Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Hastings - (NE) (EIA ID 8245, NE) serves 11,655 customers at 11.83 c/kWh (-0.22 c/kWh vs Nebraska average) with 49.9 min/yr SAIDI (0.83 hrs/yr) with 15 net-metered residential solar systems (0.13% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 8245

- **Res. Rate** : 11.83 c/kWh

- **SAIDI (All Events)** : 49.9 min/yr

- **Net-Metered PV** : 15 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Hastings - (NE) Compare on Tariffs and Reliability?

How City of Hastings - (NE) (Municipal) performs across 2 counties on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

City of Hastings - (NE) (Municipal) recorded 49.9 SAIDI outage minutes (0.83 hrs/yr, rank #114 of 751 reporting utilities). Typical residential meters drew 813.5 kWh/mo ($96.21/mo) in 2025, while its tariff offers a low 11.83 c/kWh residential rate (-6.71 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 18.5 years without federal 25D—compare rates directly with City of North Platte (11.68 c/kWh).

## Where Does City of Hastings - (NE) Sit Across US Utility Rates?

National utility tariff curve marking City of Hastings - (NE) at 11.83 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Hastings - (NE) Rank Across Cost & Reliability?

Relative ranking of City of Hastings - (NE) on residential electricity pricing and annual IEEE SAIDI outage duration. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## What Do EIA-861 Benchmarks Show for City of Hastings - (NE)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Hastings - (NE) in Nebraska.

Lowest Rate #366 / 1,989

### 11.83 c/kWh (-0.22 vs NE)

Commercial avg: 10.81 c/kWh; Industrial: 7.65 c/kWh; est. residential bill $96.21/mo.

Reliability #114 / 751

### 49.9 min/yr (0.83 hrs)

85.8% (42.8 min) from Major Event Days; avg restore 164.0 min (~4.9 kWh @ 1.8 kW).

Post-25D Payback

### 18.5 Years @ 11.83 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,278/yr at 1,350 kWh/kW.

Distributed PV

### 15 Net-Metered Systems

0.115 MW residential PV (0.13% of customers) across 2 counties; state FEMA declarations (2015-2026): 29.

City of Hastings - (NE) Reliability & Solar Offset Calculation

Backup_Energy = (164.0 min / 60) * 1.8 kW = 4.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1183 = $1,278/yr

EIA-861 2025 Utility ID 8245: Rate=11.83 c/kWh, Cust=11,655, SAIDI=49.9 min, PV=15.

**Result:** 0.83 outage hrs/yr; 18.5 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Hastings - (NE)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Hastings - (NE). Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Hastings - (NE) (Utility ID 8245).

| EIA Utility ID & BA Code | ID 8245 · SWPP |
|---|---|
| State & Ownership Type | NE · Municipal |
| Retail Electricity Rates | 11.83 c/kWh Res · 10.81 c Comm · 7.65 c Ind |
| Avg Monthly Usage & Bill | 813.5 kWh/mo ($96.21/mo est.) |
| SAIDI (All Events w/ MED) | 49.9 min/yr (0.83 hrs/yr) |
| SAIDI (Without Major Events) | 7.1 min/yr (Storm share: 85.8%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.304 /yr · 164.0 min restore |
| Residential Net-Metered PV | 15 systems (0.115 MW) |
| Counties Served (Sample) | 2 counties (Adams, Clay) |

## Which Peer Electric Utilities Operate in NE?

Nearby Nebraska electric utilities of comparable customer size led by City of North Platte (11.68 c/kWh). Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of North Platte**](https://epri-peac.com/utilities/ne-city-of-north-platte-13725/) | 11.68 c | — | 13 | 12,062 |
| [**City of Fremont - (NE)**](https://epri-peac.com/utilities/ne-city-of-fremont-ne-6779/) | 12.27 c | 3,080.8 min | 11 | 14,170 |
| [**Southern Public Power District**](https://epri-peac.com/utilities/ne-southern-public-power-district-17642/) | 9.1 c | — | 46 | 15,389 |
| [**Cornhusker Public Power Dist**](https://epri-peac.com/utilities/ne-cornhusker-public-power-dist-4373/) | 11.02 c | — | 38 | 7,406 |

What to Check & Best-Fit Scenarios

## What Should City of Hastings - (NE) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Hastings - (NE) (Municipal, NE) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Hastings - (NE) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in NE.
- Export credit rules: check City of Hastings - (NE)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Hastings - (NE) Solar & Battery Evaluators

Compare your actual City of Hastings - (NE) monthly kWh statement against 11.83 c/kWh and verify current export tariffs in NE.

### City of Hastings - (NE) Outage & Generator Planners

Use City of Hastings - (NE)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Hastings - (NE) (Nebraska) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Hastings - (NE)'s residential electricity rate and 2026 solar payback?

City of Hastings - (NE) averages 11.83 c/kWh (-0.22 c/kWh vs Nebraska average vs. Nebraska). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,278/yr (18.5-year payback).

### How reliable is City of Hastings - (NE) compared to peer Nebraska utilities?

City of Hastings - (NE) recorded 49.9 SAIDI outage minutes (0.83 hrs/yr, rank #114 of 751 reporting utilities); compare rates and outage history directly with City of North Platte (11.68 c/kWh) across Nebraska.

### Which counties and customers does City of Hastings - (NE) serve in Nebraska?

EIA-861 filings list 11,655 customers across 2 counties including Adams, Clay, with 15 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Hastings - (NE).

## Related Pages

Explore Nebraska energy benchmarks, City of North Platte, county outage profiles, and NEC 705.12 tools alongside City of Hastings - (NE).

[Nebraska State Energy Rates & Utilities](https://epri-peac.com/states/nebraska/) [All Nebraska County Power & Outage Profiles](https://epri-peac.com/counties/nebraska/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.83 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)