title: "Town of Apex- (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-town-of-apex-nc-719/
description: "2025 EIA-861 profile for Town of Apex- (NC) (NC): 16.72 c/kWh rate, SAIDI 44.5 min/yr, 1,091 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Town of Apex- (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Town of Apex- (NC) (EIA ID 719, NC) serves 29,754 customers at 16.72 c/kWh (+2.72 c/kWh vs North Carolina average) with 44.5 min/yr SAIDI (0.74 hrs/yr) with 1,091 net-metered residential solar systems (3.67% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 719

- **Res. Rate** : 16.72 c/kWh

- **SAIDI (All Events)** : 44.5 min/yr

- **Net-Metered PV** : 1,091 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Town of Apex- (NC) Compare on Tariffs and Reliability?

How Town of Apex- (NC) (Municipal) performs across 1 county on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Town of Apex- (NC) (Municipal) recorded 44.5 SAIDI outage minutes (0.74 hrs/yr, rank #98 of 751 reporting utilities). Typical residential meters drew 761.9 kWh/mo ($127.38/mo) in 2025, while its tariff bills residential power at 16.72 c/kWh (+2.72 c/kWh vs North Carolina average vs. North Carolina), offsetting ~$1,806/yr on an 8 kW array—compare rates directly with City of Concord - (NC) (11.57 c/kWh).

## Where Does Town of Apex- (NC) Sit Across US Utility Rates?

National utility tariff curve marking Town of Apex- (NC) at 16.72 c/kWh vs. 18.54 c/kWh US mean.

## How Does Town of Apex- (NC) Rank Across Cost & Reliability?

Relative ranking of Town of Apex- (NC) on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for Town of Apex- (NC)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Town of Apex- (NC) in North Carolina.

Lowest Rate #1,511 / 1,989

### 16.72 c/kWh (+2.72 vs NC)

Commercial avg: 10.28 c/kWh; est. residential bill $127.38/mo.

Reliability #98 / 751

### 44.5 min/yr (0.74 hrs)

74.2% (33.0 min) from Major Event Days; avg restore 148.5 min (~4.5 kWh @ 1.8 kW).

Post-25D Payback

### 13.1 Years @ 16.72 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,806/yr at 1,350 kWh/kW.

Distributed PV

### 1,091 Net-Metered Systems

8.72 MW residential PV (3.67% of customers) across 1 county; state FEMA declarations (2015-2026): 29.

Town of Apex- (NC) Reliability & Solar Offset Calculation

Backup_Energy = (148.5 min / 60) * 1.8 kW = 4.5 kWh/event | Solar_Offset = 10,800 kWh * $0.1672 = $1,806/yr

EIA-861 2025 Utility ID 719: Rate=16.72 c/kWh, Cust=29,754, SAIDI=44.5 min, PV=1,091.

**Result:** 0.74 outage hrs/yr; 13.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Town of Apex- (NC)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Town of Apex- (NC). Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for Town of Apex- (NC) (Utility ID 719).

| EIA Utility ID & BA Code | ID 719 · CPLE |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 16.72 c/kWh Res · 10.28 c Comm |
| Avg Monthly Usage & Bill | 761.9 kWh/mo ($127.38/mo est.) |
| SAIDI (All Events w/ MED) | 44.5 min/yr (0.74 hrs/yr) |
| SAIDI (Without Major Events) | 11.5 min/yr (Storm share: 74.2%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.3 /yr · 148.5 min restore |
| Residential Net-Metered PV | 1,091 systems (8.72 MW) |
| Counties Served (Sample) | 1 county (Wake) |

## Which Peer Electric Utilities Operate in NC?

Nearby North Carolina electric utilities of comparable customer size led by City of Concord - (NC) (11.57 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Concord - (NC)**](https://epri-peac.com/utilities/nc-city-of-concord-nc-4150/) | 11.57 c | 65.3 min | 0 | 30,029 |
| [**Haywood Electric Member Corp**](https://epri-peac.com/utilities/nc-haywood-electric-member-corp-8333/) | 16.86 c | 776.3 min | 211 | 30,307 |
| [**Piedmont Electric Member Corp**](https://epri-peac.com/utilities/nc-piedmont-electric-member-corp-15023/) | 15.63 c | 502.7 min | 511 | 30,640 |
| [**Surry-Yadkin Elec Member Corp**](https://epri-peac.com/utilities/nc-surry-yadkin-elec-member-corp-18339/) | 17.53 c | 249.3 min | 0 | 28,296 |

What to Check & Best-Fit Scenarios

## What Should Town of Apex- (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Town of Apex- (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Town of Apex- (NC) acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: Town of Apex- (NC) interconnection engineering still checks neighborhood transformer kVA regardless of 44.5 SAIDI.

### Town of Apex- (NC) Solar & Battery Evaluators

Compare your actual Town of Apex- (NC) monthly kWh statement against 16.72 c/kWh and verify current export tariffs in NC.

### Town of Apex- (NC) Outage & Generator Planners

Use Town of Apex- (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Town of Apex- (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Town of Apex- (NC)'s residential electricity rate and 2026 solar payback?

Town of Apex- (NC) averages 16.72 c/kWh (+2.72 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,806/yr (13.1-year payback).

### How reliable is Town of Apex- (NC) compared to peer North Carolina utilities?

Town of Apex- (NC) recorded 44.5 SAIDI outage minutes (0.74 hrs/yr, rank #98 of 751 reporting utilities); compare rates and outage history directly with City of Concord - (NC) (11.57 c/kWh) across North Carolina.

### Which counties and customers does Town of Apex- (NC) serve in North Carolina?

EIA-861 filings list 29,754 customers across 1 county including Wake, with 1,091 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Town of Apex- (NC).

## Related Pages

Explore North Carolina energy benchmarks, City of Concord - (NC), county outage profiles, and NEC 705.12 tools alongside Town of Apex- (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.72 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)