---
title: "Farmers Electric Coop, Inc (NM) Rate & SAIDI"
url: https://epri-peac.com/utilities/nm-farmers-electric-coop-inc-nm-6198/
description: "2025 EIA-861 profile for Farmers Electric Coop, Inc - (NM) (NM): 13.68 c/kWh rate, SAIDI 198.0 min/yr, 63 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Farmers Electric Coop, Inc - (NM) (NM) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Farmers Electric Coop, Inc - (NM) (EIA ID 6198, NM) serves 10,310 customers at 13.68 c/kWh (-1.17 c/kWh vs New Mexico average) with 198.0 min/yr SAIDI (3.3 hrs/yr) with 63 net-metered residential solar systems (0.61% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6198

- **Res. Rate** : 13.68 c/kWh

- **SAIDI (All Events)** : 198.0 min/yr

- **Net-Metered PV** : 63 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Farmers Electric Coop, Inc - (NM) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.68 c/kWh), and outage history inside Farmers Electric Coop, Inc - (NM) territory. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Homeowners inside Farmers Electric Coop, Inc - (NM)'s New Mexico footprint (7 counties including Curry, De Baca, Guadalupe) face 13.68 c/kWh benchmark pricing (-4.86 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 16.0 years. Reliability data recorded 198.0 SAIDI outage minutes (3.3 hrs/yr, rank #412 of 751 reporting utilities).

## Where Does Farmers Electric Coop, Inc - (NM) Sit Across US Utility Rates?

Benchmarking Farmers Electric Coop, Inc - (NM)'s 13.68 c/kWh residential rate against 1,989 EIA-861 utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does Farmers Electric Coop, Inc - (NM) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Farmers Electric Coop, Inc - (NM) across New Mexico utilities.

## What Do EIA-861 Benchmarks Show for Farmers Electric Coop, Inc - (NM)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Farmers Electric Coop, Inc - (NM) in 2025.

Lowest Rate #865 / 1,989

### 13.68 c/kWh (-1.17 vs NM)

Commercial avg: 13.18 c/kWh; Industrial: 9.53 c/kWh; est. residential bill $111.99/mo.

Reliability #412 / 751

### 198.0 min/yr (3.3 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 129.6 min (~3.9 kWh @ 1.8 kW).

Post-25D Payback

### 16.0 Years @ 13.68 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,477/yr at 1,350 kWh/kW.

Distributed PV

### 63 Net-Metered Systems

0.539 MW residential PV (0.61% of customers) across 7 counties; state FEMA declarations (2015-2026): 45.

Farmers Electric Coop, Inc - (NM) Reliability & Solar Offset Calculation

Backup_Energy = (129.6 min / 60) * 1.8 kW = 3.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1368 = $1,477/yr

EIA-861 2025 Utility ID 6198: Rate=13.68 c/kWh, Cust=10,310, SAIDI=198.0 min, PV=63.

**Result:** 3.3 outage hrs/yr; 16.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Farmers Electric Coop, Inc - (NM)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 6198. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Farmers Electric Coop, Inc - (NM) (Utility ID 6198).

| EIA Utility ID & BA Code | ID 6198 · SWPP |
|---|---|
| State & Ownership Type | NM · Cooperative |
| Retail Electricity Rates | 13.68 c/kWh Res · 13.18 c Comm · 9.53 c Ind |
| Avg Monthly Usage & Bill | 818.5 kWh/mo ($111.99/mo est.) |
| SAIDI (All Events w/ MED) | 198.0 min/yr (3.3 hrs/yr) |
| SAIDI (Without Major Events) | 198.0 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.528 /yr · 129.6 min restore |
| Residential Net-Metered PV | 63 systems (0.539 MW) |
| Counties Served (Sample) | 7 counties (Curry, De Baca, Guadalupe, Harding, Quay, Roosevelt, San Miguel) |

## Which Peer Electric Utilities Operate in NM?

Benchmark Farmers Electric Coop, Inc - (NM) directly against Navajo Tribal Utility Authority and peer New Mexico retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Navajo Tribal Utility Authority**](https://epri-peac.com/utilities/nm-navajo-tribal-utility-authority-13314/) | 16.44 c | — | 0 | 9,768 |
| [**Los Alamos County - (NM)**](https://epri-peac.com/utilities/nm-los-alamos-county-nm-11204/) | 14.79 c | 19.5 min | 514 | 8,395 |
| [**Lea County Electric Coop, Inc - (NM)**](https://epri-peac.com/utilities/nm-lea-county-electric-coop-inc-nm-10817/) | 11.03 c | — | 0 | 7,292 |
| [**Central Valley Elec Coop, Inc**](https://epri-peac.com/utilities/nm-central-valley-elec-coop-inc-3287/) | 9.79 c | 326.3 min | 69 | 6,167 |

What to Check & Best-Fit Scenarios

## What Should Farmers Electric Coop, Inc - (NM) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Farmers Electric Coop, Inc - (NM) (Cooperative, NM) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Farmers Electric Coop, Inc - (NM) (NM) shift real bills away from 13.68 c/kWh.
- Outage clustering: Major Event Days skew Farmers Electric Coop, Inc - (NM) annual minutes differently than routine non-storm reliability.

### Farmers Electric Coop, Inc - (NM) Solar & Battery Evaluators

Compare your actual Farmers Electric Coop, Inc - (NM) monthly kWh statement against 13.68 c/kWh and verify current export tariffs in NM.

### Farmers Electric Coop, Inc - (NM) Outage & Generator Planners

Use Farmers Electric Coop, Inc - (NM)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Farmers Electric Coop, Inc - (NM) (New Mexico) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Farmers Electric Coop, Inc - (NM)'s residential electricity rate and 2026 solar payback?

Farmers Electric Coop, Inc - (NM) averages 13.68 c/kWh (-1.17 c/kWh vs New Mexico average vs. New Mexico). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,477/yr (16.0-year payback).

### How reliable is Farmers Electric Coop, Inc - (NM) compared to peer New Mexico utilities?

Farmers Electric Coop, Inc - (NM) recorded 198.0 SAIDI outage minutes (3.3 hrs/yr, rank #412 of 751 reporting utilities); compare rates and outage history directly with Navajo Tribal Utility Authority (16.44 c/kWh) across New Mexico.

### Which counties and customers does Farmers Electric Coop, Inc - (NM) serve in New Mexico?

EIA-861 filings list 10,310 customers across 7 counties including Curry, De Baca, Guadalupe, with 63 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Farmers Electric Coop, Inc - (NM).

## Related Pages

Explore New Mexico energy benchmarks, Navajo Tribal Utility Authority, county outage profiles, and NEC 705.12 tools alongside Farmers Electric Coop, Inc - (NM).

[New Mexico State Energy Rates & Utilities](https://epri-peac.com/states/new-mexico/) [All New Mexico County Power & Outage Profiles](https://epri-peac.com/counties/new-mexico/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.68 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
