title: "Inspire Energy Holdings, LLC (OH) Rate & SAIDI"
url: https://epri-peac.com/utilities/oh-inspire-energy-holdings-llc-59310/
description: "2025 EIA-861 profile for Inspire Energy Holdings, LLC (OH): 13.45 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Inspire Energy Holdings, LLC (OH) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Inspire Energy Holdings, LLC (EIA ID 59310, OH) serves 20,793 customers at 13.45 c/kWh (-3.45 c/kWh vs Ohio average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 59310

- **Res. Rate** : 13.45 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Inspire Energy Holdings, LLC Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.45 c/kWh), and outage history inside Inspire Energy Holdings, LLC territory. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Evaluating solar or generator backup under Inspire Energy Holdings, LLC (Ohio) starts with its 13.45 c/kWh residential baseline (-3.45 c/kWh vs Ohio average) and 16.2-year 8 kW cash payback. EIA-861 records show Inspire Energy Holdings, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr) across 20,793 accounts.

## Where Does Inspire Energy Holdings, LLC Sit Across US Utility Rates?

Benchmarking Inspire Energy Holdings, LLC's 13.45 c/kWh residential rate against 1,989 EIA-861 utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## How Does Inspire Energy Holdings, LLC Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Inspire Energy Holdings, LLC across Ohio utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for Inspire Energy Holdings, LLC?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Inspire Energy Holdings, LLC in 2025.

Lowest Rate #797 / 1,989

### 13.45 c/kWh (-3.45 vs OH)

Commercial avg: 12.28 c/kWh; est. residential bill $97.40/mo.

State Reliability Context

### 205.5 min/yr (OH Avg)

Utility did not file separate IEEE SAIDI in 2025; Ohio customer-weighted SAIDI is 205.5 min/yr.

Post-25D Payback

### 16.2 Years @ 13.45 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,453/yr at 1,350 kWh/kW.

Service Territory

### 20,793 Customers · 0 Counties

Serves 0 counties in Ohio; state FEMA declarations (2015-2026): 7.

Inspire Energy Holdings, LLC Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1345 = $1,453/yr

EIA-861 2025 Utility ID 59310: Rate=13.45 c/kWh, Cust=20,793.

**Result:** 16.2 yr 8 kW cash payback at 13.45 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Inspire Energy Holdings, LLC?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 59310. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for Inspire Energy Holdings, LLC (Utility ID 59310).

| EIA Utility ID & BA Code | ID 59310 · PJM |
|---|---|
| State & Ownership Type | OH · Retail Power Marketer |
| Retail Electricity Rates | 13.45 c/kWh Res · 12.28 c Comm |
| Avg Monthly Usage & Bill | 724.4 kWh/mo ($97.40/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in OH?

Benchmark Inspire Energy Holdings, LLC directly against Energy Services Providers, Inc and peer Ohio retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Energy Services Providers, Inc**](https://epri-peac.com/utilities/oh-energy-services-providers-inc-55874/) | 10.1 c | — | 0 | 20,330 |
| [**Public Power LLC (CT)**](https://epri-peac.com/utilities/oh-public-power-llc-ct-58119/) | 7.26 c | — | 0 | 22,192 |
| [**CleanChoice Energy, Inc.**](https://epri-peac.com/utilities/oh-cleanchoice-energy-inc-58951/) | 11.1 c | — | 0 | 23,210 |
| [**City of Cuyahoga Falls - (OH)**](https://epri-peac.com/utilities/oh-city-of-cuyahoga-falls-oh-4683/) | 12.73 c | 55.7 min | 25 | 24,256 |

What to Check & Best-Fit Scenarios

## What Should Inspire Energy Holdings, LLC Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Inspire Energy Holdings, LLC (Retail Power Marketer, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Inspire Energy Holdings, LLC (Retail Power Marketer) reports historical 2025 EIA-861 averages rather than live rate-case riders in OH.
- Export credit rules: check Inspire Energy Holdings, LLC's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Inspire Energy Holdings, LLC Solar & Battery Evaluators

Compare your actual Inspire Energy Holdings, LLC monthly kWh statement against 13.45 c/kWh and verify current export tariffs in OH.

### Inspire Energy Holdings, LLC Outage & Generator Planners

Use Inspire Energy Holdings, LLC's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Inspire Energy Holdings, LLC (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Inspire Energy Holdings, LLC's residential electricity rate and 2026 solar payback?

Inspire Energy Holdings, LLC averages 13.45 c/kWh (-3.45 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,453/yr (16.2-year payback).

### How reliable is Inspire Energy Holdings, LLC compared to peer Ohio utilities?

Inspire Energy Holdings, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr); compare rates and outage history directly with Energy Services Providers, Inc (10.1 c/kWh) across Ohio.

### Which counties and customers does Inspire Energy Holdings, LLC serve in Ohio?

EIA-861 filings list 20,793 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Inspire Energy Holdings, LLC.

## Related Pages

Explore Ohio energy benchmarks, Energy Services Providers, Inc, county outage profiles, and NEC 705.12 tools alongside Inspire Energy Holdings, LLC.

[Ohio State Energy Rates & Utilities](https://epri-peac.com/states/ohio/) [All Ohio County Power & Outage Profiles](https://epri-peac.com/counties/ohio/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.45 c/kWh rates.