Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Oxford - (MS) (EIA ID 14275, MS) serves 8,620 customers at 12.23 c/kWh (-1.80 c/kWh vs Mississippi average) with 137.3 min/yr SAIDI (2.29 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14275

- **Res. Rate** : 12.23 c/kWh

- **SAIDI (All Events)** : 137.3 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Oxford - (MS) Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.80 c/kWh vs Mississippi average), customer scale (8,620), and 2026 solar payback benchmarks for City of Oxford - (MS).

Serving 8,620 customers across 1 county including Lafayette in Mississippi, City of Oxford - (MS) (Municipal, Balancing Authority TVA) offers a low 12.23 c/kWh residential rate (-6.31 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.9 years without federal 25D. Grid filings show the utility recorded 137.3 SAIDI outage minutes (2.29 hrs/yr, rank #312 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Oxford - (MS) Sit Across US Utility Rates?

Positions City of Oxford - (MS) (12.23 c/kWh) across 1,989 US electric utility residential tariffs. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## How Does City of Oxford - (MS) Rank Across Cost & Reliability?

Percentile placement of City of Oxford - (MS) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Oxford - (MS)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Oxford - (MS) (Municipal) in Mississippi. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Lowest Rate #444 / 1,989

### 12.23 c/kWh (-1.80 vs MS)

Commercial avg: 11.97 c/kWh; est. residential bill $111.96/mo.

Reliability #312 / 751

### 137.3 min/yr (2.29 hrs)

66.5% (91.3 min) from Major Event Days; avg restore 123.7 min (~3.7 kWh @ 1.8 kW).

Post-25D Payback

### 17.9 Years @ 12.23 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,321/yr at 1,350 kWh/kW.

Service Territory

### 8,620 Customers · 1 County

Serves 1 county including Lafayette in Mississippi; state FEMA declarations (2015-2026): 34.

City of Oxford - (MS) Reliability & Solar Offset Calculation

Backup_Energy = (123.7 min / 60) * 1.8 kW = 3.7 kWh/event | Solar_Offset = 10,800 kWh * $0.1223 = $1,321/yr

EIA-861 2025 Utility ID 14275: Rate=12.23 c/kWh, Cust=8,620, SAIDI=137.3 min.

**Result:** 2.29 outage hrs/yr; 17.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Oxford - (MS)?

Complete Form EIA-861 filing summary for City of Oxford - (MS) (ID 14275) covering sales, PV, and counties. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for City of Oxford - (MS) (Utility ID 14275).

| EIA Utility ID & BA Code | ID 14275 · TVA |
|---|---|
| State & Ownership Type | MS · Municipal |
| Retail Electricity Rates | 12.23 c/kWh Res · 11.97 c Comm |
| Avg Monthly Usage & Bill | 915.1 kWh/mo ($111.96/mo est.) |
| SAIDI (All Events w/ MED) | 137.3 min/yr (2.29 hrs/yr) |
| SAIDI (Without Major Events) | 46.0 min/yr (Storm share: 66.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.11 /yr · 123.7 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Lafayette) |

## Which Peer Electric Utilities Operate in MS?

Compare City of Oxford - (MS) directly with City of Columbus - (MS) and nearby Mississippi electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Columbus - (MS)**](https://epri-peac.com/utilities/ms-city-of-columbus-ms-4068/) | 12.84 c | 164.6 min | 0 | 8,852 |
| [**City of New Albany - (MS)**](https://epri-peac.com/utilities/ms-city-of-new-albany-ms-13412/) | 13.24 c | — | 0 | 8,170 |
| [**City of Holly Springs**](https://epri-peac.com/utilities/ms-city-of-holly-springs-8748/) | 12.56 c | — | 0 | 9,398 |
| [**Yazoo Valley Elec Power Assn**](https://epri-peac.com/utilities/ms-yazoo-valley-elec-power-assn-21114/) | 16.33 c | — | 0 | 9,475 |

What to Check & Best-Fit Scenarios

## What Should City of Oxford - (MS) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Oxford - (MS) (Municipal, MS) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Oxford - (MS)'s 12.23 c/kWh blended residential rate in MS does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Oxford - (MS) system-wide SAIDI averages rural and urban circuits across its MS territory or nearby City of Columbus - (MS).

### City of Oxford - (MS) Solar & Battery Evaluators

Compare your actual City of Oxford - (MS) monthly kWh statement against 12.23 c/kWh and verify current export tariffs in MS.

### City of Oxford - (MS) Outage & Generator Planners

Use City of Oxford - (MS)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Oxford - (MS) (Mississippi) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Oxford - (MS)'s residential electricity rate and 2026 solar payback?

City of Oxford - (MS) averages 12.23 c/kWh (-1.80 c/kWh vs Mississippi average vs. Mississippi). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,321/yr (17.9-year payback).

### How reliable is City of Oxford - (MS) compared to peer Mississippi utilities?

City of Oxford - (MS) recorded 137.3 SAIDI outage minutes (2.29 hrs/yr, rank #312 of 751 reporting utilities); compare rates and outage history directly with City of Columbus - (MS) (12.84 c/kWh) across Mississippi.

### Which counties and customers does City of Oxford - (MS) serve in Mississippi?

EIA-861 filings list 8,620 customers across 1 county including Lafayette, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Oxford - (MS).

## Related Pages

Explore Mississippi energy benchmarks, City of Columbus - (MS), county outage profiles, and NEC 705.12 tools alongside City of Oxford - (MS).

[Mississippi State Energy Rates & Utilities](https://epri-peac.com/states/mississippi/) [All Mississippi County Power & Outage Profiles](https://epri-peac.com/counties/mississippi/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.23 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)