---
title: "Continental Divide El Coop Inc (NM) Rate & SAIDI"
url: https://epri-peac.com/utilities/nm-continental-divide-el-coop-inc-4265/
description: "2025 EIA-861 profile for Continental Divide El Coop Inc (NM): 16.87 c/kWh rate, SAIDI 234.5 min/yr, 142 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Continental Divide El Coop Inc (NM) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Continental Divide El Coop Inc (EIA ID 4265, NM) serves 20,474 customers at 16.87 c/kWh (+2.02 c/kWh vs New Mexico average) with 234.5 min/yr SAIDI (3.91 hrs/yr) with 142 net-metered residential solar systems (0.69% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4265

- **Res. Rate** : 16.87 c/kWh

- **SAIDI (All Events)** : 234.5 min/yr

- **Net-Metered PV** : 142 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Continental Divide El Coop Inc Compare on Tariffs and Reliability?

How Continental Divide El Coop Inc (Cooperative) performs across 5 counties on kWh rates and outage resilience. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Across 5 counties including Bernalillo, Cibola, McKinley, Continental Divide El Coop Inc bills residential power at 16.87 c/kWh (+2.02 c/kWh vs New Mexico average vs. New Mexico), offsetting ~$1,822/yr on an 8 kW array compared to peer Central New Mexico El Coop, Inc (17.39 c/kWh). With 20,474 customer accounts (Cooperative), 2025 Form EIA-861 shows Continental Divide El Coop Inc recorded 234.5 SAIDI outage minutes (3.91 hrs/yr, rank #473 of 751 reporting utilities), with 142 net-metered residential solar systems (0.69% customer adoption).

## Where Does Continental Divide El Coop Inc Sit Across US Utility Rates?

National utility tariff curve marking Continental Divide El Coop Inc at 16.87 c/kWh vs. 18.54 c/kWh US mean.

## How Does Continental Divide El Coop Inc Rank Across Cost & Reliability?

Relative ranking of Continental Divide El Coop Inc on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Continental Divide El Coop Inc?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Continental Divide El Coop Inc in New Mexico.

Lowest Rate #1,531 / 1,989

### 16.87 c/kWh (+2.02 vs NM)

Commercial avg: 14.27 c/kWh; Industrial: 6.95 c/kWh; est. residential bill $99.89/mo.

Reliability #473 / 751

### 234.5 min/yr (3.91 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 153.3 min (~4.6 kWh @ 1.8 kW).

Post-25D Payback

### 13.0 Years @ 16.87 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,822/yr at 1,350 kWh/kW.

Distributed PV

### 142 Net-Metered Systems

0.803 MW residential PV (0.69% of customers) across 5 counties; state FEMA declarations (2015-2026): 45.

Continental Divide El Coop Inc Reliability & Solar Offset Calculation

Backup_Energy = (153.3 min / 60) * 1.8 kW = 4.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1687 = $1,822/yr

EIA-861 2025 Utility ID 4265: Rate=16.87 c/kWh, Cust=20,474, SAIDI=234.5 min, PV=142.

**Result:** 3.91 outage hrs/yr; 13.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Continental Divide El Coop Inc?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Continental Divide El Coop Inc. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for Continental Divide El Coop Inc (Utility ID 4265).

| EIA Utility ID & BA Code | ID 4265 · PNM |
|---|---|
| State & Ownership Type | NM · Cooperative |
| Retail Electricity Rates | 16.87 c/kWh Res · 14.27 c Comm · 6.95 c Ind |
| Avg Monthly Usage & Bill | 592.3 kWh/mo ($99.89/mo est.) |
| SAIDI (All Events w/ MED) | 234.5 min/yr (3.91 hrs/yr) |
| SAIDI (Without Major Events) | 234.5 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.53 /yr · 153.3 min restore |
| Residential Net-Metered PV | 142 systems (0.803 MW) |
| Counties Served (Sample) | 5 counties (Bernalillo, Cibola, McKinley, Sandoval, Valencia) |

## Which Peer Electric Utilities Operate in NM?

Nearby New Mexico electric utilities of comparable customer size led by Central New Mexico El Coop, Inc (17.39 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Central New Mexico El Coop, Inc**](https://epri-peac.com/utilities/nm-central-new-mexico-el-coop-inc-3273/) | 17.39 c | — | 821 | 19,323 |
| [**Otero County Electric Coop Inc**](https://epri-peac.com/utilities/nm-otero-county-electric-coop-inc-14224/) | 19.56 c | — | 1,239 | 16,517 |
| [**Kit Carson Electric Coop, Inc**](https://epri-peac.com/utilities/nm-kit-carson-electric-coop-inc-10378/) | 15.68 c | 305.0 min | 451 | 26,286 |
| [**Jemez Mountains Elec Coop, Inc**](https://epri-peac.com/utilities/nm-jemez-mountains-elec-coop-inc-9699/) | 15.76 c | 561.7 min | 641 | 28,185 |

What to Check & Best-Fit Scenarios

## What Should Continental Divide El Coop Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Continental Divide El Coop Inc (Cooperative, NM) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Continental Divide El Coop Inc (NM) shift real bills away from 16.87 c/kWh.
- Outage clustering: Major Event Days skew Continental Divide El Coop Inc annual minutes differently than routine non-storm reliability.

### Continental Divide El Coop Inc Solar & Battery Evaluators

Compare your actual Continental Divide El Coop Inc monthly kWh statement against 16.87 c/kWh and verify current export tariffs in NM.

### Continental Divide El Coop Inc Outage & Generator Planners

Use Continental Divide El Coop Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Continental Divide El Coop Inc (New Mexico) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Continental Divide El Coop Inc's residential electricity rate and 2026 solar payback?

Continental Divide El Coop Inc averages 16.87 c/kWh (+2.02 c/kWh vs New Mexico average vs. New Mexico). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,822/yr (13.0-year payback).

### How reliable is Continental Divide El Coop Inc compared to peer New Mexico utilities?

Continental Divide El Coop Inc recorded 234.5 SAIDI outage minutes (3.91 hrs/yr, rank #473 of 751 reporting utilities); compare rates and outage history directly with Central New Mexico El Coop, Inc (17.39 c/kWh) across New Mexico.

### Which counties and customers does Continental Divide El Coop Inc serve in New Mexico?

EIA-861 filings list 20,474 customers across 5 counties including Bernalillo, Cibola, McKinley, with 142 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Continental Divide El Coop Inc.

## Related Pages

Explore New Mexico energy benchmarks, Central New Mexico El Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Continental Divide El Coop Inc.

[New Mexico State Energy Rates & Utilities](https://epri-peac.com/states/new-mexico/) [All New Mexico County Power & Outage Profiles](https://epri-peac.com/counties/new-mexico/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.87 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
