# Lincoln Electric System (NE) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Lincoln Electric System (EIA ID 11018, NE) serves 136,859 customers at 11.15 c/kWh (-0.90 c/kWh vs Nebraska average) with 240.5 min/yr SAIDI (4.01 hrs/yr) with 604 net-metered residential solar systems (0.44% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11018

- **Res. Rate** : 11.15 c/kWh

- **SAIDI (All Events)** : 240.5 min/yr

- **Net-Metered PV** : 604 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Lincoln Electric System Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.90 c/kWh vs Nebraska average), customer scale (136,859), and 2026 solar payback benchmarks for Lincoln Electric System.

Ranked #264 of 1,989 reporting US utilities for residential rate (top 13.3%; lower than 86.7% of peers), Lincoln Electric System serves 136,859 accounts in Nebraska (Municipal). Commercial power averages 8.93 c/kWh. It logged 240.5 SAIDI outage minutes (4.01 hrs/yr, 92.3% storm-driven), making battery backup or a standby ATS worthwhile, with 604 net-metered residential solar systems (0.44% customer adoption).

## Where Does Lincoln Electric System Sit Across US Utility Rates?

Positions Lincoln Electric System (11.15 c/kWh) across 1,989 US electric utility residential tariffs. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does Lincoln Electric System Rank Across Cost & Reliability?

Percentile placement of Lincoln Electric System across retail kWh electricity cost and IEEE grid reliability outage metrics. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## What Do EIA-861 Benchmarks Show for Lincoln Electric System?

Four key EIA-861 rate, outage, and solar payback benchmarks for Lincoln Electric System (Municipal) in Nebraska. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #264 / 1,989

### 11.15 c/kWh (-0.90 vs NE)

Commercial avg: 8.93 c/kWh; Industrial: 7.73 c/kWh; est. residential bill $93.59/mo.

Reliability #479 / 751

### 240.5 min/yr (4.01 hrs)

92.3% (222.1 min) from Major Event Days; avg restore 325.0 min (~9.8 kWh @ 1.8 kW).

Post-25D Payback

### 19.6 Years @ 11.15 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,204/yr at 1,350 kWh/kW.

Distributed PV

### 604 Net-Metered Systems

3.658 MW residential PV (0.44% of customers) across 1 county; state FEMA declarations (2015-2026): 29.

Lincoln Electric System Reliability & Solar Offset Calculation

Backup_Energy = (325.0 min / 60) * 1.8 kW = 9.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1115 = $1,204/yr

EIA-861 2025 Utility ID 11018: Rate=11.15 c/kWh, Cust=136,859, SAIDI=240.5 min, PV=604.

**Result:** 4.01 outage hrs/yr; 19.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Lincoln Electric System?

Complete Form EIA-861 filing summary for Lincoln Electric System (ID 11018) covering sales, PV, and counties. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for Lincoln Electric System (Utility ID 11018).

| EIA Utility ID & BA Code | ID 11018 · SWPP |
|---|---|
| State & Ownership Type | NE · Municipal |
| Retail Electricity Rates | 11.15 c/kWh Res · 8.93 c Comm · 7.73 c Ind |
| Avg Monthly Usage & Bill | 839.2 kWh/mo ($93.59/mo est.) |
| SAIDI (All Events w/ MED) | 240.5 min/yr (4.01 hrs/yr) |
| SAIDI (Without Major Events) | 18.4 min/yr (Storm share: 92.3%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.74 /yr · 325.0 min restore |
| Residential Net-Metered PV | 604 systems (3.658 MW) |
| Counties Served (Sample) | 1 county (Lancaster) |

## Which Peer Electric Utilities Operate in NE?

Compare Lincoln Electric System directly with Nebraska Public Power District and nearby Nebraska electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Nebraska Public Power District**](https://epri-peac.com/utilities/ne-nebraska-public-power-district-13337/) | 10.95 c | 195.4 min | 235 | 74,220 |
| [**City of Grand Island - (NE)**](https://epri-peac.com/utilities/ne-city-of-grand-island-ne-40606/) | 10.32 c | 37.1 min | 12 | 22,563 |
| [**Norris Public Power District**](https://epri-peac.com/utilities/ne-norris-public-power-district-13664/) | 9.54 c | 2,541.4 min | 172 | 19,395 |
| [**Loup River Public Power Dist**](https://epri-peac.com/utilities/ne-loup-river-public-power-dist-11251/) | 10.82 c | — | 0 | 16,449 |

What to Check & Best-Fit Scenarios

## What Should Lincoln Electric System Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Lincoln Electric System (Municipal, NE) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Lincoln Electric System (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in NE.
- Export credit rules: check Lincoln Electric System's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Lincoln Electric System Solar & Battery Evaluators

Compare your actual Lincoln Electric System monthly kWh statement against 11.15 c/kWh and verify current export tariffs in NE.

### Lincoln Electric System Outage & Generator Planners

Use Lincoln Electric System's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Lincoln Electric System (Nebraska) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

### What is Lincoln Electric System's residential electricity rate and 2026 solar payback?

Lincoln Electric System averages 11.15 c/kWh (-0.90 c/kWh vs Nebraska average vs. Nebraska). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,204/yr (19.6-year payback).

### How reliable is Lincoln Electric System compared to peer Nebraska utilities?

Lincoln Electric System logged 240.5 SAIDI outage minutes (4.01 hrs/yr, 92.3% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Nebraska Public Power District (10.95 c/kWh) across Nebraska.

### Which counties and customers does Lincoln Electric System serve in Nebraska?

EIA-861 filings list 136,859 customers across 1 county including Lancaster, with 604 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Lincoln Electric System.

## Related Pages

Explore Nebraska energy benchmarks, Nebraska Public Power District, county outage profiles, and NEC 705.12 tools alongside Lincoln Electric System.

[Nebraska State Energy Rates & Utilities](https://epri-peac.com/states/nebraska/) [All Nebraska County Power & Outage Profiles](https://epri-peac.com/counties/nebraska/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.15 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)