---
title: "City of Lumberton - (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-city-of-lumberton-nc-11318/
description: "2025 EIA-861 profile for City of Lumberton - (NC) (NC): 13.86 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Lumberton - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Lumberton - (NC) (EIA ID 11318, NC) serves 9,938 customers at 13.86 c/kWh (-0.14 c/kWh vs North Carolina average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11318

- **Res. Rate** : 13.86 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Lumberton - (NC) Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.14 c/kWh vs North Carolina average), customer scale (9,938), and 2026 solar payback benchmarks for City of Lumberton - (NC).

Ranked #925 of 1,989 reporting US utilities for residential rate (top 46.8%; lower than 53.2% of peers), City of Lumberton - (NC) serves 9,938 accounts in North Carolina (Municipal). Commercial power averages 13.19 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Lumberton - (NC) Sit Across US Utility Rates?

Positions City of Lumberton - (NC) (13.86 c/kWh) across 1,989 US electric utility residential tariffs. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## How Does City of Lumberton - (NC) Rank Across Cost & Reliability?

Percentile placement of City of Lumberton - (NC) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Lumberton - (NC)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Lumberton - (NC) (Municipal) in North Carolina.

Lowest Rate #925 / 1,989

### 13.86 c/kWh (-0.14 vs NC)

Commercial avg: 13.19 c/kWh; Industrial: 10.3 c/kWh; est. residential bill $114.14/mo.

State Reliability Context

### 191.5 min/yr (NC Avg)

Utility did not file separate IEEE SAIDI in 2025; North Carolina customer-weighted SAIDI is 191.5 min/yr.

Post-25D Payback

### 15.8 Years @ 13.86 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,497/yr at 1,350 kWh/kW.

Service Territory

### 9,938 Customers · 1 County

Serves 1 county including Robeson in North Carolina; state FEMA declarations (2015-2026): 29.

City of Lumberton - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1386 = $1,497/yr

EIA-861 2025 Utility ID 11318: Rate=13.86 c/kWh, Cust=9,938.

**Result:** 15.8 yr 8 kW cash payback at 13.86 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Lumberton - (NC)?

Complete Form EIA-861 filing summary for City of Lumberton - (NC) (ID 11318) covering sales, PV, and counties. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Lumberton - (NC) (Utility ID 11318).

| EIA Utility ID & BA Code | ID 11318 · CPLE |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 13.86 c/kWh Res · 13.19 c Comm · 10.3 c Ind |
| Avg Monthly Usage & Bill | 823.6 kWh/mo ($114.14/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Robeson) |

## Which Peer Electric Utilities Operate in NC?

Compare City of Lumberton - (NC) directly with City of Kinston - (NC) and nearby North Carolina electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Kinston - (NC)**](https://epri-peac.com/utilities/nc-city-of-kinston-nc-10345/) | 12.96 c | 63.8 min | 0 | 10,040 |
| [**Edgecombe-Martin County E M C**](https://epri-peac.com/utilities/nc-edgecombe-martin-county-e-m-c-5656/) | 16.51 c | 103.8 min | 0 | 10,810 |
| [**Town of Huntersville - (NC)**](https://epri-peac.com/utilities/nc-town-of-huntersville-nc-9087/) | 12.57 c | 23.8 min | 0 | 8,617 |
| [**City of Albemarle - (NC)**](https://epri-peac.com/utilities/nc-city-of-albemarle-nc-232/) | 11.27 c | 14.1 min | 0 | 11,302 |

What to Check & Best-Fit Scenarios

## What Should City of Lumberton - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Lumberton - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Lumberton - (NC) acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: City of Lumberton - (NC) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Lumberton - (NC) Solar & Battery Evaluators

Compare your actual City of Lumberton - (NC) monthly kWh statement against 13.86 c/kWh and verify current export tariffs in NC.

### City of Lumberton - (NC) Outage & Generator Planners

Use City of Lumberton - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Lumberton - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Lumberton - (NC)'s residential electricity rate and 2026 solar payback?

City of Lumberton - (NC) averages 13.86 c/kWh (-0.14 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,497/yr (15.8-year payback).

### How reliable is City of Lumberton - (NC) compared to peer North Carolina utilities?

City of Lumberton - (NC) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr); compare rates and outage history directly with City of Kinston - (NC) (12.96 c/kWh) across North Carolina.

### Which counties and customers does City of Lumberton - (NC) serve in North Carolina?

EIA-861 filings list 9,938 customers across 1 county including Robeson, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Lumberton - (NC).

## Related Pages

Explore North Carolina energy benchmarks, City of Kinston - (NC), county outage profiles, and NEC 705.12 tools alongside City of Lumberton - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.86 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
