---
title: "Rio Grande Electric Coop, Inc (NM) Rate & SAIDI"
url: https://epri-peac.com/utilities/nm-rio-grande-electric-coop-inc-16057/
description: "2025 EIA-861 profile for Rio Grande Electric Coop, Inc (NM): 18.66 c/kWh rate, SAIDI 194.7 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Rio Grande Electric Coop, Inc (NM) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Rio Grande Electric Coop, Inc (EIA ID 16057, NM) serves 232 customers at 18.66 c/kWh (+3.81 c/kWh vs New Mexico average) with 194.7 min/yr SAIDI (3.24 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 16057

- **Res. Rate** : 18.66 c/kWh

- **SAIDI (All Events)** : 194.7 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Rio Grande Electric Coop, Inc Compare on Tariffs and Reliability?

Solar payback, residential tariff (18.66 c/kWh), and outage history inside Rio Grande Electric Coop, Inc territory. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Evaluating solar or generator backup under Rio Grande Electric Coop, Inc (New Mexico) starts with its 18.66 c/kWh residential baseline (+3.81 c/kWh vs New Mexico average) and 11.7-year 8 kW cash payback. EIA-861 records show Rio Grande Electric Coop, Inc recorded 194.7 SAIDI outage minutes (3.24 hrs/yr, rank #402 of 751 reporting utilities) across 232 accounts.

## Where Does Rio Grande Electric Coop, Inc Sit Across US Utility Rates?

Benchmarking Rio Grande Electric Coop, Inc's 18.66 c/kWh residential rate against 1,989 EIA-861 utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does Rio Grande Electric Coop, Inc Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Rio Grande Electric Coop, Inc across New Mexico utilities.

## What Do EIA-861 Benchmarks Show for Rio Grande Electric Coop, Inc?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Rio Grande Electric Coop, Inc in 2025.

Lowest Rate #1,692 / 1,989

### 18.66 c/kWh (+3.81 vs NM)

Commercial avg: 20.62 c/kWh; Industrial: 14.18 c/kWh; est. residential bill $110.85/mo.

Reliability #402 / 751

### 194.7 min/yr (3.24 hrs)

31.0% (60.3 min) from Major Event Days.

Post-25D Payback

### 11.7 Years @ 18.66 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,015/yr at 1,350 kWh/kW.

Service Territory

### 232 Customers · 2 Counties

Serves 2 counties including Eddy, Otero in New Mexico; state FEMA declarations (2015-2026): 45.

Rio Grande Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1866 = $2,015/yr

EIA-861 2025 Utility ID 16057: Rate=18.66 c/kWh, Cust=232, SAIDI=194.7 min.

**Result:** 3.24 outage hrs/yr; 11.7 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Rio Grande Electric Coop, Inc?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 16057. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Rio Grande Electric Coop, Inc (Utility ID 16057).

| EIA Utility ID & BA Code | ID 16057 · EPE |
|---|---|
| State & Ownership Type | NM · Cooperative |
| Retail Electricity Rates | 18.66 c/kWh Res · 20.62 c Comm · 14.18 c Ind |
| Avg Monthly Usage & Bill | 594.1 kWh/mo ($110.85/mo est.) |
| SAIDI (All Events w/ MED) | 194.7 min/yr (3.24 hrs/yr) |
| SAIDI (Without Major Events) | 134.4 min/yr (Storm share: 31.0%) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Eddy, Otero) |

## Which Peer Electric Utilities Operate in NM?

Benchmark Rio Grande Electric Coop, Inc directly against Tesla Inc. and peer New Mexico retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Tesla Inc.**](https://epri-peac.com/utilities/nm-tesla-inc-57313/) | 15.59 c | — | 0 | 343 |
| [**Palmetto Solar, LLC**](https://epri-peac.com/utilities/nm-palmetto-solar-llc-66026/) | 16.01 c | — | 0 | 102 |
| [**Tri-County Electric Coop, Inc (OK)**](https://epri-peac.com/utilities/nm-tri-county-electric-coop-inc-ok-19160/) | 31.43 c | — | 0 | 7 |
| [**Southwestern Electric Coop Inc - (NM)**](https://epri-peac.com/utilities/nm-southwestern-electric-coop-inc-nm-17715/) | 25.31 c | — | 34 | 1,435 |

What to Check & Best-Fit Scenarios

## What Should Rio Grande Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Rio Grande Electric Coop, Inc (Cooperative, NM) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Rio Grande Electric Coop, Inc (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in NM.
- Export credit rules: check Rio Grande Electric Coop, Inc's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Rio Grande Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Rio Grande Electric Coop, Inc monthly kWh statement against 18.66 c/kWh and verify current export tariffs in NM.

### Rio Grande Electric Coop, Inc Outage & Generator Planners

Use Rio Grande Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Rio Grande Electric Coop, Inc (New Mexico) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Rio Grande Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Rio Grande Electric Coop, Inc averages 18.66 c/kWh (+3.81 c/kWh vs New Mexico average vs. New Mexico). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,015/yr (11.7-year payback).

### How reliable is Rio Grande Electric Coop, Inc compared to peer New Mexico utilities?

Rio Grande Electric Coop, Inc recorded 194.7 SAIDI outage minutes (3.24 hrs/yr, rank #402 of 751 reporting utilities); compare rates and outage history directly with Tesla Inc. (15.59 c/kWh) across New Mexico.

### Which counties and customers does Rio Grande Electric Coop, Inc serve in New Mexico?

EIA-861 filings list 232 customers across 2 counties including Eddy, Otero, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Rio Grande Electric Coop, Inc.

## Related Pages

Explore New Mexico energy benchmarks, Tesla Inc., county outage profiles, and NEC 705.12 tools alongside Rio Grande Electric Coop, Inc.

[New Mexico State Energy Rates & Utilities](https://epri-peac.com/states/new-mexico/) [All New Mexico County Power & Outage Profiles](https://epri-peac.com/counties/new-mexico/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 18.66 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
