Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Cleveland - (OH) (EIA ID 3762, OH) serves 64,905 customers at 16.36 c/kWh (-0.54 c/kWh vs Ohio average) with 224.8 min/yr SAIDI (3.75 hrs/yr) with 182 net-metered residential solar systems (0.28% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3762

- **Res. Rate** : 16.36 c/kWh

- **SAIDI (All Events)** : 224.8 min/yr

- **Net-Metered PV** : 182 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Cleveland - (OH) Compare on Tariffs and Reliability?

How City of Cleveland - (OH) (Municipal) performs across 1 county on kWh rates and outage resilience. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

City of Cleveland - (OH) (Municipal) recorded 224.8 SAIDI outage minutes (3.75 hrs/yr, rank #462 of 751 reporting utilities). Typical residential meters drew 510.8 kWh/mo ($83.58/mo) in 2025, while its tariff bills residential power at 16.36 c/kWh (-0.54 c/kWh vs Ohio average vs. Ohio), offsetting ~$1,767/yr on an 8 kW array—compare rates directly with Archer Energy, LLC (8.59 c/kWh).

## Where Does City of Cleveland - (OH) Sit Across US Utility Rates?

National utility tariff curve marking City of Cleveland - (OH) at 16.36 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Cleveland - (OH) Rank Across Cost & Reliability?

Relative ranking of City of Cleveland - (OH) on residential electricity pricing and annual IEEE SAIDI outage duration. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## What Do EIA-861 Benchmarks Show for City of Cleveland - (OH)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Cleveland - (OH) in Ohio.

Lowest Rate #1,464 / 1,989

### 16.36 c/kWh (-0.54 vs OH)

Commercial avg: 15.94 c/kWh; Industrial: 10.84 c/kWh; est. residential bill $83.58/mo.

Reliability #462 / 751

### 224.8 min/yr (3.75 hrs)

15.0% (33.7 min) from Major Event Days; avg restore 325.8 min (~9.8 kWh @ 1.8 kW).

Post-25D Payback

### 13.4 Years @ 16.36 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,767/yr at 1,350 kWh/kW.

Distributed PV

### 182 Net-Metered Systems

2.123 MW residential PV (0.28% of customers) across 1 county; state FEMA declarations (2015-2026): 7.

City of Cleveland - (OH) Reliability & Solar Offset Calculation

Backup_Energy = (325.8 min / 60) * 1.8 kW = 9.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1636 = $1,767/yr

EIA-861 2025 Utility ID 3762: Rate=16.36 c/kWh, Cust=64,905, SAIDI=224.8 min, PV=182.

**Result:** 3.75 outage hrs/yr; 13.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Cleveland - (OH)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Cleveland - (OH). Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for City of Cleveland - (OH) (Utility ID 3762).

| EIA Utility ID & BA Code | ID 3762 · PJM |
|---|---|
| State & Ownership Type | OH · Municipal |
| Retail Electricity Rates | 16.36 c/kWh Res · 15.94 c Comm · 10.84 c Ind |
| Avg Monthly Usage & Bill | 510.8 kWh/mo ($83.58/mo est.) |
| SAIDI (All Events w/ MED) | 224.8 min/yr (3.75 hrs/yr) |
| SAIDI (Without Major Events) | 191.1 min/yr (Storm share: 15.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.69 /yr · 325.8 min restore |
| Residential Net-Metered PV | 182 systems (2.123 MW) |
| Counties Served (Sample) | 1 county (Cuyahoga) |

## Which Peer Electric Utilities Operate in OH?

Nearby Ohio electric utilities of comparable customer size led by Archer Energy, LLC (8.59 c/kWh). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Archer Energy, LLC**](https://epri-peac.com/utilities/oh-archer-energy-llc-65262/) | 8.59 c | — | 0 | 53,527 |
| [**Direct Energy Services**](https://epri-peac.com/utilities/oh-direct-energy-services-54820/) | 9.54 c | — | 0 | 78,126 |
| [**Constellation NewEnergy, Inc**](https://epri-peac.com/utilities/oh-constellation-newenergy-inc-13374/) | 8.43 c | — | 0 | 96,382 |
| [**SmartEnergy Holdings, LLC**](https://epri-peac.com/utilities/oh-smartenergy-holdings-llc-58956/) | 11.45 c | — | 0 | 30,590 |

What to Check & Best-Fit Scenarios

## What Should City of Cleveland - (OH) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Cleveland - (OH) (Municipal, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Cleveland - (OH) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in OH.
- Export credit rules: check City of Cleveland - (OH)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Cleveland - (OH) Solar & Battery Evaluators

Compare your actual City of Cleveland - (OH) monthly kWh statement against 16.36 c/kWh and verify current export tariffs in OH.

### City of Cleveland - (OH) Outage & Generator Planners

Use City of Cleveland - (OH)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Cleveland - (OH) (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Cleveland - (OH)'s residential electricity rate and 2026 solar payback?

City of Cleveland - (OH) averages 16.36 c/kWh (-0.54 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,767/yr (13.4-year payback).

### How reliable is City of Cleveland - (OH) compared to peer Ohio utilities?

City of Cleveland - (OH) recorded 224.8 SAIDI outage minutes (3.75 hrs/yr, rank #462 of 751 reporting utilities); compare rates and outage history directly with Archer Energy, LLC (8.59 c/kWh) across Ohio.

### Which counties and customers does City of Cleveland - (OH) serve in Ohio?

EIA-861 filings list 64,905 customers across 1 county including Cuyahoga, with 182 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Cleveland - (OH).

## Related Pages

Explore Ohio energy benchmarks, Archer Energy, LLC, county outage profiles, and NEC 705.12 tools alongside City of Cleveland - (OH).

[Ohio State Energy Rates & Utilities](https://epri-peac.com/states/ohio/) [All Ohio County Power & Outage Profiles](https://epri-peac.com/counties/ohio/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.36 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)