# Fergus Electric Coop, Inc (MT) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Fergus Electric Coop, Inc (EIA ID 21513, MT) serves 6,855 customers at 15.91 c/kWh (+2.92 c/kWh vs Montana average) with no standalone IEEE SAIDI filing (14 counties served) with 89 net-metered residential solar systems (1.3% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 21513

- **Res. Rate** : 15.91 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 89 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Fergus Electric Coop, Inc Compare on Tariffs and Reliability?

How Fergus Electric Coop, Inc (Cooperative) performs across 14 counties on kWh rates and outage resilience. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Across 14 counties including Blaine, Cascade, Chouteau, Fergus Electric Coop, Inc bills residential power at 15.91 c/kWh (+2.92 c/kWh vs Montana average vs. Montana), offsetting ~$1,718/yr on an 8 kW array compared to peer Northern Lights, Inc (13.06 c/kWh). With 6,855 customer accounts (Cooperative), 2025 Form EIA-861 shows Fergus Electric Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 286.3 min/yr), with 89 net-metered residential solar systems (1.3% customer adoption).

## Where Does Fergus Electric Coop, Inc Sit Across US Utility Rates?

National utility tariff curve marking Fergus Electric Coop, Inc at 15.91 c/kWh vs. 18.54 c/kWh US mean.

## How Does Fergus Electric Coop, Inc Rank Across Cost & Reliability?

Relative ranking of Fergus Electric Coop, Inc on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for Fergus Electric Coop, Inc?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Fergus Electric Coop, Inc in Montana.

Lowest Rate #1,388 / 1,989

### 15.91 c/kWh (+2.92 vs MT)

Commercial avg: 9.93 c/kWh; Industrial: 16.31 c/kWh; est. residential bill $142.55/mo.

State Reliability Context

### 286.3 min/yr (MT Avg)

Utility did not file separate IEEE SAIDI in 2025; Montana customer-weighted SAIDI is 286.3 min/yr.

Post-25D Payback

### 13.7 Years @ 15.91 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,718/yr at 1,350 kWh/kW.

Distributed PV

### 89 Net-Metered Systems

1.056 MW residential PV (1.3% of customers) across 14 counties; state FEMA declarations (2015-2026): 45.

Fergus Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1591 = $1,718/yr

EIA-861 2025 Utility ID 21513: Rate=15.91 c/kWh, Cust=6,855, PV=89.

**Result:** 13.7 yr 8 kW cash payback at 15.91 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Fergus Electric Coop, Inc?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Fergus Electric Coop, Inc. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for Fergus Electric Coop, Inc (Utility ID 21513).

| EIA Utility ID & BA Code | ID 21513 · WAUW |
|---|---|
| State & Ownership Type | MT · Cooperative |
| Retail Electricity Rates | 15.91 c/kWh Res · 9.93 c Comm · 16.31 c Ind |
| Avg Monthly Usage & Bill | 895.8 kWh/mo ($142.55/mo est.) |
| Residential Net-Metered PV | 89 systems (1.056 MW) |
| Counties Served (Sample) | 14 counties (Blaine, Cascade, Chouteau, Fergus, Golden Valley, Judith Basin, Meagher, Musselshell, Petroleum, Stillwater) |

## Which Peer Electric Utilities Operate in MT?

Nearby Montana electric utilities of comparable customer size led by Northern Lights, Inc (13.06 c/kWh). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Northern Lights, Inc**](https://epri-peac.com/utilities/mt-northern-lights-inc-13758/) | 13.06 c | — | 0 | 4,700 |
| [**Lower Yellowstone R E A, Inc**](https://epri-peac.com/utilities/mt-lower-yellowstone-r-e-a-inc-11272/) | 9.2 c | — | 5 | 3,247 |
| [**Fall River Rural Elec Coop Inc**](https://epri-peac.com/utilities/mt-fall-river-rural-elec-coop-inc-6169/) | 11.11 c | 14.4 min | 5 | 1,525 |
| [**Powder River Energy Corp**](https://epri-peac.com/utilities/mt-powder-river-energy-corp-19156/) | 13.2 c | — | 0 | 51 |

What to Check & Best-Fit Scenarios

## What Should Fergus Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Fergus Electric Coop, Inc (Cooperative, MT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Fergus Electric Coop, Inc's 15.91 c/kWh blended residential rate in MT does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Fergus Electric Coop, Inc system-wide SAIDI averages rural and urban circuits across its MT territory or nearby Northern Lights, Inc.

### Fergus Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Fergus Electric Coop, Inc monthly kWh statement against 15.91 c/kWh and verify current export tariffs in MT.

### Fergus Electric Coop, Inc Outage & Generator Planners

Use Fergus Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Fergus Electric Coop, Inc (Montana) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Fergus Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Fergus Electric Coop, Inc averages 15.91 c/kWh (+2.92 c/kWh vs Montana average vs. Montana). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,718/yr (13.7-year payback).

### How reliable is Fergus Electric Coop, Inc compared to peer Montana utilities?

Fergus Electric Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 286.3 min/yr); compare rates and outage history directly with Northern Lights, Inc (13.06 c/kWh) across Montana.

### Which counties and customers does Fergus Electric Coop, Inc serve in Montana?

EIA-861 filings list 6,855 customers across 14 counties including Blaine, Cascade, Chouteau, with 89 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Fergus Electric Coop, Inc.

## Related Pages

Explore Montana energy benchmarks, Northern Lights, Inc, county outage profiles, and NEC 705.12 tools alongside Fergus Electric Coop, Inc.

[Montana State Energy Rates & Utilities](https://epri-peac.com/states/montana/) [All Montana County Power & Outage Profiles](https://epri-peac.com/counties/montana/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.91 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)