description: "2025 EIA-861 profile for TriEagle Energy, L.P. (NJ): 16.14 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# TriEagle Energy, L.P. (NJ) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

TriEagle Energy, L.P. (EIA ID 19126, NJ) serves 276 customers at 16.14 c/kWh (-6.34 c/kWh vs New Jersey average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 19126

- **Res. Rate** : 16.14 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does TriEagle Energy, L.P. Compare on Tariffs and Reliability?

EIA-861 rate delta (-6.34 c/kWh vs New Jersey average), customer scale (276), and 2026 solar payback benchmarks for TriEagle Energy, L.P..

Ranked #1,421 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 28.4% of peers), TriEagle Energy, L.P. serves 276 accounts in New Jersey (Retail Power Marketer). Commercial power averages 15.19 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 155.0 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does TriEagle Energy, L.P. Sit Across US Utility Rates?

Positions TriEagle Energy, L.P. (16.14 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does TriEagle Energy, L.P. Rank Across Cost & Reliability?

Percentile placement of TriEagle Energy, L.P. across retail kWh electricity cost and IEEE grid reliability outage metrics. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## What Do EIA-861 Benchmarks Show for TriEagle Energy, L.P.?

Four key EIA-861 rate, outage, and solar payback benchmarks for TriEagle Energy, L.P. (Retail Power Marketer) in New Jersey.

Lowest Rate #1,421 / 1,989

### 16.14 c/kWh (-6.34 vs NJ)

Commercial avg: 15.19 c/kWh; est. residential bill $139.73/mo.

State Reliability Context

### 155.0 min/yr (NJ Avg)

Utility did not file separate IEEE SAIDI in 2025; New Jersey customer-weighted SAIDI is 155.0 min/yr.

Post-25D Payback

### 13.5 Years @ 16.14 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,743/yr at 1,350 kWh/kW.

Service Territory

### 276 Customers · 0 Counties

Serves 0 counties in New Jersey; state FEMA declarations (2015-2026): 11.

TriEagle Energy, L.P. Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1614 = $1,743/yr

EIA-861 2025 Utility ID 19126: Rate=16.14 c/kWh, Cust=276.

**Result:** 13.5 yr 8 kW cash payback at 16.14 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for TriEagle Energy, L.P.?

Complete Form EIA-861 filing summary for TriEagle Energy, L.P. (ID 19126) covering sales, PV, and counties. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for TriEagle Energy, L.P. (Utility ID 19126).

| EIA Utility ID & BA Code | ID 19126 · PJM |
|---|---|
| State & Ownership Type | NJ · Retail Power Marketer |
| Retail Electricity Rates | 16.14 c/kWh Res · 15.19 c Comm |
| Avg Monthly Usage & Bill | 865.6 kWh/mo ($139.73/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in NJ?

Compare TriEagle Energy, L.P. directly with NextEra Energy Services, LLC and nearby New Jersey electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**NextEra Energy Services, LLC**](https://epri-peac.com/utilities/nj-nextera-energy-services-llc-7279/) | 17.51 c | — | 0 | 258 |
| [**ENGIE Power & Gas LLC**](https://epri-peac.com/utilities/nj-engie-power-gas-llc-57307/) | 20.8 c | — | 0 | 258 |
| [**Harborside Energy, LLC**](https://epri-peac.com/utilities/nj-harborside-energy-llc-58978/) | 23.3 c | — | 0 | 231 |
| [**Vista Energy Marketing, L.P.**](https://epri-peac.com/utilities/nj-vista-energy-marketing-l-p-60696/) | 19.97 c | — | 0 | 217 |

What to Check & Best-Fit Scenarios

## What Should TriEagle Energy, L.P. Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for TriEagle Energy, L.P. (Retail Power Marketer, NJ) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether TriEagle Energy, L.P. acts as a wires-only TDU or bundled utility in NJ.
- Transformer limits: TriEagle Energy, L.P. interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### TriEagle Energy, L.P. Solar & Battery Evaluators

Compare your actual TriEagle Energy, L.P. monthly kWh statement against 16.14 c/kWh and verify current export tariffs in NJ.

### TriEagle Energy, L.P. Outage & Generator Planners

Use TriEagle Energy, L.P.'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for TriEagle Energy, L.P. (New Jersey) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is TriEagle Energy, L.P.'s residential electricity rate and 2026 solar payback?

TriEagle Energy, L.P. averages 16.14 c/kWh (-6.34 c/kWh vs New Jersey average vs. New Jersey). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,743/yr (13.5-year payback).

### How reliable is TriEagle Energy, L.P. compared to peer New Jersey utilities?

TriEagle Energy, L.P. did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 155.0 min/yr); compare rates and outage history directly with NextEra Energy Services, LLC (17.51 c/kWh) across New Jersey.

### Which counties and customers does TriEagle Energy, L.P. serve in New Jersey?

EIA-861 filings list 276 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting TriEagle Energy, L.P..

## Related Pages

Explore New Jersey energy benchmarks, NextEra Energy Services, LLC, county outage profiles, and NEC 705.12 tools alongside TriEagle Energy, L.P..

[New Jersey State Energy Rates & Utilities](https://epri-peac.com/states/new-jersey/) [All New Jersey County Power & Outage Profiles](https://epri-peac.com/counties/new-jersey/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.14 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)