---
title: "Town of Huntersville - (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-town-of-huntersville-nc-9087/
description: "2025 EIA-861 profile for Town of Huntersville - (NC) (NC): 12.57 c/kWh rate, SAIDI 23.8 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Town of Huntersville - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Town of Huntersville - (NC) (EIA ID 9087, NC) serves 8,617 customers at 12.57 c/kWh (-1.43 c/kWh vs North Carolina average) with 23.8 min/yr SAIDI (0.4 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 9087

- **Res. Rate** : 12.57 c/kWh

- **SAIDI (All Events)** : 23.8 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Town of Huntersville - (NC) Compare on Tariffs and Reliability?

How Town of Huntersville - (NC) (Municipal) performs across 1 county on kWh rates and outage resilience. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Town of Huntersville - (NC) (Municipal) recorded 23.8 SAIDI outage minutes (0.4 hrs/yr, rank #48 of 751 reporting utilities). Typical residential meters drew 893.7 kWh/mo ($112.33/mo) in 2025, while its tariff offers a low 12.57 c/kWh residential rate (-5.97 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.4 years without federal 25D—compare rates directly with New River Light & Power Co (12.06 c/kWh).

## Where Does Town of Huntersville - (NC) Sit Across US Utility Rates?

National utility tariff curve marking Town of Huntersville - (NC) at 12.57 c/kWh vs. 18.54 c/kWh US mean.

## How Does Town of Huntersville - (NC) Rank Across Cost & Reliability?

Relative ranking of Town of Huntersville - (NC) on residential electricity pricing and annual IEEE SAIDI outage duration. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## What Do EIA-861 Benchmarks Show for Town of Huntersville - (NC)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Town of Huntersville - (NC) in North Carolina.

Lowest Rate #537 / 1,989

### 12.57 c/kWh (-1.43 vs NC)

Commercial avg: 10.46 c/kWh; Industrial: 6.29 c/kWh; est. residential bill $112.33/mo.

Reliability #48 / 751

### 23.8 min/yr (0.4 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 108.1 min (~3.2 kWh @ 1.8 kW).

Post-25D Payback

### 17.4 Years @ 12.57 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,358/yr at 1,350 kWh/kW.

Service Territory

### 8,617 Customers · 1 County

Serves 1 county including Mecklenburg in North Carolina; state FEMA declarations (2015-2026): 29.

Town of Huntersville - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (108.1 min / 60) * 1.8 kW = 3.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1257 = $1,358/yr

EIA-861 2025 Utility ID 9087: Rate=12.57 c/kWh, Cust=8,617, SAIDI=23.8 min.

**Result:** 0.4 outage hrs/yr; 17.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Town of Huntersville - (NC)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Town of Huntersville - (NC). Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Town of Huntersville - (NC) (Utility ID 9087).

| EIA Utility ID & BA Code | ID 9087 · DUK |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 12.57 c/kWh Res · 10.46 c Comm · 6.29 c Ind |
| Avg Monthly Usage & Bill | 893.7 kWh/mo ($112.33/mo est.) |
| SAIDI (All Events w/ MED) | 23.8 min/yr (0.4 hrs/yr) |
| SAIDI (Without Major Events) | 23.8 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.22 /yr · 108.1 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Mecklenburg) |

## Which Peer Electric Utilities Operate in NC?

Nearby North Carolina electric utilities of comparable customer size led by New River Light & Power Co (12.06 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**New River Light & Power Co**](https://epri-peac.com/utilities/nc-new-river-light-power-co-13482/) | 12.06 c | 109.9 min | 14 | 7,318 |
| [**City of Lumberton - (NC)**](https://epri-peac.com/utilities/nc-city-of-lumberton-nc-11318/) | 13.86 c | — | 0 | 9,938 |
| [**City of Kinston - (NC)**](https://epri-peac.com/utilities/nc-city-of-kinston-nc-10345/) | 12.96 c | 63.8 min | 0 | 10,040 |
| [**City of Morganton - (NC)**](https://epri-peac.com/utilities/nc-city-of-morganton-nc-12944/) | 11.59 c | — | 0 | 7,066 |

What to Check & Best-Fit Scenarios

## What Should Town of Huntersville - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Town of Huntersville - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Town of Huntersville - (NC) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in NC.
- Export credit rules: check Town of Huntersville - (NC)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Town of Huntersville - (NC) Solar & Battery Evaluators

Compare your actual Town of Huntersville - (NC) monthly kWh statement against 12.57 c/kWh and verify current export tariffs in NC.

### Town of Huntersville - (NC) Outage & Generator Planners

Use Town of Huntersville - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Town of Huntersville - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Town of Huntersville - (NC)'s residential electricity rate and 2026 solar payback?

Town of Huntersville - (NC) averages 12.57 c/kWh (-1.43 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,358/yr (17.4-year payback).

### How reliable is Town of Huntersville - (NC) compared to peer North Carolina utilities?

Town of Huntersville - (NC) recorded 23.8 SAIDI outage minutes (0.4 hrs/yr, rank #48 of 751 reporting utilities); compare rates and outage history directly with New River Light & Power Co (12.06 c/kWh) across North Carolina.

### Which counties and customers does Town of Huntersville - (NC) serve in North Carolina?

EIA-861 filings list 8,617 customers across 1 county including Mecklenburg, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Town of Huntersville - (NC).

## Related Pages

Explore North Carolina energy benchmarks, New River Light & Power Co, county outage profiles, and NEC 705.12 tools alongside Town of Huntersville - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.57 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
