title: "City of Niles - (OH) (OH) Rate & SAIDI"
url: https://epri-peac.com/utilities/oh-city-of-niles-oh-13602/
description: "2025 EIA-861 profile for City of Niles - (OH) (OH): 12.4 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Niles - (OH) (OH) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Niles - (OH) (EIA ID 13602, OH) serves 11,889 customers at 12.4 c/kWh (-4.50 c/kWh vs Ohio average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 13602

- **Res. Rate** : 12.4 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Niles - (OH) Compare on Tariffs and Reliability?

EIA-861 rate delta (-4.50 c/kWh vs Ohio average), customer scale (11,889), and 2026 solar payback benchmarks for City of Niles - (OH).

Serving 11,889 customers across 1 county including Trumbull in Ohio, City of Niles - (OH) (Municipal, Balancing Authority PJM) offers a low 12.4 c/kWh residential rate (-6.14 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.6 years without federal 25D. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Niles - (OH) Sit Across US Utility Rates?

Positions City of Niles - (OH) (12.4 c/kWh) across 1,989 US electric utility residential tariffs. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does City of Niles - (OH) Rank Across Cost & Reliability?

Percentile placement of City of Niles - (OH) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Niles - (OH)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Niles - (OH) (Municipal) in Ohio. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #491 / 1,989

### 12.4 c/kWh (-4.50 vs OH)

Commercial avg: 10.11 c/kWh; Industrial: 6.67 c/kWh; est. residential bill $78.98/mo.

State Reliability Context

### 205.5 min/yr (OH Avg)

Utility did not file separate IEEE SAIDI in 2025; Ohio customer-weighted SAIDI is 205.5 min/yr.

Post-25D Payback

### 17.6 Years @ 12.4 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,339/yr at 1,350 kWh/kW.

Service Territory

### 11,889 Customers · 1 County

Serves 1 county including Trumbull in Ohio; state FEMA declarations (2015-2026): 7.

City of Niles - (OH) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1240 = $1,339/yr

EIA-861 2025 Utility ID 13602: Rate=12.4 c/kWh, Cust=11,889.

**Result:** 17.6 yr 8 kW cash payback at 12.4 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Niles - (OH)?

Complete Form EIA-861 filing summary for City of Niles - (OH) (ID 13602) covering sales, PV, and counties. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for City of Niles - (OH) (Utility ID 13602).

| EIA Utility ID & BA Code | ID 13602 · PJM |
|---|---|
| State & Ownership Type | OH · Municipal |
| Retail Electricity Rates | 12.4 c/kWh Res · 10.11 c Comm · 6.67 c Ind |
| Avg Monthly Usage & Bill | 636.7 kWh/mo ($78.98/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Trumbull) |

## Which Peer Electric Utilities Operate in OH?

Compare City of Niles - (OH) directly with Santanna Energy Services and nearby Ohio electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Santanna Energy Services**](https://epri-peac.com/utilities/oh-santanna-energy-services-59811/) | 8.69 c | — | 0 | 11,875 |
| [**Provision Power & Gas, LLC**](https://epri-peac.com/utilities/oh-provision-power-gas-llc-63546/) | 12.31 c | — | 0 | 11,777 |
| [**Butler Rural Electric Coop Inc - (OH)**](https://epri-peac.com/utilities/oh-butler-rural-electric-coop-inc-oh-2651/) | 18.44 c | 172.0 min | 162 | 11,531 |
| [**City of Wadsworth - (OH)**](https://epri-peac.com/utilities/oh-city-of-wadsworth-oh-19951/) | 12.21 c | 43.5 min | 33 | 12,296 |

What to Check & Best-Fit Scenarios

## What Should City of Niles - (OH) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Niles - (OH) (Municipal, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Niles - (OH)'s 12.4 c/kWh blended residential rate in OH does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Niles - (OH) system-wide SAIDI averages rural and urban circuits across its OH territory or nearby Santanna Energy Services.

### City of Niles - (OH) Solar & Battery Evaluators

Compare your actual City of Niles - (OH) monthly kWh statement against 12.4 c/kWh and verify current export tariffs in OH.

### City of Niles - (OH) Outage & Generator Planners

Use City of Niles - (OH)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Niles - (OH) (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Niles - (OH)'s residential electricity rate and 2026 solar payback?

City of Niles - (OH) averages 12.4 c/kWh (-4.50 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,339/yr (17.6-year payback).

### How reliable is City of Niles - (OH) compared to peer Ohio utilities?

City of Niles - (OH) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr); compare rates and outage history directly with Santanna Energy Services (8.69 c/kWh) across Ohio.

### Which counties and customers does City of Niles - (OH) serve in Ohio?

EIA-861 filings list 11,889 customers across 1 county including Trumbull, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Niles - (OH).

## Related Pages

Explore Ohio energy benchmarks, Santanna Energy Services, county outage profiles, and NEC 705.12 tools alongside City of Niles - (OH).

[Ohio State Energy Rates & Utilities](https://epri-peac.com/states/ohio/) [All Ohio County Power & Outage Profiles](https://epri-peac.com/counties/ohio/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.4 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)