---
title: "City of Rocky Mount - (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-city-of-rocky-mount-nc-16226/
description: "2025 EIA-861 profile for City of Rocky Mount - (NC) (NC): 13.16 c/kWh rate, SAIDI 81.4 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Rocky Mount - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Rocky Mount - (NC) (EIA ID 16226, NC) serves 24,395 customers at 13.16 c/kWh (-0.84 c/kWh vs North Carolina average) with 81.4 min/yr SAIDI (1.36 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 16226

- **Res. Rate** : 13.16 c/kWh

- **SAIDI (All Events)** : 81.4 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Rocky Mount - (NC) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.16 c/kWh), and outage history inside City of Rocky Mount - (NC) territory. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Homeowners inside City of Rocky Mount - (NC)'s North Carolina footprint (2 counties including Edgecombe, Nash) face 13.16 c/kWh benchmark pricing (-5.38 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 16.6 years. Reliability data recorded 81.4 SAIDI outage minutes (1.36 hrs/yr, rank #187 of 751 reporting utilities).

## Where Does City of Rocky Mount - (NC) Sit Across US Utility Rates?

Benchmarking City of Rocky Mount - (NC)'s 13.16 c/kWh residential rate against 1,989 EIA-861 utilities. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## How Does City of Rocky Mount - (NC) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Rocky Mount - (NC) across North Carolina utilities.

## What Do EIA-861 Benchmarks Show for City of Rocky Mount - (NC)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Rocky Mount - (NC) in 2025.

Lowest Rate #712 / 1,989

### 13.16 c/kWh (-0.84 vs NC)

Commercial avg: 10.18 c/kWh; Industrial: 8.68 c/kWh; est. residential bill $144.16/mo.

Reliability #187 / 751

### 81.4 min/yr (1.36 hrs)

11.7% (9.5 min) from Major Event Days; avg restore 67.8 min (~2.0 kWh @ 1.8 kW).

Post-25D Payback

### 16.6 Years @ 13.16 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,421/yr at 1,350 kWh/kW.

Service Territory

### 24,395 Customers · 2 Counties

Serves 2 counties including Edgecombe, Nash in North Carolina; state FEMA declarations (2015-2026): 29.

City of Rocky Mount - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (67.8 min / 60) * 1.8 kW = 2.0 kWh/event | Solar_Offset = 10,800 kWh * $0.1316 = $1,421/yr

EIA-861 2025 Utility ID 16226: Rate=13.16 c/kWh, Cust=24,395, SAIDI=81.4 min.

**Result:** 1.36 outage hrs/yr; 16.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Rocky Mount - (NC)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 16226. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for City of Rocky Mount - (NC) (Utility ID 16226).

| EIA Utility ID & BA Code | ID 16226 · CPLE |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 13.16 c/kWh Res · 10.18 c Comm · 8.68 c Ind |
| Avg Monthly Usage & Bill | 1,095.1 kWh/mo ($144.16/mo est.) |
| SAIDI (All Events w/ MED) | 81.4 min/yr (1.36 hrs/yr) |
| SAIDI (Without Major Events) | 71.9 min/yr (Storm share: 11.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.2 /yr · 67.8 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Edgecombe, Nash) |

## Which Peer Electric Utilities Operate in NC?

Benchmark City of Rocky Mount - (NC) directly against Tri-County Elec Member Corp (NC) and peer North Carolina retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Tri-County Elec Member Corp (NC)**](https://epri-peac.com/utilities/nc-tri-county-elec-member-corp-nc-18957/) | 13.29 c | 88.7 min | 150 | 22,887 |
| [**Tideland Electric Member Corp**](https://epri-peac.com/utilities/nc-tideland-electric-member-corp-19108/) | 16.41 c | 205.3 min | 0 | 21,906 |
| [**City of New Bern - (NC)**](https://epri-peac.com/utilities/nc-city-of-new-bern-nc-13416/) | 14.76 c | 115.1 min | 0 | 21,545 |
| [**City of Gastonia - (NC)**](https://epri-peac.com/utilities/nc-city-of-gastonia-nc-7027/) | 12.34 c | 362.1 min | 0 | 27,524 |

What to Check & Best-Fit Scenarios

## What Should City of Rocky Mount - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Rocky Mount - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Rocky Mount - (NC) (NC) shift real bills away from 13.16 c/kWh.
- Outage clustering: Major Event Days skew City of Rocky Mount - (NC) annual minutes differently than routine non-storm reliability.

### City of Rocky Mount - (NC) Solar & Battery Evaluators

Compare your actual City of Rocky Mount - (NC) monthly kWh statement against 13.16 c/kWh and verify current export tariffs in NC.

### City of Rocky Mount - (NC) Outage & Generator Planners

Use City of Rocky Mount - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Rocky Mount - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Rocky Mount - (NC)'s residential electricity rate and 2026 solar payback?

City of Rocky Mount - (NC) averages 13.16 c/kWh (-0.84 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,421/yr (16.6-year payback).

### How reliable is City of Rocky Mount - (NC) compared to peer North Carolina utilities?

City of Rocky Mount - (NC) recorded 81.4 SAIDI outage minutes (1.36 hrs/yr, rank #187 of 751 reporting utilities); compare rates and outage history directly with Tri-County Elec Member Corp (NC) (13.29 c/kWh) across North Carolina.

### Which counties and customers does City of Rocky Mount - (NC) serve in North Carolina?

EIA-861 filings list 24,395 customers across 2 counties including Edgecombe, Nash, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Rocky Mount - (NC).

## Related Pages

Explore North Carolina energy benchmarks, Tri-County Elec Member Corp (NC), county outage profiles, and NEC 705.12 tools alongside City of Rocky Mount - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.16 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
