title: "City of Claremore (OK) Rate & SAIDI"
url: https://epri-peac.com/utilities/ok-city-of-claremore-3647/
description: "2025 EIA-861 profile for City of Claremore (OK): 13.74 c/kWh rate, SAIDI 172.9 min/yr, 94 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Claremore (OK) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Claremore (EIA ID 3647, OK) serves 12,012 customers at 13.74 c/kWh (+0.53 c/kWh vs Oklahoma average) with 172.9 min/yr SAIDI (2.88 hrs/yr) with 94 net-metered residential solar systems (0.78% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3647

- **Res. Rate** : 13.74 c/kWh

- **SAIDI (All Events)** : 172.9 min/yr

- **Net-Metered PV** : 94 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Claremore Compare on Tariffs and Reliability?

How City of Claremore (Municipal) performs across 1 county on kWh rates and outage resilience. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Across 1 county including Rogers, City of Claremore bills residential power at 13.74 c/kWh (+0.53 c/kWh vs Oklahoma average vs. Oklahoma), offsetting ~$1,484/yr on an 8 kW array compared to peer Ozarks Electric Coop Corp - (AR) (14.87 c/kWh). With 12,012 customer accounts (Municipal), 2025 Form EIA-861 shows City of Claremore recorded 172.9 SAIDI outage minutes (2.88 hrs/yr, rank #368 of 751 reporting utilities), with 94 net-metered residential solar systems (0.78% customer adoption).

## Where Does City of Claremore Sit Across US Utility Rates?

National utility tariff curve marking City of Claremore at 13.74 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Claremore Rank Across Cost & Reliability?

Relative ranking of City of Claremore on residential electricity pricing and annual IEEE SAIDI outage duration. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for City of Claremore?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Claremore in Oklahoma. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Lowest Rate #884 / 1,989

### 13.74 c/kWh (+0.53 vs OK)

Commercial avg: 14.37 c/kWh; Industrial: 9.77 c/kWh; est. residential bill $127.70/mo.

Reliability #368 / 751

### 172.9 min/yr (2.88 hrs)

0.6% (1.0 min) from Major Event Days; avg restore 86.9 min (~2.6 kWh @ 1.8 kW).

Post-25D Payback

### 15.9 Years @ 13.74 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,484/yr at 1,350 kWh/kW.

Distributed PV

### 94 Net-Metered Systems

0.817 MW residential PV (0.78% of customers) across 1 county; state FEMA declarations (2015-2026): 89.

City of Claremore Reliability & Solar Offset Calculation

Backup_Energy = (86.9 min / 60) * 1.8 kW = 2.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1374 = $1,484/yr

EIA-861 2025 Utility ID 3647: Rate=13.74 c/kWh, Cust=12,012, SAIDI=172.9 min, PV=94.

**Result:** 2.88 outage hrs/yr; 15.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Claremore?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Claremore. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Claremore (Utility ID 3647).

| EIA Utility ID & BA Code | ID 3647 · SWPP |
|---|---|
| State & Ownership Type | OK · Municipal |
| Retail Electricity Rates | 13.74 c/kWh Res · 14.37 c Comm · 9.77 c Ind |
| Avg Monthly Usage & Bill | 929.4 kWh/mo ($127.70/mo est.) |
| SAIDI (All Events w/ MED) | 172.9 min/yr (2.88 hrs/yr) |
| SAIDI (Without Major Events) | 171.9 min/yr (Storm share: 0.6%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.991 /yr · 86.9 min restore |
| Residential Net-Metered PV | 94 systems (0.817 MW) |
| Counties Served (Sample) | 1 county (Rogers) |

## Which Peer Electric Utilities Operate in OK?

Nearby Oklahoma electric utilities of comparable customer size led by Ozarks Electric Coop Corp - (AR) (14.87 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Ozarks Electric Coop Corp - (AR)**](https://epri-peac.com/utilities/ok-ozarks-electric-coop-corp-ar-14289/) | 14.87 c | 1,043.1 min | 93 | 11,873 |
| [**City of Ponca City - (OK)**](https://epri-peac.com/utilities/ok-city-of-ponca-city-ok-15202/) | 12.52 c | 144.0 min | 0 | 13,907 |
| [**Northwestern Electric Coop Inc - (OK)**](https://epri-peac.com/utilities/ok-northwestern-electric-coop-inc-ok-13807/) | 16.82 c | — | 0 | 9,644 |
| [**People's Electric Cooperative**](https://epri-peac.com/utilities/ok-people-s-electric-cooperative-14775/) | 15.62 c | — | 205 | 14,774 |

What to Check & Best-Fit Scenarios

## What Should City of Claremore Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Claremore (Municipal, OK) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Claremore (OK) shift real bills away from 13.74 c/kWh.
- Outage clustering: Major Event Days skew City of Claremore annual minutes differently than routine non-storm reliability.

### City of Claremore Solar & Battery Evaluators

Compare your actual City of Claremore monthly kWh statement against 13.74 c/kWh and verify current export tariffs in OK.

### City of Claremore Outage & Generator Planners

Use City of Claremore's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Claremore (Oklahoma) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

### What is City of Claremore's residential electricity rate and 2026 solar payback?

City of Claremore averages 13.74 c/kWh (+0.53 c/kWh vs Oklahoma average vs. Oklahoma). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,484/yr (15.9-year payback).

### How reliable is City of Claremore compared to peer Oklahoma utilities?

City of Claremore recorded 172.9 SAIDI outage minutes (2.88 hrs/yr, rank #368 of 751 reporting utilities); compare rates and outage history directly with Ozarks Electric Coop Corp - (AR) (14.87 c/kWh) across Oklahoma.

### Which counties and customers does City of Claremore serve in Oklahoma?

EIA-861 filings list 12,012 customers across 1 county including Rogers, with 94 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Claremore.

## Related Pages

Explore Oklahoma energy benchmarks, Ozarks Electric Coop Corp - (AR), county outage profiles, and NEC 705.12 tools alongside City of Claremore.

[Oklahoma State Energy Rates & Utilities](https://epri-peac.com/states/oklahoma/) [All Oklahoma County Power & Outage Profiles](https://epri-peac.com/counties/oklahoma/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.74 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)