---
title: "City of Lexington - (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-city-of-lexington-nc-10966/
description: "2025 EIA-861 profile for City of Lexington - (NC) (NC): 11.62 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Lexington - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Lexington - (NC) (EIA ID 10966, NC) serves 18,282 customers at 11.62 c/kWh (-2.38 c/kWh vs North Carolina average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 10966

- **Res. Rate** : 11.62 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Lexington - (NC) Compare on Tariffs and Reliability?

Solar payback, residential tariff (11.62 c/kWh), and outage history inside City of Lexington - (NC) territory. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Evaluating solar or generator backup under City of Lexington - (NC) (North Carolina) starts with its 11.62 c/kWh residential baseline (-2.38 c/kWh vs North Carolina average) and 18.8-year 8 kW cash payback. EIA-861 records show City of Lexington - (NC) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr) across 18,282 accounts.

## Where Does City of Lexington - (NC) Sit Across US Utility Rates?

Benchmarking City of Lexington - (NC)'s 11.62 c/kWh residential rate against 1,989 EIA-861 utilities. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## How Does City of Lexington - (NC) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Lexington - (NC) across North Carolina utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for City of Lexington - (NC)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Lexington - (NC) in 2025.

Lowest Rate #334 / 1,989

### 11.62 c/kWh (-2.38 vs NC)

Commercial avg: 12.17 c/kWh; Industrial: 9.84 c/kWh; est. residential bill $130.71/mo.

State Reliability Context

### 191.5 min/yr (NC Avg)

Utility did not file separate IEEE SAIDI in 2025; North Carolina customer-weighted SAIDI is 191.5 min/yr.

Post-25D Payback

### 18.8 Years @ 11.62 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,255/yr at 1,350 kWh/kW.

Service Territory

### 18,282 Customers · 1 County

Serves 1 county including Davidson in North Carolina; state FEMA declarations (2015-2026): 29.

City of Lexington - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1162 = $1,255/yr

EIA-861 2025 Utility ID 10966: Rate=11.62 c/kWh, Cust=18,282.

**Result:** 18.8 yr 8 kW cash payback at 11.62 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Lexington - (NC)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 10966. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for City of Lexington - (NC) (Utility ID 10966).

| EIA Utility ID & BA Code | ID 10966 · DUK |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 11.62 c/kWh Res · 12.17 c Comm · 9.84 c Ind |
| Avg Monthly Usage & Bill | 1,125.0 kWh/mo ($130.71/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Davidson) |

## Which Peer Electric Utilities Operate in NC?

Benchmark City of Lexington - (NC) directly against Pee Dee Electric Member Corp and peer North Carolina retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Pee Dee Electric Member Corp**](https://epri-peac.com/utilities/nc-pee-dee-electric-member-corp-14717/) | 15.58 c | 284.6 min | 69 | 19,435 |
| [**Blue Ridge Mountain EMC - (GA)**](https://epri-peac.com/utilities/nc-blue-ridge-mountain-emc-ga-1891/) | 14.78 c | — | 0 | 16,040 |
| [**Central Electric Membership Corp. - (NC)**](https://epri-peac.com/utilities/nc-central-electric-membership-corp-nc-3250/) | 15.37 c | 267.7 min | 0 | 20,677 |
| [**Mountain Electric Coop, Inc**](https://epri-peac.com/utilities/nc-mountain-electric-coop-inc-13027/) | 13.17 c | — | 0 | 15,494 |

What to Check & Best-Fit Scenarios

## What Should City of Lexington - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Lexington - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Lexington - (NC) acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: City of Lexington - (NC) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Lexington - (NC) Solar & Battery Evaluators

Compare your actual City of Lexington - (NC) monthly kWh statement against 11.62 c/kWh and verify current export tariffs in NC.

### City of Lexington - (NC) Outage & Generator Planners

Use City of Lexington - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Lexington - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Lexington - (NC)'s residential electricity rate and 2026 solar payback?

City of Lexington - (NC) averages 11.62 c/kWh (-2.38 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,255/yr (18.8-year payback).

### How reliable is City of Lexington - (NC) compared to peer North Carolina utilities?

City of Lexington - (NC) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr); compare rates and outage history directly with Pee Dee Electric Member Corp (15.58 c/kWh) across North Carolina.

### Which counties and customers does City of Lexington - (NC) serve in North Carolina?

EIA-861 filings list 18,282 customers across 1 county including Davidson, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Lexington - (NC).

## Related Pages

Explore North Carolina energy benchmarks, Pee Dee Electric Member Corp, county outage profiles, and NEC 705.12 tools alongside City of Lexington - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.62 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
