# Ozark Border Electric Coop (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Ozark Border Electric Coop (EIA ID 14285, MO) serves 33,262 customers at 12.28 c/kWh (-1.02 c/kWh vs Missouri average) with no standalone IEEE SAIDI filing (11 counties served) with 122 net-metered residential solar systems (0.37% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14285

- **Res. Rate** : 12.28 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 122 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Ozark Border Electric Coop Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.28 c/kWh), and outage history inside Ozark Border Electric Coop territory. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Homeowners inside Ozark Border Electric Coop's Missouri footprint (11 counties including Bollinger, Butler, Carter) face 12.28 c/kWh benchmark pricing (-6.26 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 17.8 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr).

## Where Does Ozark Border Electric Coop Sit Across US Utility Rates?

Benchmarking Ozark Border Electric Coop's 12.28 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does Ozark Border Electric Coop Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Ozark Border Electric Coop across Missouri utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Ozark Border Electric Coop?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Ozark Border Electric Coop in 2025.

Lowest Rate #455 / 1,989

### 12.28 c/kWh (-1.02 vs MO)

Commercial avg: 11.37 c/kWh; Industrial: 9.53 c/kWh; est. residential bill $167.01/mo.

State Reliability Context

### 466.0 min/yr (MO Avg)

Utility did not file separate IEEE SAIDI in 2025; Missouri customer-weighted SAIDI is 466.0 min/yr.

Post-25D Payback

### 17.8 Years @ 12.28 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,326/yr at 1,350 kWh/kW.

Distributed PV

### 122 Net-Metered Systems

1.71 MW residential PV (0.37% of customers) across 11 counties; state FEMA declarations (2015-2026): 23.

Ozark Border Electric Coop Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1228 = $1,326/yr

EIA-861 2025 Utility ID 14285: Rate=12.28 c/kWh, Cust=33,262, PV=122.

**Result:** 17.8 yr 8 kW cash payback at 12.28 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Ozark Border Electric Coop?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 14285. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for Ozark Border Electric Coop (Utility ID 14285).

| EIA Utility ID & BA Code | ID 14285 · AECI |
|---|---|
| State & Ownership Type | MO · Cooperative |
| Retail Electricity Rates | 12.28 c/kWh Res · 11.37 c Comm · 9.53 c Ind |
| Avg Monthly Usage & Bill | 1,359.6 kWh/mo ($167.01/mo est.) |
| Residential Net-Metered PV | 122 systems (1.71 MW) |
| Counties Served (Sample) | 11 counties (Bollinger, Butler, Carter, Dunklin, New Madrid, Oregon, Reynolds, Ripley, Shannon, Stoddard) |

## Which Peer Electric Utilities Operate in MO?

Benchmark Ozark Border Electric Coop directly against Boone Electric Coop and peer Missouri retail electric power providers. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Boone Electric Coop**](https://epri-peac.com/utilities/mo-boone-electric-coop-2001/) | 13.57 c | 66.9 min | 386 | 34,098 |
| [**Ozark Electric Coop Inc - (MO)**](https://epri-peac.com/utilities/mo-ozark-electric-coop-inc-mo-14288/) | 15.64 c | — | 610 | 31,915 |
| [**Co-Mo Electric Coop Inc**](https://epri-peac.com/utilities/mo-co-mo-electric-coop-inc-4063/) | 14.93 c | 158.1 min | 243 | 31,352 |
| [**Laclede Electric Coop, Inc**](https://epri-peac.com/utilities/mo-laclede-electric-coop-inc-10603/) | 12.39 c | 155.4 min | 301 | 35,275 |

What to Check & Best-Fit Scenarios

## What Should Ozark Border Electric Coop Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Ozark Border Electric Coop (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Ozark Border Electric Coop (MO) shift real bills away from 12.28 c/kWh.
- Outage clustering: Major Event Days skew Ozark Border Electric Coop annual minutes differently than routine non-storm reliability.

### Ozark Border Electric Coop Solar & Battery Evaluators

Compare your actual Ozark Border Electric Coop monthly kWh statement against 12.28 c/kWh and verify current export tariffs in MO.

### Ozark Border Electric Coop Outage & Generator Planners

Use Ozark Border Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Ozark Border Electric Coop (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Ozark Border Electric Coop's residential electricity rate and 2026 solar payback?

Ozark Border Electric Coop averages 12.28 c/kWh (-1.02 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,326/yr (17.8-year payback).

### How reliable is Ozark Border Electric Coop compared to peer Missouri utilities?

Ozark Border Electric Coop did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr); compare rates and outage history directly with Boone Electric Coop (13.57 c/kWh) across Missouri.

### Which counties and customers does Ozark Border Electric Coop serve in Missouri?

EIA-861 filings list 33,262 customers across 11 counties including Bollinger, Butler, Carter, with 122 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Ozark Border Electric Coop.

## Related Pages

Explore Missouri energy benchmarks, Boone Electric Coop, county outage profiles, and NEC 705.12 tools alongside Ozark Border Electric Coop.

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.28 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)