# Norris Public Power District (NE) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Norris Public Power District (EIA ID 13664, NE) serves 19,395 customers at 9.54 c/kWh (-2.51 c/kWh vs Nebraska average) with 2,541.4 min/yr SAIDI (42.36 hrs/yr) with 172 net-metered residential solar systems (0.89% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 13664

- **Res. Rate** : 9.54 c/kWh

- **SAIDI (All Events)** : 2,541.4 min/yr

- **Net-Metered PV** : 172 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Norris Public Power District Compare on Tariffs and Reliability?

Solar payback, residential tariff (9.54 c/kWh), and outage history inside Norris Public Power District territory. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Evaluating solar or generator backup under Norris Public Power District (Nebraska) starts with its 9.54 c/kWh residential baseline (-2.51 c/kWh vs Nebraska average) and 22.9-year 8 kW cash payback. EIA-861 records show Norris Public Power District logged 2,541.4 SAIDI outage minutes (42.36 hrs/yr, 81.7% storm-driven), making battery backup or a standby ATS worthwhile across 19,395 accounts.

## Where Does Norris Public Power District Sit Across US Utility Rates?

Benchmarking Norris Public Power District's 9.54 c/kWh residential rate against 1,989 EIA-861 utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does Norris Public Power District Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Norris Public Power District across Nebraska utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for Norris Public Power District?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Norris Public Power District in 2025.

Lowest Rate #102 / 1,989

### 9.54 c/kWh (-2.51 vs NE)

Commercial avg: 10.45 c/kWh; Industrial: 7.69 c/kWh; est. residential bill $147.86/mo.

Reliability #746 / 751

### 2,541.4 min/yr (42.36 hrs)

81.7% (2,076.6 min) from Major Event Days; avg restore 813.5 min (~24.4 kWh @ 1.8 kW).

Post-25D Payback

### 22.9 Years @ 9.54 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,030/yr at 1,350 kWh/kW.

Distributed PV

### 172 Net-Metered Systems

2.003 MW residential PV (0.89% of customers) across 6 counties; state FEMA declarations (2015-2026): 29.

Norris Public Power District Reliability & Solar Offset Calculation

Backup_Energy = (813.5 min / 60) * 1.8 kW = 24.4 kWh/event | Solar_Offset = 10,800 kWh * $0.0954 = $1,030/yr

EIA-861 2025 Utility ID 13664: Rate=9.54 c/kWh, Cust=19,395, SAIDI=2,541.4 min, PV=172.

**Result:** 42.36 outage hrs/yr; 22.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Norris Public Power District?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 13664. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Norris Public Power District (Utility ID 13664).

| EIA Utility ID & BA Code | ID 13664 · SWPP |
|---|---|
| State & Ownership Type | NE · Political Subdivision |
| Retail Electricity Rates | 9.54 c/kWh Res · 10.45 c Comm · 7.69 c Ind |
| Avg Monthly Usage & Bill | 1,549.8 kWh/mo ($147.86/mo est.) |
| SAIDI (All Events w/ MED) | 2,541.4 min/yr (42.36 hrs/yr) |
| SAIDI (Without Major Events) | 464.8 min/yr (Storm share: 81.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 3.124 /yr · 813.5 min restore |
| Residential Net-Metered PV | 172 systems (2.003 MW) |
| Counties Served (Sample) | 6 counties (Gage, Jefferson, Lancaster, Saline, Seward, Thayer) |

## Which Peer Electric Utilities Operate in NE?

Benchmark Norris Public Power District directly against Loup River Public Power Dist and peer Nebraska retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Loup River Public Power Dist**](https://epri-peac.com/utilities/ne-loup-river-public-power-dist-11251/) | 10.82 c | — | 0 | 16,449 |
| [**City of Grand Island - (NE)**](https://epri-peac.com/utilities/ne-city-of-grand-island-ne-40606/) | 10.32 c | 37.1 min | 12 | 22,563 |
| [**Dawson Power District**](https://epri-peac.com/utilities/ne-dawson-power-district-4911/) | 11.32 c | — | 61 | 16,116 |
| [**Southern Public Power District**](https://epri-peac.com/utilities/ne-southern-public-power-district-17642/) | 9.1 c | — | 46 | 15,389 |

What to Check & Best-Fit Scenarios

## What Should Norris Public Power District Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Norris Public Power District (Political Subdivision, NE) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Norris Public Power District acts as a wires-only TDU or bundled utility in NE.
- Transformer limits: Norris Public Power District interconnection engineering still checks neighborhood transformer kVA regardless of 2,541.4 SAIDI.

### Norris Public Power District Solar & Battery Evaluators

Compare your actual Norris Public Power District monthly kWh statement against 9.54 c/kWh and verify current export tariffs in NE.

### Norris Public Power District Outage & Generator Planners

Use Norris Public Power District's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Norris Public Power District (Nebraska) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Norris Public Power District's residential electricity rate and 2026 solar payback?

Norris Public Power District averages 9.54 c/kWh (-2.51 c/kWh vs Nebraska average vs. Nebraska). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,030/yr (22.9-year payback).

### How reliable is Norris Public Power District compared to peer Nebraska utilities?

Norris Public Power District logged 2,541.4 SAIDI outage minutes (42.36 hrs/yr, 81.7% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Loup River Public Power Dist (10.82 c/kWh) across Nebraska.

### Which counties and customers does Norris Public Power District serve in Nebraska?

EIA-861 filings list 19,395 customers across 6 counties including Gage, Jefferson, Lancaster, with 172 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Norris Public Power District.

## Related Pages

Explore Nebraska energy benchmarks, Loup River Public Power Dist, county outage profiles, and NEC 705.12 tools alongside Norris Public Power District.

[Nebraska State Energy Rates & Utilities](https://epri-peac.com/states/nebraska/) [All Nebraska County Power & Outage Profiles](https://epri-peac.com/counties/nebraska/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.54 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)