EIA-861 Grid Reliability & Net Metering

# City of Celina - (OH) (OH) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Celina - (OH) (EIA ID 3216, OH) serves 7,726 customers at 10.02 c/kWh (-6.88 c/kWh vs Ohio average) with no standalone IEEE SAIDI filing (2 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3216

- **Res. Rate** : 10.02 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Celina - (OH) Compare on Tariffs and Reliability?

EIA-861 rate delta (-6.88 c/kWh vs Ohio average), customer scale (7,726), and 2026 solar payback benchmarks for City of Celina - (OH).

Ranked #141 of 1,989 reporting US utilities for residential rate (top 7.1%; lower than 92.9% of peers), City of Celina - (OH) serves 7,726 accounts in Ohio (Municipal). Commercial power averages 12.37 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Celina - (OH) Sit Across US Utility Rates?

Positions City of Celina - (OH) (10.02 c/kWh) across 1,989 US electric utility residential tariffs. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does City of Celina - (OH) Rank Across Cost & Reliability?

Percentile placement of City of Celina - (OH) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Celina - (OH)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Celina - (OH) (Municipal) in Ohio. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #141 / 1,989

### 10.02 c/kWh (-6.88 vs OH)

Commercial avg: 12.37 c/kWh; Industrial: 8.31 c/kWh; est. residential bill $107.36/mo.

State Reliability Context

### 205.5 min/yr (OH Avg)

Utility did not file separate IEEE SAIDI in 2025; Ohio customer-weighted SAIDI is 205.5 min/yr.

Post-25D Payback

### 21.8 Years @ 10.02 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,082/yr at 1,350 kWh/kW.

Service Territory

### 7,726 Customers · 2 Counties

Serves 2 counties including Auglaize, Mercer in Ohio; state FEMA declarations (2015-2026): 7.

City of Celina - (OH) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1002 = $1,082/yr

EIA-861 2025 Utility ID 3216: Rate=10.02 c/kWh, Cust=7,726.

**Result:** 21.8 yr 8 kW cash payback at 10.02 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Celina - (OH)?

Complete Form EIA-861 filing summary for City of Celina - (OH) (ID 3216) covering sales, PV, and counties. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Celina - (OH) (Utility ID 3216).

| EIA Utility ID & BA Code | ID 3216 · PJM |
|---|---|
| State & Ownership Type | OH · Municipal |
| Retail Electricity Rates | 10.02 c/kWh Res · 12.37 c Comm · 8.31 c Ind |
| Avg Monthly Usage & Bill | 1,071.6 kWh/mo ($107.36/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Auglaize, Mercer) |

## Which Peer Electric Utilities Operate in OH?

Compare City of Celina - (OH) directly with North Central Elec Coop, Inc - (OH) and nearby Ohio electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**North Central Elec Coop, Inc - (OH)**](https://epri-peac.com/utilities/oh-north-central-elec-coop-inc-oh-13693/) | 17.78 c | 165.3 min | 0 | 8,431 |
| [**City of Lebanon - (OH)**](https://epri-peac.com/utilities/oh-city-of-lebanon-oh-10830/) | 12.11 c | — | 22 | 8,852 |
| [**Shipley Choice, LLC**](https://epri-peac.com/utilities/oh-shipley-choice-llc-59410/) | 8.41 c | — | 0 | 8,871 |
| [**City of Orrville - (OH)**](https://epri-peac.com/utilities/oh-city-of-orrville-oh-14194/) | 10.97 c | — | 0 | 6,327 |

What to Check & Best-Fit Scenarios

## What Should City of Celina - (OH) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Celina - (OH) (Municipal, OH) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Celina - (OH) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in OH.
- Export credit rules: check City of Celina - (OH)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Celina - (OH) Solar & Battery Evaluators

Compare your actual City of Celina - (OH) monthly kWh statement against 10.02 c/kWh and verify current export tariffs in OH.

### City of Celina - (OH) Outage & Generator Planners

Use City of Celina - (OH)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Celina - (OH) (Ohio) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Celina - (OH)'s residential electricity rate and 2026 solar payback?

City of Celina - (OH) averages 10.02 c/kWh (-6.88 c/kWh vs Ohio average vs. Ohio). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,082/yr (21.8-year payback).

### How reliable is City of Celina - (OH) compared to peer Ohio utilities?

City of Celina - (OH) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 205.5 min/yr); compare rates and outage history directly with North Central Elec Coop, Inc - (OH) (17.78 c/kWh) across Ohio.

### Which counties and customers does City of Celina - (OH) serve in Ohio?

EIA-861 filings list 7,726 customers across 2 counties including Auglaize, Mercer, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Celina - (OH).

## Related Pages

Explore Ohio energy benchmarks, North Central Elec Coop, Inc - (OH), county outage profiles, and NEC 705.12 tools alongside City of Celina - (OH).

[Ohio State Energy Rates & Utilities](https://epri-peac.com/states/ohio/) [All Ohio County Power & Outage Profiles](https://epri-peac.com/counties/ohio/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.02 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)