title: "City of Aberdeen - (MS) (MS) Rate & SAIDI"
url: https://epri-peac.com/utilities/ms-city-of-aberdeen-ms-55/
description: "2025 EIA-861 profile for City of Aberdeen - (MS) (MS): 13.19 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Aberdeen - (MS) (MS) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Aberdeen - (MS) (EIA ID 55, MS) serves 2,577 customers at 13.19 c/kWh (-0.84 c/kWh vs Mississippi average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 55

- **Res. Rate** : 13.19 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Aberdeen - (MS) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.19 c/kWh), and outage history inside City of Aberdeen - (MS) territory. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Evaluating solar or generator backup under City of Aberdeen - (MS) (Mississippi) starts with its 13.19 c/kWh residential baseline (-0.84 c/kWh vs Mississippi average) and 16.6-year 8 kW cash payback. EIA-861 records show City of Aberdeen - (MS) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr) across 2,577 accounts.

## Where Does City of Aberdeen - (MS) Sit Across US Utility Rates?

Benchmarking City of Aberdeen - (MS)'s 13.19 c/kWh residential rate against 1,989 EIA-861 utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## How Does City of Aberdeen - (MS) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Aberdeen - (MS) across Mississippi utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for City of Aberdeen - (MS)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Aberdeen - (MS) in 2025.

Lowest Rate #720 / 1,989

### 13.19 c/kWh (-0.84 vs MS)

Commercial avg: 12.62 c/kWh; Industrial: 6.32 c/kWh; est. residential bill $136.33/mo.

State Reliability Context

### 524.4 min/yr (MS Avg)

Utility did not file separate IEEE SAIDI in 2025; Mississippi customer-weighted SAIDI is 524.4 min/yr.

Post-25D Payback

### 16.6 Years @ 13.19 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,425/yr at 1,350 kWh/kW.

Service Territory

### 2,577 Customers · 1 County

Serves 1 county including Monroe in Mississippi; state FEMA declarations (2015-2026): 34.

City of Aberdeen - (MS) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1319 = $1,425/yr

EIA-861 2025 Utility ID 55: Rate=13.19 c/kWh, Cust=2,577.

**Result:** 16.6 yr 8 kW cash payback at 13.19 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Aberdeen - (MS)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 55. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Aberdeen - (MS) (Utility ID 55).

| EIA Utility ID & BA Code | ID 55 · TVA |
|---|---|
| State & Ownership Type | MS · Municipal |
| Retail Electricity Rates | 13.19 c/kWh Res · 12.62 c Comm · 6.32 c Ind |
| Avg Monthly Usage & Bill | 1,033.7 kWh/mo ($136.33/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Monroe) |

## Which Peer Electric Utilities Operate in MS?

Benchmark City of Aberdeen - (MS) directly against City of Philadelphia - (MS) and peer Mississippi retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Philadelphia - (MS)**](https://epri-peac.com/utilities/ms-city-of-philadelphia-ms-14947/) | 12.57 c | — | 0 | 2,669 |
| [**Louisville Electric System**](https://epri-peac.com/utilities/ms-louisville-electric-system-11247/) | 11.5 c | — | 0 | 2,447 |
| [**City of Amory**](https://epri-peac.com/utilities/ms-city-of-amory-571/) | 12.31 c | — | 0 | 2,836 |
| [**City of West Point - (MS)**](https://epri-peac.com/utilities/ms-city-of-west-point-ms-20394/) | 12.88 c | — | 0 | 2,987 |

What to Check & Best-Fit Scenarios

## What Should City of Aberdeen - (MS) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Aberdeen - (MS) (Municipal, MS) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Aberdeen - (MS) acts as a wires-only TDU or bundled utility in MS.
- Transformer limits: City of Aberdeen - (MS) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Aberdeen - (MS) Solar & Battery Evaluators

Compare your actual City of Aberdeen - (MS) monthly kWh statement against 13.19 c/kWh and verify current export tariffs in MS.

### City of Aberdeen - (MS) Outage & Generator Planners

Use City of Aberdeen - (MS)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Aberdeen - (MS) (Mississippi) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Aberdeen - (MS)'s residential electricity rate and 2026 solar payback?

City of Aberdeen - (MS) averages 13.19 c/kWh (-0.84 c/kWh vs Mississippi average vs. Mississippi). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,425/yr (16.6-year payback).

### How reliable is City of Aberdeen - (MS) compared to peer Mississippi utilities?

City of Aberdeen - (MS) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 524.4 min/yr); compare rates and outage history directly with City of Philadelphia - (MS) (12.57 c/kWh) across Mississippi.

### Which counties and customers does City of Aberdeen - (MS) serve in Mississippi?

EIA-861 filings list 2,577 customers across 1 county including Monroe, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Aberdeen - (MS).

## Related Pages

Explore Mississippi energy benchmarks, City of Philadelphia - (MS), county outage profiles, and NEC 705.12 tools alongside City of Aberdeen - (MS).

[Mississippi State Energy Rates & Utilities](https://epri-peac.com/states/mississippi/) [All Mississippi County Power & Outage Profiles](https://epri-peac.com/counties/mississippi/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.19 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)