EIA-861 Grid Reliability & Net Metering

# City of Hamilton - (OH) (OH) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Hamilton - (OH) (EIA ID 7977, OH) serves 27,209 customers at 15.49 c/kWh (-1.41 c/kWh vs Ohio average) with 121.1 min/yr SAIDI (2.02 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7977

- **Res. Rate** : 15.49 c/kWh

- **SAIDI (All Events)** : 121.1 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Hamilton - (OH) Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.41 c/kWh vs Ohio average), customer scale (27,209), and 2026 solar payback benchmarks for City of Hamilton - (OH).

Ranked #1,315 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 33.8% of peers), City of Hamilton - (OH) serves 27,209 accounts in Ohio (Municipal). Commercial power averages 9.95 c/kWh. It recorded 121.1 SAIDI outage minutes (2.02 hrs/yr, rank #279 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Hamilton - (OH) Sit Across US Utility Rates?

Positions City of Hamilton - (OH) (15.49 c/kWh) across 1,989 US electric utility residential tariffs. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does City of Hamilton - (OH) Rank Across Cost & Reliability?

Percentile placement of City of Hamilton - (OH) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Hamilton - (OH)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Hamilton - (OH) (Municipal) in Ohio. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Lowest Rate #1,315 / 1,989

### 15.49 c/kWh (-1.41 vs OH)

Commercial avg: 9.95 c/kWh; Industrial: 10.83 c/kWh; est. residential bill $122.97/mo.

Reliability #279 / 751

### 121.1 min/yr (2.02 hrs)

49.8% (60.3 min) from Major Event Days; avg restore 90.4 min (~2.7 kWh @ 1.8 kW).

Post-25D Payback

### 14.1 Years @ 15.49 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,673/yr at 1,350 kWh/kW.

Service Territory

### 27,209 Customers · 1 County

Serves 1 county including Butler in Ohio; state FEMA declarations (2015-2026): 7.

City of Hamilton - (OH) Reliability & Solar Offset Calculation

Backup_Energy = (90.4 min / 60) * 1.8 kW = 2.7 kWh/event | Solar_Offset = 10,800 kWh * $0.1549 = $1,673/yr

EIA-861 2025 Utility ID 7977: Rate=15.49 c/kWh, Cust=27,209, SAIDI=121.1 min.

**Result:** 2.02 outage hrs/yr; 14.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Hamilton - (OH)?

Complete Form EIA-861 filing summary for City of Hamilton - (OH) (ID 7977) covering sales, PV, and counties. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Hamilton - (OH) (Utility ID 7977).

| EIA Utility ID & BA Code | ID 7977 · PJM |
|---|---|
| State & Ownership Type | OH · Municipal |
| Retail Electricity Rates | 15.49 c/kWh Res · 9.95 c Comm · 10.83 c Ind |
| Avg Monthly Usage & Bill | 794.1 kWh/mo ($122.97/mo est.) |
| SAIDI (All Events w/ MED) | 121.1 min/yr (2.02 hrs/yr) |
| SAIDI (Without Major Events) | 60.8 min/yr (Storm share: 49.8%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.34 /yr · 90.4 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Butler) |

## Which Peer Electric Utilities Operate in OH?

Compare City of Hamilton - (OH) directly with Licking Rural Electric Inc and nearby Ohio electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Licking Rural Electric Inc**](https://epri-peac.com/utilities/oh-licking-rural-electric-inc-10668/) | 17.03 c | 244.0 min | 0 | 26,038 |
| [**City of Cuyahoga Falls - (OH)**](https://epri-peac.com/utilities/oh-city-of-cuyahoga-falls-oh-4683/) | 12.73 c | 55.7 min | 25 | 24,256 |
| [**Just Energy Solutions Inc.**](https://epri-peac.com/utilities/oh-just-energy-solutions-inc-4100/) | 10.06 c | — | 0 | 30,282 |
| [**SmartEnergy Holdings, LLC**](https://epri-peac.com/utilities/oh-smartenergy-holdings-llc-58956/) | 11.45 c | — | 0 | 30,590 |

What to Check & Best-Fit Scenarios

## What Should City of Hamilton - (OH) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Hamilton - (OH) (Municipal, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Hamilton - (OH) acts as a wires-only TDU or bundled utility in OH.
- Transformer limits: City of Hamilton - (OH) interconnection engineering still checks neighborhood transformer kVA regardless of 121.1 SAIDI.

### City of Hamilton - (OH) Solar & Battery Evaluators

Compare your actual City of Hamilton - (OH) monthly kWh statement against 15.49 c/kWh and verify current export tariffs in OH.

### City of Hamilton - (OH) Outage & Generator Planners

Use City of Hamilton - (OH)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Hamilton - (OH) (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Hamilton - (OH)'s residential electricity rate and 2026 solar payback?

City of Hamilton - (OH) averages 15.49 c/kWh (-1.41 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,673/yr (14.1-year payback).

### How reliable is City of Hamilton - (OH) compared to peer Ohio utilities?

City of Hamilton - (OH) recorded 121.1 SAIDI outage minutes (2.02 hrs/yr, rank #279 of 751 reporting utilities); compare rates and outage history directly with Licking Rural Electric Inc (17.03 c/kWh) across Ohio.

### Which counties and customers does City of Hamilton - (OH) serve in Ohio?

EIA-861 filings list 27,209 customers across 1 county including Butler, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Hamilton - (OH).

## Related Pages

Explore Ohio energy benchmarks, Licking Rural Electric Inc, county outage profiles, and NEC 705.12 tools alongside City of Hamilton - (OH).

[Ohio State Energy Rates & Utilities](https://epri-peac.com/states/ohio/) [All Ohio County Power & Outage Profiles](https://epri-peac.com/counties/ohio/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.49 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)