---
title: "Mecklenburg Electric (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-mecklenburg-electric-cooperative-12260/
description: "2025 EIA-861 profile for Mecklenburg Electric Cooperative (NC): 13.9 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Mecklenburg Electric Cooperative (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Mecklenburg Electric Cooperative (EIA ID 12260, NC) serves 138 customers at 13.9 c/kWh (-0.10 c/kWh vs North Carolina average) with no standalone IEEE SAIDI filing (5 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 12260

- **Res. Rate** : 13.9 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Mecklenburg Electric Cooperative Compare on Tariffs and Reliability?

How Mecklenburg Electric Cooperative (Cooperative) performs across 5 counties on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Mecklenburg Electric Cooperative (Cooperative) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr). Typical residential meters drew 1,153.4 kWh/mo ($160.27/mo) in 2025, while its tariff bills residential power at 13.9 c/kWh (-0.10 c/kWh vs North Carolina average vs. North Carolina), offsetting ~$1,501/yr on an 8 kW array—compare rates directly with Palmetto Solar, LLC (19.04 c/kWh).

## Where Does Mecklenburg Electric Cooperative Sit Across US Utility Rates?

National utility tariff curve marking Mecklenburg Electric Cooperative at 13.9 c/kWh vs. 18.54 c/kWh US mean.

## How Does Mecklenburg Electric Cooperative Rank Across Cost & Reliability?

Relative ranking of Mecklenburg Electric Cooperative on residential electricity pricing and annual IEEE SAIDI outage duration. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## What Do EIA-861 Benchmarks Show for Mecklenburg Electric Cooperative?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Mecklenburg Electric Cooperative in North Carolina.

Lowest Rate #939 / 1,989

### 13.9 c/kWh (-0.10 vs NC)

Commercial avg: 17.22 c/kWh; est. residential bill $160.27/mo.

State Reliability Context

### 191.5 min/yr (NC Avg)

Utility did not file separate IEEE SAIDI in 2025; North Carolina customer-weighted SAIDI is 191.5 min/yr.

Post-25D Payback

### 15.7 Years @ 13.9 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,501/yr at 1,350 kWh/kW.

Service Territory

### 138 Customers · 5 Counties

Serves 5 counties including Granville, Northampton, Person in North Carolina; state FEMA declarations (2015-2026): 29.

Mecklenburg Electric Cooperative Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1390 = $1,501/yr

EIA-861 2025 Utility ID 12260: Rate=13.9 c/kWh, Cust=138.

**Result:** 15.7 yr 8 kW cash payback at 13.9 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Mecklenburg Electric Cooperative?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Mecklenburg Electric Cooperative. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for Mecklenburg Electric Cooperative (Utility ID 12260).

| EIA Utility ID & BA Code | ID 12260 · PJM |
|---|---|
| State & Ownership Type | NC · Cooperative |
| Retail Electricity Rates | 13.9 c/kWh Res · 17.22 c Comm |
| Avg Monthly Usage & Bill | 1,153.4 kWh/mo ($160.27/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 5 counties (Granville, Northampton, Person, Vance, Warren) |

## Which Peer Electric Utilities Operate in NC?

Nearby North Carolina electric utilities of comparable customer size led by Palmetto Solar, LLC (19.04 c/kWh). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Palmetto Solar, LLC**](https://epri-peac.com/utilities/nc-palmetto-solar-llc-66026/) | 19.04 c | — | 0 | 135 |
| [**York Electric Coop Inc**](https://epri-peac.com/utilities/nc-york-electric-coop-inc-21002/) | 12.9 c | — | 0 | 16 |
| [**Broad River Electric Coop, Inc**](https://epri-peac.com/utilities/nc-broad-river-electric-coop-inc-2212/) | 16.65 c | — | 0 | 490 |
| [**Tri-State Electric Member Corp**](https://epri-peac.com/utilities/nc-tri-state-electric-member-corp-19154/) | 15.56 c | — | 0 | 1,581 |

What to Check & Best-Fit Scenarios

## What Should Mecklenburg Electric Cooperative Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Mecklenburg Electric Cooperative (Cooperative, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Mecklenburg Electric Cooperative acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: Mecklenburg Electric Cooperative interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### Mecklenburg Electric Cooperative Solar & Battery Evaluators

Compare your actual Mecklenburg Electric Cooperative monthly kWh statement against 13.9 c/kWh and verify current export tariffs in NC.

### Mecklenburg Electric Cooperative Outage & Generator Planners

Use Mecklenburg Electric Cooperative's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Mecklenburg Electric Cooperative (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Mecklenburg Electric Cooperative's residential electricity rate and 2026 solar payback?

Mecklenburg Electric Cooperative averages 13.9 c/kWh (-0.10 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,501/yr (15.7-year payback).

### How reliable is Mecklenburg Electric Cooperative compared to peer North Carolina utilities?

Mecklenburg Electric Cooperative did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr); compare rates and outage history directly with Palmetto Solar, LLC (19.04 c/kWh) across North Carolina.

### Which counties and customers does Mecklenburg Electric Cooperative serve in North Carolina?

EIA-861 filings list 138 customers across 5 counties including Granville, Northampton, Person, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Mecklenburg Electric Cooperative.

## Related Pages

Explore North Carolina energy benchmarks, Palmetto Solar, LLC, county outage profiles, and NEC 705.12 tools alongside Mecklenburg Electric Cooperative.

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.9 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
