---
title: "City of Fremont - (NE) (NE) Rate & SAIDI"
url: https://epri-peac.com/utilities/ne-city-of-fremont-ne-6779/
description: "2025 EIA-861 profile for City of Fremont - (NE) (NE): 12.27 c/kWh rate, SAIDI 3,080.8 min/yr, 11 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Fremont - (NE) (NE) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Fremont - (NE) (EIA ID 6779, NE) serves 14,170 customers at 12.27 c/kWh (+0.22 c/kWh vs Nebraska average) with 3,080.8 min/yr SAIDI (51.35 hrs/yr) with 11 net-metered residential solar systems (0.08% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6779

- **Res. Rate** : 12.27 c/kWh

- **SAIDI (All Events)** : 3,080.8 min/yr

- **Net-Metered PV** : 11 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Fremont - (NE) Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.27 c/kWh), and outage history inside City of Fremont - (NE) territory. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Evaluating solar or generator backup under City of Fremont - (NE) (Nebraska) starts with its 12.27 c/kWh residential baseline (+0.22 c/kWh vs Nebraska average) and 17.8-year 8 kW cash payback. EIA-861 records show City of Fremont - (NE) logged 3,080.8 SAIDI outage minutes (51.35 hrs/yr, 99.4% storm-driven), making battery backup or a standby ATS worthwhile across 14,170 accounts.

## Where Does City of Fremont - (NE) Sit Across US Utility Rates?

Benchmarking City of Fremont - (NE)'s 12.27 c/kWh residential rate against 1,989 EIA-861 utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does City of Fremont - (NE) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Fremont - (NE) across Nebraska utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for City of Fremont - (NE)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Fremont - (NE) in 2025.

Lowest Rate #452 / 1,989

### 12.27 c/kWh (+0.22 vs NE)

Commercial avg: 11.24 c/kWh; Industrial: 9.77 c/kWh; est. residential bill $108.57/mo.

Reliability #749 / 751

### 3,080.8 min/yr (51.35 hrs)

99.4% (3,062.4 min) from Major Event Days; avg restore 1,711.5 min (~51.3 kWh @ 1.8 kW).

Post-25D Payback

### 17.8 Years @ 12.27 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,325/yr at 1,350 kWh/kW.

Distributed PV

### 11 Net-Metered Systems

0.061 MW residential PV (0.08% of customers) across 1 county; state FEMA declarations (2015-2026): 29.

City of Fremont - (NE) Reliability & Solar Offset Calculation

Backup_Energy = (1711.5 min / 60) * 1.8 kW = 51.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1227 = $1,325/yr

EIA-861 2025 Utility ID 6779: Rate=12.27 c/kWh, Cust=14,170, SAIDI=3,080.8 min, PV=11.

**Result:** 51.35 outage hrs/yr; 17.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Fremont - (NE)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 6779. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Fremont - (NE) (Utility ID 6779).

| EIA Utility ID & BA Code | ID 6779 · SWPP |
|---|---|
| State & Ownership Type | NE · Municipal |
| Retail Electricity Rates | 12.27 c/kWh Res · 11.24 c Comm · 9.77 c Ind |
| Avg Monthly Usage & Bill | 885.1 kWh/mo ($108.57/mo est.) |
| SAIDI (All Events w/ MED) | 3,080.8 min/yr (51.35 hrs/yr) |
| SAIDI (Without Major Events) | 18.4 min/yr (Storm share: 99.4%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.8 /yr · 1,711.5 min restore |
| Residential Net-Metered PV | 11 systems (0.061 MW) |
| Counties Served (Sample) | 1 county (Dodge) |

## Which Peer Electric Utilities Operate in NE?

Benchmark City of Fremont - (NE) directly against Southern Public Power District and peer Nebraska retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Southern Public Power District**](https://epri-peac.com/utilities/ne-southern-public-power-district-17642/) | 9.1 c | — | 46 | 15,389 |
| [**Dawson Power District**](https://epri-peac.com/utilities/ne-dawson-power-district-4911/) | 11.32 c | — | 61 | 16,116 |
| [**City of North Platte**](https://epri-peac.com/utilities/ne-city-of-north-platte-13725/) | 11.68 c | — | 13 | 12,062 |
| [**Loup River Public Power Dist**](https://epri-peac.com/utilities/ne-loup-river-public-power-dist-11251/) | 10.82 c | — | 0 | 16,449 |

What to Check & Best-Fit Scenarios

## What Should City of Fremont - (NE) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Fremont - (NE) (Municipal, NE) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Fremont - (NE) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in NE.
- Export credit rules: check City of Fremont - (NE)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Fremont - (NE) Solar & Battery Evaluators

Compare your actual City of Fremont - (NE) monthly kWh statement against 12.27 c/kWh and verify current export tariffs in NE.

### City of Fremont - (NE) Outage & Generator Planners

Use City of Fremont - (NE)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Fremont - (NE) (Nebraska) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Fremont - (NE)'s residential electricity rate and 2026 solar payback?

City of Fremont - (NE) averages 12.27 c/kWh (+0.22 c/kWh vs Nebraska average vs. Nebraska). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,325/yr (17.8-year payback).

### How reliable is City of Fremont - (NE) compared to peer Nebraska utilities?

City of Fremont - (NE) logged 3,080.8 SAIDI outage minutes (51.35 hrs/yr, 99.4% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Southern Public Power District (9.1 c/kWh) across Nebraska.

### Which counties and customers does City of Fremont - (NE) serve in Nebraska?

EIA-861 filings list 14,170 customers across 1 county including Dodge, with 11 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Fremont - (NE).

## Related Pages

Explore Nebraska energy benchmarks, Southern Public Power District, county outage profiles, and NEC 705.12 tools alongside City of Fremont - (NE).

[Nebraska State Energy Rates & Utilities](https://epri-peac.com/states/nebraska/) [All Nebraska County Power & Outage Profiles](https://epri-peac.com/counties/nebraska/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.27 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
