Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

The Toledo Edison Co (EIA ID 18997, OH) serves 193,719 customers at 10.51 c/kWh (-6.39 c/kWh vs Ohio average) with 109.6 min/yr SAIDI (1.83 hrs/yr) with 788 net-metered residential solar systems (0.41% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 18997

- **Res. Rate** : 10.51 c/kWh

- **SAIDI (All Events)** : 109.6 min/yr

- **Net-Metered PV** : 788 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does The Toledo Edison Co Compare on Tariffs and Reliability?

Solar payback, residential tariff (10.51 c/kWh), and outage history inside The Toledo Edison Co territory. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Homeowners inside The Toledo Edison Co's Ohio footprint (10 counties including Defiance, Fulton, Henry) face 10.51 c/kWh benchmark pricing (-8.03 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 20.8 years. Reliability data recorded 109.6 SAIDI outage minutes (1.83 hrs/yr, rank #245 of 751 reporting utilities).

## Where Does The Toledo Edison Co Sit Across US Utility Rates?

Benchmarking The Toledo Edison Co's 10.51 c/kWh residential rate against 1,989 EIA-861 utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does The Toledo Edison Co Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for The Toledo Edison Co across Ohio utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for The Toledo Edison Co?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by The Toledo Edison Co in 2025.

Lowest Rate #184 / 1,989

### 10.51 c/kWh (-6.39 vs OH)

Commercial avg: 7.68 c/kWh; Industrial: 0.97 c/kWh; est. residential bill $118.13/mo.

Reliability #245 / 751

### 109.6 min/yr (1.83 hrs)

16.2% (17.8 min) from Major Event Days; avg restore 115.0 min (~3.5 kWh @ 1.8 kW).

Post-25D Payback

### 20.8 Years @ 10.51 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,135/yr at 1,350 kWh/kW.

Distributed PV

### 788 Net-Metered Systems

5.877 MW residential PV (0.41% of customers) across 10 counties; state FEMA declarations (2015-2026): 7.

The Toledo Edison Co Reliability & Solar Offset Calculation

Backup_Energy = (115.0 min / 60) * 1.8 kW = 3.5 kWh/event | Solar_Offset = 10,800 kWh * $0.1051 = $1,135/yr

EIA-861 2025 Utility ID 18997: Rate=10.51 c/kWh, Cust=193,719, SAIDI=109.6 min, PV=788.

**Result:** 1.83 outage hrs/yr; 20.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for The Toledo Edison Co?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 18997. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for The Toledo Edison Co (Utility ID 18997).

| EIA Utility ID & BA Code | ID 18997 · PJM |
|---|---|
| State & Ownership Type | OH · Investor Owned |
| Retail Electricity Rates | 10.51 c/kWh Res · 7.68 c Comm · 0.97 c Ind |
| Avg Monthly Usage & Bill | 1,124.1 kWh/mo ($118.13/mo est.) |
| SAIDI (All Events w/ MED) | 109.6 min/yr (1.83 hrs/yr) |
| SAIDI (Without Major Events) | 91.8 min/yr (Storm share: 16.2%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.953 /yr · 115.0 min restore |
| Residential Net-Metered PV | 788 systems (5.877 MW) |
| Counties Served (Sample) | 10 counties (Defiance, Fulton, Henry, Lucas, Ottawa, Putnam, Sandusky, Seneca, Williams, Wood) |

## Which Peer Electric Utilities Operate in OH?

Benchmark The Toledo Edison Co directly against Interstate Gas Supply, Inc. and peer Ohio retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Interstate Gas Supply, Inc.**](https://epri-peac.com/utilities/oh-interstate-gas-supply-inc-58957/) | 10.73 c | — | 0 | 175,428 |
| [**Reliant Energy Northeast LLC**](https://epri-peac.com/utilities/oh-reliant-energy-northeast-llc-57037/) | 10.59 c | — | 0 | 120,367 |
| [**South Central Power Company**](https://epri-peac.com/utilities/oh-south-central-power-company-18085/) | 15.39 c | 298.1 min | 0 | 118,458 |
| [**Constellation NewEnergy, Inc**](https://epri-peac.com/utilities/oh-constellation-newenergy-inc-13374/) | 8.43 c | — | 0 | 96,382 |

What to Check & Best-Fit Scenarios

## What Should The Toledo Edison Co Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for The Toledo Edison Co (Investor Owned, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside The Toledo Edison Co (OH) shift real bills away from 10.51 c/kWh.
- Outage clustering: Major Event Days skew The Toledo Edison Co annual minutes differently than routine non-storm reliability.

### The Toledo Edison Co Solar & Battery Evaluators

Compare your actual The Toledo Edison Co monthly kWh statement against 10.51 c/kWh and verify current export tariffs in OH.

### The Toledo Edison Co Outage & Generator Planners

Use The Toledo Edison Co's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for The Toledo Edison Co (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is The Toledo Edison Co's residential electricity rate and 2026 solar payback?

The Toledo Edison Co averages 10.51 c/kWh (-6.39 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,135/yr (20.8-year payback).

### How reliable is The Toledo Edison Co compared to peer Ohio utilities?

The Toledo Edison Co recorded 109.6 SAIDI outage minutes (1.83 hrs/yr, rank #245 of 751 reporting utilities); compare rates and outage history directly with Interstate Gas Supply, Inc. (10.73 c/kWh) across Ohio.

### Which counties and customers does The Toledo Edison Co serve in Ohio?

EIA-861 filings list 193,719 customers across 10 counties including Defiance, Fulton, Henry, with 788 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting The Toledo Edison Co.

## Related Pages

Explore Ohio energy benchmarks, Interstate Gas Supply, Inc., county outage profiles, and NEC 705.12 tools alongside The Toledo Edison Co.

[Ohio State Energy Rates & Utilities](https://epri-peac.com/states/ohio/) [All Ohio County Power & Outage Profiles](https://epri-peac.com/counties/ohio/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.51 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)