description: "2025 EIA-861 profile for Cornhusker Public Power Dist (NE): 11.02 c/kWh rate, SAIDI Not reported in EIA-861, 38 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# Cornhusker Public Power Dist (NE) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Cornhusker Public Power Dist (EIA ID 4373, NE) serves 7,406 customers at 11.02 c/kWh (-1.03 c/kWh vs Nebraska average) with no standalone IEEE SAIDI filing (6 counties served) with 38 net-metered residential solar systems (0.51% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4373

- **Res. Rate** : 11.02 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 38 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Cornhusker Public Power Dist Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.03 c/kWh vs Nebraska average), customer scale (7,406), and 2026 solar payback benchmarks for Cornhusker Public Power Dist.

Ranked #238 of 1,989 reporting US utilities for residential rate (top 12.1%; lower than 87.9% of peers), Cornhusker Public Power Dist serves 7,406 accounts in Nebraska (Political Subdivision). Commercial power averages 8.7 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 542.8 min/yr), with 38 net-metered residential solar systems (0.51% customer adoption).

## Where Does Cornhusker Public Power Dist Sit Across US Utility Rates?

Positions Cornhusker Public Power Dist (11.02 c/kWh) across 1,989 US electric utility residential tariffs. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## How Does Cornhusker Public Power Dist Rank Across Cost & Reliability?

Percentile placement of Cornhusker Public Power Dist across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Cornhusker Public Power Dist?

Four key EIA-861 rate, outage, and solar payback benchmarks for Cornhusker Public Power Dist (Political Subdivision) in Nebraska.

Lowest Rate #238 / 1,989

### 11.02 c/kWh (-1.03 vs NE)

Commercial avg: 8.7 c/kWh; Industrial: 9.14 c/kWh; est. residential bill $164.50/mo.

State Reliability Context

### 542.8 min/yr (NE Avg)

Utility did not file separate IEEE SAIDI in 2025; Nebraska customer-weighted SAIDI is 542.8 min/yr.

Post-25D Payback

### 19.8 Years @ 11.02 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,190/yr at 1,350 kWh/kW.

Distributed PV

### 38 Net-Metered Systems

0.837 MW residential PV (0.51% of customers) across 6 counties; state FEMA declarations (2015-2026): 29.

Cornhusker Public Power Dist Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1102 = $1,190/yr

EIA-861 2025 Utility ID 4373: Rate=11.02 c/kWh, Cust=7,406, PV=38.

**Result:** 19.8 yr 8 kW cash payback at 11.02 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Cornhusker Public Power Dist?

Complete Form EIA-861 filing summary for Cornhusker Public Power Dist (ID 4373) covering sales, PV, and counties. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for Cornhusker Public Power Dist (Utility ID 4373).

| EIA Utility ID & BA Code | ID 4373 · SWPP |
|---|---|
| State & Ownership Type | NE · Political Subdivision |
| Retail Electricity Rates | 11.02 c/kWh Res · 8.7 c Comm · 9.14 c Ind |
| Avg Monthly Usage & Bill | 1,493.4 kWh/mo ($164.50/mo est.) |
| Residential Net-Metered PV | 38 systems (0.837 MW) |
| Counties Served (Sample) | 6 counties (Boone, Colfax, Greeley, Nance, Platte, Wheeler) |

## Which Peer Electric Utilities Operate in NE?

Compare Cornhusker Public Power Dist directly with Northeast Power and nearby Nebraska electric utilities by customer base. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Northeast Power**](https://epri-peac.com/utilities/ne-northeast-power-13739/) | 9.56 c | — | 16 | 6,860 |
| [**Elkhorn Rural Public Pwr Dist**](https://epri-peac.com/utilities/ne-elkhorn-rural-public-pwr-dist-5780/) | 9.29 c | — | 12 | 6,178 |
| [**Cedar-Knox Public Power Dist**](https://epri-peac.com/utilities/ne-cedar-knox-public-power-dist-3205/) | 9.01 c | — | 5 | 6,017 |
| [**City of South Sioux City**](https://epri-peac.com/utilities/ne-city-of-south-sioux-city-17577/) | 12.91 c | — | 0 | 5,111 |

What to Check & Best-Fit Scenarios

## What Should Cornhusker Public Power Dist Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Cornhusker Public Power Dist (Political Subdivision, NE) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Cornhusker Public Power Dist (Political Subdivision) reports historical 2025 EIA-861 averages rather than live rate-case riders in NE.
- Export credit rules: check Cornhusker Public Power Dist's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Cornhusker Public Power Dist Solar & Battery Evaluators

Compare your actual Cornhusker Public Power Dist monthly kWh statement against 11.02 c/kWh and verify current export tariffs in NE.

### Cornhusker Public Power Dist Outage & Generator Planners

Use Cornhusker Public Power Dist's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Cornhusker Public Power Dist (Nebraska) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Cornhusker Public Power Dist's residential electricity rate and 2026 solar payback?

Cornhusker Public Power Dist averages 11.02 c/kWh (-1.03 c/kWh vs Nebraska average vs. Nebraska). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,190/yr (19.8-year payback).

### How reliable is Cornhusker Public Power Dist compared to peer Nebraska utilities?

Cornhusker Public Power Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 542.8 min/yr); compare rates and outage history directly with Northeast Power (9.56 c/kWh) across Nebraska.

### Which counties and customers does Cornhusker Public Power Dist serve in Nebraska?

EIA-861 filings list 7,406 customers across 6 counties including Boone, Colfax, Greeley, with 38 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Cornhusker Public Power Dist.

## Related Pages

Explore Nebraska energy benchmarks, Northeast Power, county outage profiles, and NEC 705.12 tools alongside Cornhusker Public Power Dist.

[Nebraska State Energy Rates & Utilities](https://epri-peac.com/states/nebraska/) [All Nebraska County Power & Outage Profiles](https://epri-peac.com/counties/nebraska/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.02 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)