description: "2025 EIA-861 profile for Platte-Clay Electric Coop, Inc (MO): 12.9 c/kWh rate, SAIDI 79.0 min/yr, 418 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Platte-Clay Electric Coop, Inc (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Platte-Clay Electric Coop, Inc (EIA ID 15138, MO) serves 23,816 customers at 12.9 c/kWh (-0.40 c/kWh vs Missouri average) with 79.0 min/yr SAIDI (1.32 hrs/yr) with 418 net-metered residential solar systems (1.76% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 15138

- **Res. Rate** : 12.9 c/kWh

- **SAIDI (All Events)** : 79.0 min/yr

- **Net-Metered PV** : 418 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Platte-Clay Electric Coop, Inc Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.9 c/kWh), and outage history inside Platte-Clay Electric Coop, Inc territory. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Evaluating solar or generator backup under Platte-Clay Electric Coop, Inc (Missouri) starts with its 12.9 c/kWh residential baseline (-0.40 c/kWh vs Missouri average) and 16.9-year 8 kW cash payback. EIA-861 records show Platte-Clay Electric Coop, Inc recorded 79.0 SAIDI outage minutes (1.32 hrs/yr, rank #181 of 751 reporting utilities) across 23,816 accounts.

## Where Does Platte-Clay Electric Coop, Inc Sit Across US Utility Rates?

Benchmarking Platte-Clay Electric Coop, Inc's 12.9 c/kWh residential rate against 1,989 EIA-861 utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does Platte-Clay Electric Coop, Inc Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Platte-Clay Electric Coop, Inc across Missouri utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## What Do EIA-861 Benchmarks Show for Platte-Clay Electric Coop, Inc?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Platte-Clay Electric Coop, Inc in 2025.

Lowest Rate #622 / 1,989

### 12.9 c/kWh (-0.40 vs MO)

Commercial avg: 8.85 c/kWh; Industrial: 12.92 c/kWh; est. residential bill $171.95/mo.

Reliability #181 / 751

### 79.0 min/yr (1.32 hrs)

25.6% (20.2 min) from Major Event Days; avg restore 74.1 min (~2.2 kWh @ 1.8 kW).

Post-25D Payback

### 16.9 Years @ 12.9 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,393/yr at 1,350 kWh/kW.

Distributed PV

### 418 Net-Metered Systems

4.625 MW residential PV (1.76% of customers) across 7 counties; state FEMA declarations (2015-2026): 23.

Platte-Clay Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (74.1 min / 60) * 1.8 kW = 2.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1290 = $1,393/yr

EIA-861 2025 Utility ID 15138: Rate=12.9 c/kWh, Cust=23,816, SAIDI=79.0 min, PV=418.

**Result:** 1.32 outage hrs/yr; 16.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Platte-Clay Electric Coop, Inc?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 15138. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for Platte-Clay Electric Coop, Inc (Utility ID 15138).

| EIA Utility ID & BA Code | ID 15138 · AECI |
|---|---|
| State & Ownership Type | MO · Cooperative |
| Retail Electricity Rates | 12.9 c/kWh Res · 8.85 c Comm · 12.92 c Ind |
| Avg Monthly Usage & Bill | 1,332.8 kWh/mo ($171.95/mo est.) |
| SAIDI (All Events w/ MED) | 79.0 min/yr (1.32 hrs/yr) |
| SAIDI (Without Major Events) | 58.8 min/yr (Storm share: 25.6%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.066 /yr · 74.1 min restore |
| Residential Net-Metered PV | 418 systems (4.625 MW) |
| Counties Served (Sample) | 7 counties (Buchanan, Caldwell, Clay, Clinton, DeKalb, Platte, Ray) |

## Which Peer Electric Utilities Operate in MO?

Benchmark Platte-Clay Electric Coop, Inc directly against Howell-Oregon Elec Coop, Inc and peer Missouri retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Howell-Oregon Elec Coop, Inc**](https://epri-peac.com/utilities/mo-howell-oregon-elec-coop-inc-8934/) | 13.12 c | — | 220 | 23,203 |
| [**Three Rivers Electric Coop**](https://epri-peac.com/utilities/mo-three-rivers-electric-coop-16751/) | 13.03 c | 130.0 min | 158 | 22,757 |
| [**Citizens Electric Corporation - (MO)**](https://epri-peac.com/utilities/mo-citizens-electric-corporation-mo-3600/) | 15.24 c | 1,687.6 min | 279 | 24,997 |
| [**Black River Electric Coop - (MO)**](https://epri-peac.com/utilities/mo-black-river-electric-coop-mo-1775/) | 13.61 c | 2,908.5 min | 103 | 21,606 |

What to Check & Best-Fit Scenarios

## What Should Platte-Clay Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Platte-Clay Electric Coop, Inc (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Platte-Clay Electric Coop, Inc (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in MO.
- Export credit rules: check Platte-Clay Electric Coop, Inc's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Platte-Clay Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Platte-Clay Electric Coop, Inc monthly kWh statement against 12.9 c/kWh and verify current export tariffs in MO.

### Platte-Clay Electric Coop, Inc Outage & Generator Planners

Use Platte-Clay Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Platte-Clay Electric Coop, Inc (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Platte-Clay Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Platte-Clay Electric Coop, Inc averages 12.9 c/kWh (-0.40 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,393/yr (16.9-year payback).

### How reliable is Platte-Clay Electric Coop, Inc compared to peer Missouri utilities?

Platte-Clay Electric Coop, Inc recorded 79.0 SAIDI outage minutes (1.32 hrs/yr, rank #181 of 751 reporting utilities); compare rates and outage history directly with Howell-Oregon Elec Coop, Inc (13.12 c/kWh) across Missouri.

### Which counties and customers does Platte-Clay Electric Coop, Inc serve in Missouri?

EIA-861 filings list 23,816 customers across 7 counties including Buchanan, Caldwell, Clay, with 418 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Platte-Clay Electric Coop, Inc.

## Related Pages

Explore Missouri energy benchmarks, Howell-Oregon Elec Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Platte-Clay Electric Coop, Inc.

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.9 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)