---
title: "Jemez Mountains Elec Coop, Inc (NM) Rate & SAIDI"
url: https://epri-peac.com/utilities/nm-jemez-mountains-elec-coop-inc-9699/
description: "2025 EIA-861 profile for Jemez Mountains Elec Coop, Inc (NM): 15.76 c/kWh rate, SAIDI 561.7 min/yr, 641 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Jemez Mountains Elec Coop, Inc (NM) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Jemez Mountains Elec Coop, Inc (EIA ID 9699, NM) serves 28,185 customers at 15.76 c/kWh (+0.91 c/kWh vs New Mexico average) with 561.7 min/yr SAIDI (9.36 hrs/yr) with 641 net-metered residential solar systems (2.27% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 9699

- **Res. Rate** : 15.76 c/kWh

- **SAIDI (All Events)** : 561.7 min/yr

- **Net-Metered PV** : 641 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Jemez Mountains Elec Coop, Inc Compare on Tariffs and Reliability?

EIA-861 rate delta (+0.91 c/kWh vs New Mexico average), customer scale (28,185), and 2026 solar payback benchmarks for Jemez Mountains Elec Coop, Inc.

Ranked #1,365 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 31.3% of peers), Jemez Mountains Elec Coop, Inc serves 28,185 accounts in New Mexico (Cooperative). Commercial power averages 15.2 c/kWh. It logged 561.7 SAIDI outage minutes (9.36 hrs/yr, 15.9% storm-driven), making battery backup or a standby ATS worthwhile, with 641 net-metered residential solar systems (2.27% customer adoption).

## Where Does Jemez Mountains Elec Coop, Inc Sit Across US Utility Rates?

Positions Jemez Mountains Elec Coop, Inc (15.76 c/kWh) across 1,989 US electric utility residential tariffs. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## How Does Jemez Mountains Elec Coop, Inc Rank Across Cost & Reliability?

Percentile placement of Jemez Mountains Elec Coop, Inc across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Jemez Mountains Elec Coop, Inc?

Four key EIA-861 rate, outage, and solar payback benchmarks for Jemez Mountains Elec Coop, Inc (Cooperative) in New Mexico.

Lowest Rate #1,365 / 1,989

### 15.76 c/kWh (+0.91 vs NM)

Commercial avg: 15.2 c/kWh; Industrial: 12.58 c/kWh; est. residential bill $89.84/mo.

Reliability #653 / 751

### 561.7 min/yr (9.36 hrs)

15.9% (89.3 min) from Major Event Days; avg restore 147.4 min (~4.4 kWh @ 1.8 kW).

Post-25D Payback

### 13.9 Years @ 15.76 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,702/yr at 1,350 kWh/kW.

Distributed PV

### 641 Net-Metered Systems

3.743 MW residential PV (2.27% of customers) across 5 counties; state FEMA declarations (2015-2026): 45.

Jemez Mountains Elec Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (147.4 min / 60) * 1.8 kW = 4.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1576 = $1,702/yr

EIA-861 2025 Utility ID 9699: Rate=15.76 c/kWh, Cust=28,185, SAIDI=561.7 min, PV=641.

**Result:** 9.36 outage hrs/yr; 13.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Jemez Mountains Elec Coop, Inc?

Complete Form EIA-861 filing summary for Jemez Mountains Elec Coop, Inc (ID 9699) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for Jemez Mountains Elec Coop, Inc (Utility ID 9699).

| EIA Utility ID & BA Code | ID 9699 · WALC |
|---|---|
| State & Ownership Type | NM · Cooperative |
| Retail Electricity Rates | 15.76 c/kWh Res · 15.2 c Comm · 12.58 c Ind |
| Avg Monthly Usage & Bill | 570.0 kWh/mo ($89.84/mo est.) |
| SAIDI (All Events w/ MED) | 561.7 min/yr (9.36 hrs/yr) |
| SAIDI (Without Major Events) | 472.4 min/yr (Storm share: 15.9%) |
| SAIFI & CAIDI (Per-Outage Avg) | 3.81 /yr · 147.4 min restore |
| Residential Net-Metered PV | 641 systems (3.743 MW) |
| Counties Served (Sample) | 5 counties (McKinley, Rio Arriba, San Juan, Sandoval, Santa Fe) |

## Which Peer Electric Utilities Operate in NM?

Compare Jemez Mountains Elec Coop, Inc directly with Kit Carson Electric Coop, Inc and nearby New Mexico electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Kit Carson Electric Coop, Inc**](https://epri-peac.com/utilities/nm-kit-carson-electric-coop-inc-10378/) | 15.68 c | 305.0 min | 451 | 26,286 |
| [**Continental Divide El Coop Inc**](https://epri-peac.com/utilities/nm-continental-divide-el-coop-inc-4265/) | 16.87 c | 234.5 min | 142 | 20,474 |
| [**City of Farmington - (NM)**](https://epri-peac.com/utilities/nm-city-of-farmington-nm-6204/) | 12.95 c | 75.2 min | 489 | 36,031 |
| [**Central New Mexico El Coop, Inc**](https://epri-peac.com/utilities/nm-central-new-mexico-el-coop-inc-3273/) | 17.39 c | — | 821 | 19,323 |

What to Check & Best-Fit Scenarios

## What Should Jemez Mountains Elec Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Jemez Mountains Elec Coop, Inc (Cooperative, NM) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Jemez Mountains Elec Coop, Inc acts as a wires-only TDU or bundled utility in NM.
- Transformer limits: Jemez Mountains Elec Coop, Inc interconnection engineering still checks neighborhood transformer kVA regardless of 561.7 SAIDI.

### Jemez Mountains Elec Coop, Inc Solar & Battery Evaluators

Compare your actual Jemez Mountains Elec Coop, Inc monthly kWh statement against 15.76 c/kWh and verify current export tariffs in NM.

### Jemez Mountains Elec Coop, Inc Outage & Generator Planners

Use Jemez Mountains Elec Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Jemez Mountains Elec Coop, Inc (New Mexico) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Jemez Mountains Elec Coop, Inc's residential electricity rate and 2026 solar payback?

Jemez Mountains Elec Coop, Inc averages 15.76 c/kWh (+0.91 c/kWh vs New Mexico average vs. New Mexico). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,702/yr (13.9-year payback).

### How reliable is Jemez Mountains Elec Coop, Inc compared to peer New Mexico utilities?

Jemez Mountains Elec Coop, Inc logged 561.7 SAIDI outage minutes (9.36 hrs/yr, 15.9% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Kit Carson Electric Coop, Inc (15.68 c/kWh) across New Mexico.

### Which counties and customers does Jemez Mountains Elec Coop, Inc serve in New Mexico?

EIA-861 filings list 28,185 customers across 5 counties including McKinley, Rio Arriba, San Juan, with 641 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Jemez Mountains Elec Coop, Inc.

## Related Pages

Explore New Mexico energy benchmarks, Kit Carson Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Jemez Mountains Elec Coop, Inc.

[New Mexico State Energy Rates & Utilities](https://epri-peac.com/states/new-mexico/) [All New Mexico County Power & Outage Profiles](https://epri-peac.com/counties/new-mexico/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.76 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
