale (3,951), and 2026 solar payback benchmarks for Empire District Electric Co.

Ranked #1,200 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 39.6% of peers), Empire District Electric Co serves 3,951 accounts in Oklahoma (Investor Owned). Commercial power averages 13.12 c/kWh. It recorded 199.6 SAIDI outage minutes (3.33 hrs/yr, rank #417 of 751 reporting utilities), with 44 net-metered residential solar systems (1.11% customer adoption).

## Where Does Empire District Electric Co Sit Across US Utility Rates?

Positions Empire District Electric Co (14.93 c/kWh) across 1,989 US electric utility residential tariffs. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does Empire District Electric Co Rank Across Cost & Reliability?

Percentile placement of Empire District Electric Co across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Empire District Electric Co?

Four key EIA-861 rate, outage, and solar payback benchmarks for Empire District Electric Co (Investor Owned) in Oklahoma.

Lowest Rate #1,200 / 1,989

### 14.93 c/kWh (+1.72 vs OK)

Commercial avg: 13.12 c/kWh; Industrial: 9.69 c/kWh; est. residential bill $159.93/mo.

Reliability #417 / 751

### 199.6 min/yr (3.33 hrs)

48.8% (97.4 min) from Major Event Days; avg restore 88.8 min (~2.7 kWh @ 1.8 kW).

Post-25D Payback

### 14.6 Years @ 14.93 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,612/yr at 1,350 kWh/kW.

Distributed PV

### 44 Net-Metered Systems

0.419 MW residential PV (1.11% of customers) across 3 counties; state FEMA declarations (2015-2026): 89.

Empire District Electric Co Reliability & Solar Offset Calculation

Backup_Energy = (88.8 min / 60) * 1.8 kW = 2.7 kWh/event | Solar_Offset = 10,800 kWh * $0.1493 = $1,612/yr

EIA-861 2025 Utility ID 5860: Rate=14.93 c/kWh, Cust=3,951, SAIDI=199.6 min, PV=44.

**Result:** 3.33 outage hrs/yr; 14.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Empire District Electric Co?

Complete Form EIA-861 filing summary for Empire District Electric Co (ID 5860) covering sales, PV, and counties. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Empire District Electric Co (Utility ID 5860).

| EIA Utility ID & BA Code | ID 5860 · SWPP |
|---|---|
| State & Ownership Type | OK · Investor Owned |
| Retail Electricity Rates | 14.93 c/kWh Res · 13.12 c Comm · 9.69 c Ind |
| Avg Monthly Usage & Bill | 1,071.4 kWh/mo ($159.93/mo est.) |
| SAIDI (All Events w/ MED) | 199.6 min/yr (3.33 hrs/yr) |
| SAIDI (Without Major Events) | 102.2 min/yr (Storm share: 48.8%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.249 /yr · 88.8 min restore |
| Residential Net-Metered PV | 44 systems (0.419 MW) |
| Counties Served (Sample) | 3 counties (Craig, Delaware, Ottawa) |

## Which Peer Electric Utilities Operate in OK?

Compare Empire District Electric Co directly with Arkansas Valley Elec Coop Corp and nearby Oklahoma electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Arkansas Valley Elec Coop Corp**](https://epri-peac.com/utilities/ok-arkansas-valley-elec-coop-corp-817/) | 13.75 c | 198.3 min | 47 | 4,272 |
| [**Kay Electric Coop**](https://epri-peac.com/utilities/ok-kay-electric-coop-10012/) | 14.82 c | — | 0 | 4,389 |
| [**Alfalfa Electric Coop, Inc**](https://epri-peac.com/utilities/ok-alfalfa-electric-coop-inc-296/) | 10.85 c | — | 0 | 2,646 |
| [**Southwest Arkansas E.C.C.**](https://epri-peac.com/utilities/ok-southwest-arkansas-e-c-c-17671/) | 12.88 c | — | 1 | 220 |

What to Check & Best-Fit Scenarios

## What Should Empire District Electric Co Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Empire District Electric Co (Investor Owned, OK) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Empire District Electric Co acts as a wires-only TDU or bundled utility in OK.
- Transformer limits: Empire District Electric Co interconnection engineering still checks neighborhood transformer kVA regardless of 199.6 SAIDI.

### Empire District Electric Co Solar & Battery Evaluators

Compare your actual Empire District Electric Co monthly kWh statement against 14.93 c/kWh and verify current export tariffs in OK.

### Empire District Electric Co Outage & Generator Planners

Use Empire District Electric Co's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Empire District Electric Co (Oklahoma) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Empire District Electric Co's residential electricity rate and 2026 solar payback?

Empire District Electric Co averages 14.93 c/kWh (+1.72 c/kWh vs Oklahoma average vs. Oklahoma). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,612/yr (14.6-year payback).

### How reliable is Empire District Electric Co compared to peer Oklahoma utilities?

Empire District Electric Co recorded 199.6 SAIDI outage minutes (3.33 hrs/yr, rank #417 of 751 reporting utilities); compare rates and outage history directly with Arkansas Valley Elec Coop Corp (13.75 c/kWh) across Oklahoma.

### Which counties and customers does Empire District Electric Co serve in Oklahoma?

EIA-861 filings list 3,951 customers across 3 counties including Craig, Delaware, Ottawa, with 44 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Empire District Electric Co.

## Related Pages

Explore Oklahoma energy benchmarks, Arkansas Valley Elec Coop Corp, county outage profiles, and NEC 705.12 tools alongside Empire District Electric Co.

[Oklahoma State Energy Rates & Utilities](https://epri-peac.com/states/oklahoma/) [All Oklahoma County Power & Outage Profiles](https://epri-peac.com/counties/oklahoma/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.93 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
