title: "Blue Ridge Mountain EMC - (GA) (NC) Rate & SAIDI"
url: https://epri-peac.com/utilities/nc-blue-ridge-mountain-emc-ga-1891/
description: "2025 EIA-861 profile for Blue Ridge Mountain EMC - (GA) (NC): 14.78 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Blue Ridge Mountain EMC - (GA) (NC) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Blue Ridge Mountain EMC - (GA) (EIA ID 1891, NC) serves 16,040 customers at 14.78 c/kWh (+0.78 c/kWh vs North Carolina average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 1891

- **Res. Rate** : 14.78 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Blue Ridge Mountain EMC - (GA) Compare on Tariffs and Reliability?

EIA-861 rate delta (+0.78 c/kWh vs North Carolina average), customer scale (16,040), and 2026 solar payback benchmarks for Blue Ridge Mountain EMC - (GA).

Ranked #1,164 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 41.4% of peers), Blue Ridge Mountain EMC - (GA) serves 16,040 accounts in North Carolina (Cooperative). Commercial power averages 18.24 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does Blue Ridge Mountain EMC - (GA) Sit Across US Utility Rates?

Positions Blue Ridge Mountain EMC - (GA) (14.78 c/kWh) across 1,989 US electric utility residential tariffs. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does Blue Ridge Mountain EMC - (GA) Rank Across Cost & Reliability?

Percentile placement of Blue Ridge Mountain EMC - (GA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Blue Ridge Mountain EMC - (GA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for Blue Ridge Mountain EMC - (GA) (Cooperative) in North Carolina.

Lowest Rate #1,164 / 1,989

### 14.78 c/kWh (+0.78 vs NC)

Commercial avg: 18.24 c/kWh; Industrial: 5.19 c/kWh; est. residential bill $141.61/mo.

State Reliability Context

### 191.5 min/yr (NC Avg)

Utility did not file separate IEEE SAIDI in 2025; North Carolina customer-weighted SAIDI is 191.5 min/yr.

Post-25D Payback

### 14.8 Years @ 14.78 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,596/yr at 1,350 kWh/kW.

Service Territory

### 16,040 Customers · 1 County

Serves 1 county including Cherokee in North Carolina; state FEMA declarations (2015-2026): 29.

Blue Ridge Mountain EMC - (GA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1478 = $1,596/yr

EIA-861 2025 Utility ID 1891: Rate=14.78 c/kWh, Cust=16,040.

**Result:** 14.8 yr 8 kW cash payback at 14.78 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Blue Ridge Mountain EMC - (GA)?

Complete Form EIA-861 filing summary for Blue Ridge Mountain EMC - (GA) (ID 1891) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for Blue Ridge Mountain EMC - (GA) (Utility ID 1891).

| EIA Utility ID & BA Code | ID 1891 · TVA |
|---|---|
| State & Ownership Type | NC · Cooperative |
| Retail Electricity Rates | 14.78 c/kWh Res · 18.24 c Comm · 5.19 c Ind |
| Avg Monthly Usage & Bill | 957.9 kWh/mo ($141.61/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Cherokee) |

## Which Peer Electric Utilities Operate in NC?

Compare Blue Ridge Mountain EMC - (GA) directly with Mountain Electric Coop, Inc and nearby North Carolina electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Mountain Electric Coop, Inc**](https://epri-peac.com/utilities/nc-mountain-electric-coop-inc-13027/) | 13.17 c | — | 0 | 15,494 |
| [**City of Lexington - (NC)**](https://epri-peac.com/utilities/nc-city-of-lexington-nc-10966/) | 11.62 c | — | 0 | 18,282 |
| [**Albemarle Electric Member Corp**](https://epri-peac.com/utilities/nc-albemarle-electric-member-corp-240/) | 15.15 c | — | 33 | 12,810 |
| [**Pee Dee Electric Member Corp**](https://epri-peac.com/utilities/nc-pee-dee-electric-member-corp-14717/) | 15.58 c | 284.6 min | 69 | 19,435 |

What to Check & Best-Fit Scenarios

## What Should Blue Ridge Mountain EMC - (GA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Blue Ridge Mountain EMC - (GA) (Cooperative, NC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Blue Ridge Mountain EMC - (GA) (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in NC.
- Export credit rules: check Blue Ridge Mountain EMC - (GA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Blue Ridge Mountain EMC - (GA) Solar & Battery Evaluators

Compare your actual Blue Ridge Mountain EMC - (GA) monthly kWh statement against 14.78 c/kWh and verify current export tariffs in NC.

### Blue Ridge Mountain EMC - (GA) Outage & Generator Planners

Use Blue Ridge Mountain EMC - (GA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Blue Ridge Mountain EMC - (GA) (North Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Blue Ridge Mountain EMC - (GA)'s residential electricity rate and 2026 solar payback?

Blue Ridge Mountain EMC - (GA) averages 14.78 c/kWh (+0.78 c/kWh vs North Carolina average vs. North Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,596/yr (14.8-year payback).

### How reliable is Blue Ridge Mountain EMC - (GA) compared to peer North Carolina utilities?

Blue Ridge Mountain EMC - (GA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 191.5 min/yr); compare rates and outage history directly with Mountain Electric Coop, Inc (13.17 c/kWh) across North Carolina.

### Which counties and customers does Blue Ridge Mountain EMC - (GA) serve in North Carolina?

EIA-861 filings list 16,040 customers across 1 county including Cherokee, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Blue Ridge Mountain EMC - (GA).

## Related Pages

Explore North Carolina energy benchmarks, Mountain Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Blue Ridge Mountain EMC - (GA).

[North Carolina State Energy Rates & Utilities](https://epri-peac.com/states/north-carolina/) [All North Carolina County Power & Outage Profiles](https://epri-peac.com/counties/north-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.78 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)