# City of Gastonia - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Gastonia - (NC) (EIA ID 7027, NC) serves 27,524 customers at 12.34 c/kWh (-1.66 c/kWh vs North Carolina average) with 362.1 min/yr SAIDI (6.04 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7027

- **Res. Rate** : 12.34 c/kWh

- **SAIDI (All Events)** : 362.1 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Gastonia - (NC) Compare on Tariffs and Reliability?

How City of Gastonia - (NC) (Municipal) performs across 1 county on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

City of Gastonia - (NC) (Municipal) logged 362.1 SAIDI outage minutes (6.04 hrs/yr, 58.5% storm-driven), making battery backup or a standby ATS worthwhile. Typical residential meters drew 902.5 kWh/mo ($111.39/mo) in 2025, while its tariff offers a low 12.34 c/kWh residential rate (-6.20 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.7 years without federal 25D—compare rates directly with Surry-Yadkin Elec Member Corp (17.53 c/kWh).

## Where Does City of Gastonia - (NC) Sit Across US Utility Rates?

National utility tariff curve marking City of Gastonia - (NC) at 12.34 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Gastonia - (NC) Rank Across Cost & Reliability?

Relative ranking of City of Gastonia - (NC) on residential electricity pricing and annual IEEE SAIDI outage duration. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## What Do EIA-861 Benchmarks Show for City of Gastonia - (NC)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Gastonia - (NC) in North Carolina.

Lowest Rate #475 / 1,989

### 12.34 c/kWh (-1.66 vs NC)

Commercial avg: 10.92 c/kWh; Industrial: 7.53 c/kWh; est. residential bill $111.39/mo.

Reliability #572 / 751

### 362.1 min/yr (6.04 hrs)

58.5% (211.7 min) from Major Event Days; avg restore 373.3 min (~11.2 kWh @ 1.8 kW).

Post-25D Payback

### 17.7 Years @ 12.34 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,333/yr at 1,350 kWh/kW.

Service Territory

### 27,524 Customers · 1 County

Serves 1 county including Gaston in North Carolina; state FEMA declarations (2015-2026): 29.

City of Gastonia - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (373.3 min / 60) * 1.8 kW = 11.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1234 = $1,333/yr

EIA-861 2025 Utility ID 7027: Rate=12.34 c/kWh, Cust=27,524, SAIDI=362.1 min.

**Result:** 6.04 outage hrs/yr; 17.7 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Gastonia - (NC)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Gastonia - (NC). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for City of Gastonia - (NC) (Utility ID 7027).

| EIA Utility ID & BA Code | ID 7027 · DUK |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 12.34 c/kWh Res · 10.92 c Comm · 7.53 c Ind |
| Avg Monthly Usage & Bill | 902.5 kWh/mo ($111.39/mo est.) |
| SAIDI (All Events w/ MED) | 362.1 min/yr (6.04 hrs/yr) |
| SAIDI (Without Major Events) | 150.4 min/yr (Storm share: 58.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.97 /yr · 373.3 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Gaston) |

## Which Peer Electric Utilities Operate in NC?

Nearby North Carolina electric utilities of comparable customer size led by Surry-Yadkin Elec Member Corp (17.53 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Surry-Yadkin Elec Member Corp**](https://epri-peac.com/utilities/nc-surry-yadkin-elec-member-corp-18339/) | 17.53 c | 249.3 min | 0 | 28,296 |
| [**Town of Apex- (NC)**](https://epri-peac.com/utilities/nc-town-of-apex-nc-719/) | 16.72 c | 44.5 min | 1,091 | 29,754 |
| [**City of Concord - (NC)**](https://epri-peac.com/utilities/nc-city-of-concord-nc-4150/) | 11.57 c | 65.3 min | 0 | 30,029 |
| [**Haywood Electric Member Corp**](https://epri-peac.com/utilities/nc-haywood-electric-member-corp-8333/) | 16.86 c | 776.3 min | 211 | 30,307 |

What to Check & Best-Fit Scenarios

## What Should City of Gastonia - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Gastonia - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Gastonia - (NC) acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: City of Gastonia - (NC) interconnection engineering still checks neighborhood transformer kVA regardless of 362.1 SAIDI.

### City of Gastonia - (NC) Solar & Battery Evaluators

Compare your actual City of Gastonia - (NC) monthly kWh statement against 12.34 c/kWh and verify current export tariffs in NC.

### City of Gastonia - (NC) Outage & Generator Planners

Use City of Gastonia - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Gastonia - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Gastonia - (NC)'s residential electricity rate and 2026 solar payback?

City of Gastonia - (NC) averages 12.34 c/kWh (-1.66 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,333/yr (17.7-year payback).

### How reliable is City of Gastonia - (NC) compared to peer North Carolina utilities?

City of Gastonia - (NC) logged 362.1 SAIDI outage minutes (6.04 hrs/yr, 58.5% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Surry-Yadkin Elec Member Corp (17.53 c/kWh) across North Carolina.

### Which counties and customers does City of Gastonia - (NC) serve in North Carolina?

EIA-861 filings list 27,524 customers across 1 county including Gaston, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Gastonia - (NC).

## Related Pages

Explore North Carolina energy benchmarks, Surry-Yadkin Elec Member Corp, county outage profiles, and NEC 705.12 tools alongside City of Gastonia - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.34 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)