title: "City of Wilson - (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-city-of-wilson-nc-20785/
description: "2025 EIA-861 profile for City of Wilson - (NC) (NC): 12.85 c/kWh rate, SAIDI 65.8 min/yr, 2025 rate & service profile. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Wilson - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Wilson - (NC) (EIA ID 20785, NC) serves 32,472 customers at 12.85 c/kWh (-1.15 c/kWh vs North Carolina average) with 65.8 min/yr SAIDI (1.1 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 20785

- **Res. Rate** : 12.85 c/kWh

- **SAIDI (All Events)** : 65.8 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Wilson - (NC) Compare on Tariffs and Reliability?

How City of Wilson - (NC) (Municipal) performs across 7 counties on kWh rates and outage resilience. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

City of Wilson - (NC) (Municipal) recorded 65.8 SAIDI outage minutes (1.1 hrs/yr, rank #150 of 751 reporting utilities). Typical residential meters drew 1,115.1 kWh/mo ($143.25/mo) in 2025, while its tariff offers a low 12.85 c/kWh residential rate (-5.69 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.0 years without federal 25D—compare rates directly with Randolph Electric Member Corp (16.15 c/kWh).

## Where Does City of Wilson - (NC) Sit Across US Utility Rates?

National utility tariff curve marking City of Wilson - (NC) at 12.85 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Wilson - (NC) Rank Across Cost & Reliability?

Relative ranking of City of Wilson - (NC) on residential electricity pricing and annual IEEE SAIDI outage duration. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## What Do EIA-861 Benchmarks Show for City of Wilson - (NC)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Wilson - (NC) in North Carolina.

Lowest Rate #606 / 1,989

### 12.85 c/kWh (-1.15 vs NC)

Commercial avg: 12.59 c/kWh; Industrial: 9.06 c/kWh; est. residential bill $143.25/mo.

Reliability #150 / 751

### 65.8 min/yr (1.1 hrs)

22.9% (15.1 min) from Major Event Days; avg restore 120.5 min (~3.6 kWh @ 1.8 kW).

Post-25D Payback

### 17.0 Years @ 12.85 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,388/yr at 1,350 kWh/kW.

Service Territory

### 32,472 Customers · 7 Counties

Serves 7 counties including Edgecombe, Greene, Johnston in North Carolina; state FEMA declarations (2015-2026): 29.

City of Wilson - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (120.5 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1285 = $1,388/yr

EIA-861 2025 Utility ID 20785: Rate=12.85 c/kWh, Cust=32,472, SAIDI=65.8 min.

**Result:** 1.1 outage hrs/yr; 17.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Wilson - (NC)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Wilson - (NC). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for City of Wilson - (NC) (Utility ID 20785).

| EIA Utility ID & BA Code | ID 20785 · CPLE |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 12.85 c/kWh Res · 12.59 c Comm · 9.06 c Ind |
| Avg Monthly Usage & Bill | 1,115.1 kWh/mo ($143.25/mo est.) |
| SAIDI (All Events w/ MED) | 65.8 min/yr (1.1 hrs/yr) |
| SAIDI (Without Major Events) | 50.7 min/yr (Storm share: 22.9%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.546 /yr · 120.5 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 7 counties (Edgecombe, Greene, Johnston, Nash, Pitt, Wayne, Wilson) |

## Which Peer Electric Utilities Operate in NC?

Nearby North Carolina electric utilities of comparable customer size led by Randolph Electric Member Corp (16.15 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Randolph Electric Member Corp**](https://epri-peac.com/utilities/nc-randolph-electric-member-corp-15671/) | 16.15 c | 224.9 min | 0 | 31,531 |
| [**Four County Elec Member Corp**](https://epri-peac.com/utilities/nc-four-county-elec-member-corp-6640/) | 15.1 c | — | 137 | 31,222 |
| [**Piedmont Electric Member Corp**](https://epri-peac.com/utilities/nc-piedmont-electric-member-corp-15023/) | 15.63 c | 502.7 min | 511 | 30,640 |
| [**Haywood Electric Member Corp**](https://epri-peac.com/utilities/nc-haywood-electric-member-corp-8333/) | 16.86 c | 776.3 min | 211 | 30,307 |

What to Check & Best-Fit Scenarios

## What Should City of Wilson - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Wilson - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Wilson - (NC) acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: City of Wilson - (NC) interconnection engineering still checks neighborhood transformer kVA regardless of 65.8 SAIDI.

### City of Wilson - (NC) Solar & Battery Evaluators

Compare your actual City of Wilson - (NC) monthly kWh statement against 12.85 c/kWh and verify current export tariffs in NC.

### City of Wilson - (NC) Outage & Generator Planners

Use City of Wilson - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Wilson - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Wilson - (NC)'s residential electricity rate and 2026 solar payback?

City of Wilson - (NC) averages 12.85 c/kWh (-1.15 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,388/yr (17.0-year payback).

### How reliable is City of Wilson - (NC) compared to peer North Carolina utilities?

City of Wilson - (NC) recorded 65.8 SAIDI outage minutes (1.1 hrs/yr, rank #150 of 751 reporting utilities); compare rates and outage history directly with Randolph Electric Member Corp (16.15 c/kWh) across North Carolina.

### Which counties and customers does City of Wilson - (NC) serve in North Carolina?

EIA-861 filings list 32,472 customers across 7 counties including Edgecombe, Greene, Johnston, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Wilson - (NC).

## Related Pages

Explore North Carolina energy benchmarks, Randolph Electric Member Corp, county outage profiles, and NEC 705.12 tools alongside City of Wilson - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.85 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)