---
title: "City of Albemarle - (NC) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-city-of-albemarle-nc-232/
description: "2025 EIA-861 profile for City of Albemarle - (NC) (NC): 11.27 c/kWh rate, SAIDI 14.1 min/yr, 2025 rate & service profile. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Albemarle - (NC) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Albemarle - (NC) (EIA ID 232, NC) serves 11,302 customers at 11.27 c/kWh (-2.73 c/kWh vs North Carolina average) with 14.1 min/yr SAIDI (0.23 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 232

- **Res. Rate** : 11.27 c/kWh

- **SAIDI (All Events)** : 14.1 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Albemarle - (NC) Compare on Tariffs and Reliability?

Solar payback, residential tariff (11.27 c/kWh), and outage history inside City of Albemarle - (NC) territory. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Evaluating solar or generator backup under City of Albemarle - (NC) (North Carolina) starts with its 11.27 c/kWh residential baseline (-2.73 c/kWh vs North Carolina average) and 19.4-year 8 kW cash payback. EIA-861 records show City of Albemarle - (NC) recorded 14.1 SAIDI outage minutes (0.23 hrs/yr, rank #23 of 751 reporting utilities) across 11,302 accounts.

## Where Does City of Albemarle - (NC) Sit Across US Utility Rates?

Benchmarking City of Albemarle - (NC)'s 11.27 c/kWh residential rate against 1,989 EIA-861 utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## How Does City of Albemarle - (NC) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Albemarle - (NC) across North Carolina utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for City of Albemarle - (NC)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Albemarle - (NC) in 2025.

Lowest Rate #273 / 1,989

### 11.27 c/kWh (-2.73 vs NC)

Commercial avg: 9.86 c/kWh; Industrial: 8.15 c/kWh; est. residential bill $124.04/mo.

Reliability #23 / 751

### 14.1 min/yr (0.23 hrs)

51.1% (7.2 min) from Major Event Days; avg restore 234.8 min (~7.0 kWh @ 1.8 kW).

Post-25D Payback

### 19.4 Years @ 11.27 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,217/yr at 1,350 kWh/kW.

Service Territory

### 11,302 Customers · 1 County

Serves 1 county including Stanly in North Carolina; state FEMA declarations (2015-2026): 29.

City of Albemarle - (NC) Reliability & Solar Offset Calculation

Backup_Energy = (234.8 min / 60) * 1.8 kW = 7.0 kWh/event | Solar_Offset = 10,800 kWh * $0.1127 = $1,217/yr

EIA-861 2025 Utility ID 232: Rate=11.27 c/kWh, Cust=11,302, SAIDI=14.1 min.

**Result:** 0.23 outage hrs/yr; 19.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Albemarle - (NC)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 232. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Albemarle - (NC) (Utility ID 232).

| EIA Utility ID & BA Code | ID 232 · DUK |
|---|---|
| State & Ownership Type | NC · Municipal |
| Retail Electricity Rates | 11.27 c/kWh Res · 9.86 c Comm · 8.15 c Ind |
| Avg Monthly Usage & Bill | 1,100.5 kWh/mo ($124.04/mo est.) |
| SAIDI (All Events w/ MED) | 14.1 min/yr (0.23 hrs/yr) |
| SAIDI (Without Major Events) | 6.9 min/yr (Storm share: 51.1%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.06 /yr · 234.8 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Stanly) |

## Which Peer Electric Utilities Operate in NC?

Benchmark City of Albemarle - (NC) directly against City of Monroe - (NC) and peer North Carolina retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Monroe - (NC)**](https://epri-peac.com/utilities/nc-city-of-monroe-nc-12801/) | 11.72 c | 31.0 min | 0 | 11,313 |
| [**City of Elizabeth City - (NC)**](https://epri-peac.com/utilities/nc-city-of-elizabeth-city-nc-5760/) | 12.03 c | — | 0 | 11,554 |
| [**City of Washington - (NC)**](https://epri-peac.com/utilities/nc-city-of-washington-nc-20142/) | 12.98 c | — | 0 | 11,572 |
| [**Edgecombe-Martin County E M C**](https://epri-peac.com/utilities/nc-edgecombe-martin-county-e-m-c-5656/) | 16.51 c | 103.8 min | 0 | 10,810 |

What to Check & Best-Fit Scenarios

## What Should City of Albemarle - (NC) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Albemarle - (NC) (Municipal, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Albemarle - (NC) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in NC.
- Export credit rules: check City of Albemarle - (NC)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Albemarle - (NC) Solar & Battery Evaluators

Compare your actual City of Albemarle - (NC) monthly kWh statement against 11.27 c/kWh and verify current export tariffs in NC.

### City of Albemarle - (NC) Outage & Generator Planners

Use City of Albemarle - (NC)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Albemarle - (NC) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Albemarle - (NC)'s residential electricity rate and 2026 solar payback?

City of Albemarle - (NC) averages 11.27 c/kWh (-2.73 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,217/yr (19.4-year payback).

### How reliable is City of Albemarle - (NC) compared to peer North Carolina utilities?

City of Albemarle - (NC) recorded 14.1 SAIDI outage minutes (0.23 hrs/yr, rank #23 of 751 reporting utilities); compare rates and outage history directly with City of Monroe - (NC) (11.72 c/kWh) across North Carolina.

### Which counties and customers does City of Albemarle - (NC) serve in North Carolina?

EIA-861 filings list 11,302 customers across 1 county including Stanly, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Albemarle - (NC).

## Related Pages

Explore North Carolina energy benchmarks, City of Monroe - (NC), county outage profiles, and NEC 705.12 tools alongside City of Albemarle - (NC).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.27 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
