EIA-861 Grid Reliability & Net Metering

# City of Concord - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Concord - (NC) (EIA ID 4150, NC) serves 30,029 customers at 11.57 c/kWh (-2.43 c/kWh vs North Carolina average) with 65.3 min/yr SAIDI (1.09 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4150

- **Res. Rate** : 11.57 c/kWh

- **SAIDI (All Events)** : 65.3 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Concord - (NC) Compare on Tariffs and Reliability?

Solar payback, residential tariff (11.57 c/kWh), and outage history inside City of Concord - (NC) territory. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Evaluating solar or generator backup under City of Concord - (NC) (North Carolina) starts with its 11.57 c/kWh residential baseline (-2.43 c/kWh vs North Carolina average) and 18.9-year 8 kW cash payback. EIA-861 records show City of Concord - (NC) recorded 65.3 SAIDI outage minutes (1.09 hrs/yr, rank #147 of 751 reporting utilities) across 30,029 accounts.

## Where Does City of Concord - (NC) Sit Across US Utility Rates?

Benchmarking City of Concord - (NC)'s 11.57 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does City of Concord - (NC) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Concord - (NC) across North Carolina utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for City of Concord - (NC)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Concord - (NC) in 2025.

Lowest Rate #326 / 1,989

### 11.57 c/kWh (-2.43 vs NC)

Commercial avg: 10.61 c/kWh; Industrial: 8.07 c/kWh; est. residential bill $119.65/mo.

Reliability #147 / 751

### 65.3 min/yr (1.09 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 107.3 min (~3.2 kWh @ 1.8 kW).

Post-25D Payback

### 18.9 Years @ 11.57 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,250/yr at 1,350 kWh/kW.

Service Territory

### 30,029 Customers · 1 County

Serves 1 county including Cabarrus in North Carolina; state FEMA declarations (2015-2026): 29.

City of Concord - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (107.3 min / 60) * 1.8 kW = 3.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1157 = $1,250/yr

EIA-861 2025 Utility ID 4150: Rate=11.57 c/kWh, Cust=30,029, SAIDI=65.3 min.

**Result:** 1.09 outage hrs/yr; 18.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Concord - (NC)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 4150. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for City of Concord - (NC) (Utility ID 4150).

| EIA Utility ID & BA Code | ID 4150 · DUK |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 11.57 c/kWh Res · 10.61 c Comm · 8.07 c Ind |
| Avg Monthly Usage & Bill | 1,034.5 kWh/mo ($119.65/mo est.) |
| SAIDI (All Events w/ MED) | 65.3 min/yr (1.09 hrs/yr) |
| SAIDI (Without Major Events) | 65.3 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.609 /yr · 107.3 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Cabarrus) |

## Which Peer Electric Utilities Operate in NC?

Benchmark City of Concord - (NC) directly against Town of Apex- (NC) and peer North Carolina retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Town of Apex- (NC)**](https://epri-peac.com/utilities/nc-town-of-apex-nc-719/) | 16.72 c | 44.5 min | 1,091 | 29,754 |
| [**Haywood Electric Member Corp**](https://epri-peac.com/utilities/nc-haywood-electric-member-corp-8333/) | 16.86 c | 776.3 min | 211 | 30,307 |
| [**Piedmont Electric Member Corp**](https://epri-peac.com/utilities/nc-piedmont-electric-member-corp-15023/) | 15.63 c | 502.7 min | 511 | 30,640 |
| [**Four County Elec Member Corp**](https://epri-peac.com/utilities/nc-four-county-elec-member-corp-6640/) | 15.1 c | — | 137 | 31,222 |

What to Check & Best-Fit Scenarios

## What Should City of Concord - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Concord - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Concord - (NC) acts as a wires-only TDU or bundled utility in NC.
- Transformer limits: City of Concord - (NC) interconnection engineering still checks neighborhood transformer kVA regardless of 65.3 SAIDI.

### City of Concord - (NC) Solar & Battery Evaluators

Compare your actual City of Concord - (NC) monthly kWh statement against 11.57 c/kWh and verify current export tariffs in NC.

### City of Concord - (NC) Outage & Generator Planners

Use City of Concord - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Concord - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Concord - (NC)'s residential electricity rate and 2026 solar payback?

City of Concord - (NC) averages 11.57 c/kWh (-2.43 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,250/yr (18.9-year payback).

### How reliable is City of Concord - (NC) compared to peer North Carolina utilities?

City of Concord - (NC) recorded 65.3 SAIDI outage minutes (1.09 hrs/yr, rank #147 of 751 reporting utilities); compare rates and outage history directly with Town of Apex- (NC) (16.72 c/kWh) across North Carolina.

### Which counties and customers does City of Concord - (NC) serve in North Carolina?

EIA-861 filings list 30,029 customers across 1 county including Cabarrus, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Concord - (NC).

## Related Pages

Explore North Carolina energy benchmarks, Town of Apex- (NC), county outage profiles, and NEC 705.12 tools alongside City of Concord - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.57 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)