title: "City of Columbus - (MS) (MS) Rate & SAIDI"
url: https://epri-peac.com/utilities/ms-city-of-columbus-ms-4068/
description: "2025 EIA-861 profile for City of Columbus - (MS) (MS): 12.84 c/kWh rate, SAIDI 164.6 min/yr, 2025 rate & service profile. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Columbus - (MS) (MS) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Columbus - (MS) (EIA ID 4068, MS) serves 8,852 customers at 12.84 c/kWh (-1.19 c/kWh vs Mississippi average) with 164.6 min/yr SAIDI (2.74 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4068

- **Res. Rate** : 12.84 c/kWh

- **SAIDI (All Events)** : 164.6 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Columbus - (MS) Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.84 c/kWh), and outage history inside City of Columbus - (MS) territory. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Evaluating solar or generator backup under City of Columbus - (MS) (Mississippi) starts with its 12.84 c/kWh residential baseline (-1.19 c/kWh vs Mississippi average) and 17.0-year 8 kW cash payback. EIA-861 records show City of Columbus - (MS) recorded 164.6 SAIDI outage minutes (2.74 hrs/yr, rank #353 of 751 reporting utilities) across 8,852 accounts.

## Where Does City of Columbus - (MS) Sit Across US Utility Rates?

Benchmarking City of Columbus - (MS)'s 12.84 c/kWh residential rate against 1,989 EIA-861 utilities. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## How Does City of Columbus - (MS) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Columbus - (MS) across Mississippi utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## What Do EIA-861 Benchmarks Show for City of Columbus - (MS)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Columbus - (MS) in 2025.

Lowest Rate #602 / 1,989

### 12.84 c/kWh (-1.19 vs MS)

Commercial avg: 12.41 c/kWh; Industrial: 5.13 c/kWh; est. residential bill $143.94/mo.

Reliability #353 / 751

### 164.6 min/yr (2.74 hrs)

79.5% (130.9 min) from Major Event Days; avg restore 168.4 min (~5.1 kWh @ 1.8 kW).

Post-25D Payback

### 17.0 Years @ 12.84 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,387/yr at 1,350 kWh/kW.

Service Territory

### 8,852 Customers · 1 County

Serves 1 county including Lowndes in Mississippi; state FEMA declarations (2015-2026): 34.

City of Columbus - (MS) Reliability & Solar Offset Calculation

Backup_Energy = (168.4 min / 60) * 1.8 kW = 5.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1284 = $1,387/yr

EIA-861 2025 Utility ID 4068: Rate=12.84 c/kWh, Cust=8,852, SAIDI=164.6 min.

**Result:** 2.74 outage hrs/yr; 17.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Columbus - (MS)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 4068. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for City of Columbus - (MS) (Utility ID 4068).

| EIA Utility ID & BA Code | ID 4068 · TVA |
|---|---|
| State & Ownership Type | MS · Municipal |
| Retail Electricity Rates | 12.84 c/kWh Res · 12.41 c Comm · 5.13 c Ind |
| Avg Monthly Usage & Bill | 1,120.8 kWh/mo ($143.94/mo est.) |
| SAIDI (All Events w/ MED) | 164.6 min/yr (2.74 hrs/yr) |
| SAIDI (Without Major Events) | 33.7 min/yr (Storm share: 79.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.977 /yr · 168.4 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Lowndes) |

## Which Peer Electric Utilities Operate in MS?

Benchmark City of Columbus - (MS) directly against City of Oxford - (MS) and peer Mississippi retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Oxford - (MS)**](https://epri-peac.com/utilities/ms-city-of-oxford-ms-14275/) | 12.23 c | 137.3 min | 0 | 8,620 |
| [**City of Holly Springs**](https://epri-peac.com/utilities/ms-city-of-holly-springs-8748/) | 12.56 c | — | 0 | 9,398 |
| [**Yazoo Valley Elec Power Assn**](https://epri-peac.com/utilities/ms-yazoo-valley-elec-power-assn-21114/) | 16.33 c | — | 0 | 9,475 |
| [**City of New Albany - (MS)**](https://epri-peac.com/utilities/ms-city-of-new-albany-ms-13412/) | 13.24 c | — | 0 | 8,170 |

What to Check & Best-Fit Scenarios

## What Should City of Columbus - (MS) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Columbus - (MS) (Municipal, MS) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Columbus - (MS) acts as a wires-only TDU or bundled utility in MS.
- Transformer limits: City of Columbus - (MS) interconnection engineering still checks neighborhood transformer kVA regardless of 164.6 SAIDI.

### City of Columbus - (MS) Solar & Battery Evaluators

Compare your actual City of Columbus - (MS) monthly kWh statement against 12.84 c/kWh and verify current export tariffs in MS.

### City of Columbus - (MS) Outage & Generator Planners

Use City of Columbus - (MS)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Columbus - (MS) (Mississippi) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Columbus - (MS)'s residential electricity rate and 2026 solar payback?

City of Columbus - (MS) averages 12.84 c/kWh (-1.19 c/kWh vs Mississippi average vs. Mississippi). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,387/yr (17.0-year payback).

### How reliable is City of Columbus - (MS) compared to peer Mississippi utilities?

City of Columbus - (MS) recorded 164.6 SAIDI outage minutes (2.74 hrs/yr, rank #353 of 751 reporting utilities); compare rates and outage history directly with City of Oxford - (MS) (12.23 c/kWh) across Mississippi.

### Which counties and customers does City of Columbus - (MS) serve in Mississippi?

EIA-861 filings list 8,852 customers across 1 county including Lowndes, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Columbus - (MS).

## Related Pages

Explore Mississippi energy benchmarks, City of Oxford - (MS), county outage profiles, and NEC 705.12 tools alongside City of Columbus - (MS).

[Mississippi State Energy Rates & Utilities](https://epri-peac.com/states/mississippi/) [All Mississippi County Power & Outage Profiles](https://epri-peac.com/counties/mississippi/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.84 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)