# Green Mountain Energy Company (NJ) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Green Mountain Energy Company (EIA ID 7554, NJ) serves 842 customers at 18.8 c/kWh (-3.68 c/kWh vs New Jersey average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7554

- **Res. Rate** : 18.8 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Green Mountain Energy Company Compare on Tariffs and Reliability?

Solar payback, residential tariff (18.8 c/kWh), and outage history inside Green Mountain Energy Company territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Evaluating solar or generator backup under Green Mountain Energy Company (New Jersey) starts with its 18.8 c/kWh residential baseline (-3.68 c/kWh vs New Jersey average) and 11.6-year 8 kW cash payback. EIA-861 records show Green Mountain Energy Company did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 155.0 min/yr) across 842 accounts.

## Where Does Green Mountain Energy Company Sit Across US Utility Rates?

Benchmarking Green Mountain Energy Company's 18.8 c/kWh residential rate against 1,989 EIA-861 utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does Green Mountain Energy Company Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Green Mountain Energy Company across New Jersey utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Green Mountain Energy Company?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Green Mountain Energy Company in 2025.

Lowest Rate #1,703 / 1,989

### 18.8 c/kWh (-3.68 vs NJ)

Commercial avg: 9.83 c/kWh; est. residential bill $116.34/mo.

State Reliability Context

### 155.0 min/yr (NJ Avg)

Utility did not file separate IEEE SAIDI in 2025; New Jersey customer-weighted SAIDI is 155.0 min/yr.

Post-25D Payback

### 11.6 Years @ 18.8 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,030/yr at 1,350 kWh/kW.

Service Territory

### 842 Customers · 0 Counties

Serves 0 counties in New Jersey; state FEMA declarations (2015-2026): 11.

Green Mountain Energy Company Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1880 = $2,030/yr

EIA-861 2025 Utility ID 7554: Rate=18.8 c/kWh, Cust=842.

**Result:** 11.6 yr 8 kW cash payback at 18.8 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Green Mountain Energy Company?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 7554. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for Green Mountain Energy Company (Utility ID 7554).

| EIA Utility ID & BA Code | ID 7554 · PJM |
|---|---|
| State & Ownership Type | NJ · Retail Power Marketer |
| Retail Electricity Rates | 18.8 c/kWh Res · 9.83 c Comm |
| Avg Monthly Usage & Bill | 618.7 kWh/mo ($116.34/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in NJ?

Benchmark Green Mountain Energy Company directly against Discount Power Inc - (CT) and peer New Jersey retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Discount Power Inc - (CT)**](https://epri-peac.com/utilities/nj-discount-power-inc-ct-59993/) | 22.62 c | — | 0 | 864 |
| [**Just Energy Solutions Inc.**](https://epri-peac.com/utilities/nj-just-energy-solutions-inc-4100/) | 17.76 c | — | 0 | 787 |
| [**Rushmore Energy, LLC**](https://epri-peac.com/utilities/nj-rushmore-energy-llc-59807/) | 17.45 c | — | 0 | 916 |
| [**Palmetto Solar, LLC**](https://epri-peac.com/utilities/nj-palmetto-solar-llc-66026/) | 19.81 c | — | 0 | 719 |

What to Check & Best-Fit Scenarios

## What Should Green Mountain Energy Company Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Green Mountain Energy Company (Retail Power Marketer, NJ) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Green Mountain Energy Company acts as a wires-only TDU or bundled utility in NJ.
- Transformer limits: Green Mountain Energy Company interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### Green Mountain Energy Company Solar & Battery Evaluators

Compare your actual Green Mountain Energy Company monthly kWh statement against 18.8 c/kWh and verify current export tariffs in NJ.

### Green Mountain Energy Company Outage & Generator Planners

Use Green Mountain Energy Company's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Green Mountain Energy Company (New Jersey) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Green Mountain Energy Company's residential electricity rate and 2026 solar payback?

Green Mountain Energy Company averages 18.8 c/kWh (-3.68 c/kWh vs New Jersey average vs. New Jersey). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,030/yr (11.6-year payback).

### How reliable is Green Mountain Energy Company compared to peer New Jersey utilities?

Green Mountain Energy Company did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 155.0 min/yr); compare rates and outage history directly with Discount Power Inc - (CT) (22.62 c/kWh) across New Jersey.

### Which counties and customers does Green Mountain Energy Company serve in New Jersey?

EIA-861 filings list 842 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Green Mountain Energy Company.

## Related Pages

Explore New Jersey energy benchmarks, Discount Power Inc - (CT), county outage profiles, and NEC 705.12 tools alongside Green Mountain Energy Company.

[New Jersey State Energy Rates & Utilities](https://epri-peac.com/states/new-jersey/) [All New Jersey County Power & Outage Profiles](https://epri-peac.com/counties/new-jersey/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 18.8 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)