---
title: "City of Starkville (MS) Rate & SAIDI"
url: https://epri-peac.com/utilities/ms-city-of-starkville-18006/
description: "2025 EIA-861 profile for City of Starkville (MS): 12.71 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Starkville (MS) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Starkville (EIA ID 18006, MS) serves 12,799 customers at 12.71 c/kWh (-1.32 c/kWh vs Mississippi average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 18006

- **Res. Rate** : 12.71 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Starkville Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.71 c/kWh), and outage history inside City of Starkville territory. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Homeowners inside City of Starkville's Mississippi footprint (1 county including Oktibbeha) face 12.71 c/kWh benchmark pricing (-5.83 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 17.2 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr).

## Where Does City of Starkville Sit Across US Utility Rates?

Benchmarking City of Starkville's 12.71 c/kWh residential rate against 1,989 EIA-861 utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## How Does City of Starkville Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Starkville across Mississippi utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## What Do EIA-861 Benchmarks Show for City of Starkville?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Starkville in 2025. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Lowest Rate #564 / 1,989

### 12.71 c/kWh (-1.32 vs MS)

Commercial avg: 10.35 c/kWh; Industrial: 7.57 c/kWh; est. residential bill $106.88/mo.

State Reliability Context

### 524.4 min/yr (MS Avg)

Utility did not file separate IEEE SAIDI in 2025; Mississippi customer-weighted SAIDI is 524.4 min/yr.

Post-25D Payback

### 17.2 Years @ 12.71 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,373/yr at 1,350 kWh/kW.

Service Territory

### 12,799 Customers · 1 County

Serves 1 county including Oktibbeha in Mississippi; state FEMA declarations (2015-2026): 34.

City of Starkville Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1271 = $1,373/yr

EIA-861 2025 Utility ID 18006: Rate=12.71 c/kWh, Cust=12,799.

**Result:** 17.2 yr 8 kW cash payback at 12.71 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Starkville?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 18006. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for City of Starkville (Utility ID 18006).

| EIA Utility ID & BA Code | ID 18006 · TVA |
|---|---|
| State & Ownership Type | MS · Municipal |
| Retail Electricity Rates | 12.71 c/kWh Res · 10.35 c Comm · 7.57 c Ind |
| Avg Monthly Usage & Bill | 840.7 kWh/mo ($106.88/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Oktibbeha) |

## Which Peer Electric Utilities Operate in MS?

Benchmark City of Starkville directly against Natchez Trace Elec Power Assn and peer Mississippi retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Natchez Trace Elec Power Assn**](https://epri-peac.com/utilities/ms-natchez-trace-elec-power-assn-13227/) | 13.46 c | — | 0 | 12,599 |
| [**Tishomingo County E P A**](https://epri-peac.com/utilities/ms-tishomingo-county-e-p-a-18951/) | 13.33 c | — | 0 | 10,997 |
| [**Prentiss County Elec Pwr Assn**](https://epri-peac.com/utilities/ms-prentiss-county-elec-pwr-assn-15334/) | 11.51 c | — | 0 | 10,994 |
| [**City of Tupelo - (MS)**](https://epri-peac.com/utilities/ms-city-of-tupelo-ms-19273/) | 11.8 c | — | 0 | 10,646 |

What to Check & Best-Fit Scenarios

## What Should City of Starkville Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Starkville (Municipal, MS) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Starkville (MS) shift real bills away from 12.71 c/kWh.
- Outage clustering: Major Event Days skew City of Starkville annual minutes differently than routine non-storm reliability.

### City of Starkville Solar & Battery Evaluators

Compare your actual City of Starkville monthly kWh statement against 12.71 c/kWh and verify current export tariffs in MS.

### City of Starkville Outage & Generator Planners

Use City of Starkville's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Starkville (Mississippi) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

### What is City of Starkville's residential electricity rate and 2026 solar payback?

City of Starkville averages 12.71 c/kWh (-1.32 c/kWh vs Mississippi average vs. Mississippi). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,373/yr (17.2-year payback).

### How reliable is City of Starkville compared to peer Mississippi utilities?

City of Starkville did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr); compare rates and outage history directly with Natchez Trace Elec Power Assn (13.46 c/kWh) across Mississippi.

### Which counties and customers does City of Starkville serve in Mississippi?

EIA-861 filings list 12,799 customers across 1 county including Oktibbeha, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Starkville.

## Related Pages

Explore Mississippi energy benchmarks, Natchez Trace Elec Power Assn, county outage profiles, and NEC 705.12 tools alongside City of Starkville.

[Mississippi State Energy Rates & Utilities](https://epri-peac.com/states/mississippi/) [All Mississippi County Power & Outage Profiles](https://epri-peac.com/counties/mississippi/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.71 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
