title: "Elkhorn Rural Public Pwr Dist (NE) Rate & SAIDI"
url: https://epri-peac.com/utilities/ne-elkhorn-rural-public-pwr-dist-5780/
description: "2025 EIA-861 profile for Elkhorn Rural Public Pwr Dist (NE): 9.29 c/kWh rate, SAIDI Not reported in EIA-861, 12 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# Elkhorn Rural Public Pwr Dist (NE) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Elkhorn Rural Public Pwr Dist (EIA ID 5780, NE) serves 6,178 customers at 9.29 c/kWh (-2.76 c/kWh vs Nebraska average) with no standalone IEEE SAIDI filing (8 counties served) with 12 net-metered residential solar systems (0.19% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 5780

- **Res. Rate** : 9.29 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 12 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Elkhorn Rural Public Pwr Dist Compare on Tariffs and Reliability?

How Elkhorn Rural Public Pwr Dist (Political Subdivision) performs across 8 counties on kWh rates and outage resilience.

Across 8 counties including Antelope, Boone, Holt, Elkhorn Rural Public Pwr Dist offers a low 9.29 c/kWh residential rate (-9.25 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 23.5 years without federal 25D compared to peer Cedar-Knox Public Power Dist (9.01 c/kWh). With 6,178 customer accounts (Political Subdivision), 2025 Form EIA-861 shows Elkhorn Rural Public Pwr Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 542.8 min/yr), with 12 net-metered residential solar systems (0.19% customer adoption).

## Where Does Elkhorn Rural Public Pwr Dist Sit Across US Utility Rates?

National utility tariff curve marking Elkhorn Rural Public Pwr Dist at 9.29 c/kWh vs. 18.54 c/kWh US mean.

## How Does Elkhorn Rural Public Pwr Dist Rank Across Cost & Reliability?

Relative ranking of Elkhorn Rural Public Pwr Dist on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Elkhorn Rural Public Pwr Dist?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Elkhorn Rural Public Pwr Dist in Nebraska.

Lowest Rate #84 / 1,989

### 9.29 c/kWh (-2.76 vs NE)

Commercial avg: 9.45 c/kWh; Industrial: 9.15 c/kWh; est. residential bill $138.06/mo.

State Reliability Context

### 542.8 min/yr (NE Avg)

Utility did not file separate IEEE SAIDI in 2025; Nebraska customer-weighted SAIDI is 542.8 min/yr.

Post-25D Payback

### 23.5 Years @ 9.29 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,003/yr at 1,350 kWh/kW.

Distributed PV

### 12 Net-Metered Systems

0.205 MW residential PV (0.19% of customers) across 8 counties; state FEMA declarations (2015-2026): 29.

Elkhorn Rural Public Pwr Dist Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0929 = $1,003/yr

EIA-861 2025 Utility ID 5780: Rate=9.29 c/kWh, Cust=6,178, PV=12.

**Result:** 23.5 yr 8 kW cash payback at 9.29 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Elkhorn Rural Public Pwr Dist?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Elkhorn Rural Public Pwr Dist. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Elkhorn Rural Public Pwr Dist (Utility ID 5780).

| EIA Utility ID & BA Code | ID 5780 · SWPP |
|---|---|
| State & Ownership Type | NE · Political Subdivision |
| Retail Electricity Rates | 9.29 c/kWh Res · 9.45 c Comm · 9.15 c Ind |
| Avg Monthly Usage & Bill | 1,485.9 kWh/mo ($138.06/mo est.) |
| Residential Net-Metered PV | 12 systems (0.205 MW) |
| Counties Served (Sample) | 8 counties (Antelope, Boone, Holt, Madison, Pierce, Platte, Stanton, Wheeler) |

## Which Peer Electric Utilities Operate in NE?

Nearby Nebraska electric utilities of comparable customer size led by Cedar-Knox Public Power Dist (9.01 c/kWh). Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Cedar-Knox Public Power Dist**](https://epri-peac.com/utilities/ne-cedar-knox-public-power-dist-3205/) | 9.01 c | — | 5 | 6,017 |
| [**Northeast Power**](https://epri-peac.com/utilities/ne-northeast-power-13739/) | 9.56 c | — | 16 | 6,860 |
| [**City of South Sioux City**](https://epri-peac.com/utilities/ne-city-of-south-sioux-city-17577/) | 12.91 c | — | 0 | 5,111 |
| [**Cornhusker Public Power Dist**](https://epri-peac.com/utilities/ne-cornhusker-public-power-dist-4373/) | 11.02 c | — | 38 | 7,406 |

What to Check & Best-Fit Scenarios

## What Should Elkhorn Rural Public Pwr Dist Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Elkhorn Rural Public Pwr Dist (Political Subdivision, NE) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Elkhorn Rural Public Pwr Dist (NE) shift real bills away from 9.29 c/kWh.
- Outage clustering: Major Event Days skew Elkhorn Rural Public Pwr Dist annual minutes differently than routine non-storm reliability.

### Elkhorn Rural Public Pwr Dist Solar & Battery Evaluators

Compare your actual Elkhorn Rural Public Pwr Dist monthly kWh statement against 9.29 c/kWh and verify current export tariffs in NE.

### Elkhorn Rural Public Pwr Dist Outage & Generator Planners

Use Elkhorn Rural Public Pwr Dist's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Elkhorn Rural Public Pwr Dist (Nebraska) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Elkhorn Rural Public Pwr Dist's residential electricity rate and 2026 solar payback?

Elkhorn Rural Public Pwr Dist averages 9.29 c/kWh (-2.76 c/kWh vs Nebraska average vs. Nebraska). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,003/yr (23.5-year payback).

### How reliable is Elkhorn Rural Public Pwr Dist compared to peer Nebraska utilities?

Elkhorn Rural Public Pwr Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 542.8 min/yr); compare rates and outage history directly with Cedar-Knox Public Power Dist (9.01 c/kWh) across Nebraska.

### Which counties and customers does Elkhorn Rural Public Pwr Dist serve in Nebraska?

EIA-861 filings list 6,178 customers across 8 counties including Antelope, Boone, Holt, with 12 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Elkhorn Rural Public Pwr Dist.

## Related Pages

Explore Nebraska energy benchmarks, Cedar-Knox Public Power Dist, county outage profiles, and NEC 705.12 tools alongside Elkhorn Rural Public Pwr Dist.

[Nebraska State Energy Rates & Utilities](https://epri-peac.com/states/nebraska/) [All Nebraska County Power & Outage Profiles](https://epri-peac.com/counties/nebraska/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.29 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)