EIA-861 Grid Reliability & Net Metering

# Laclede Electric Coop, Inc (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Laclede Electric Coop, Inc (EIA ID 10603, MO) serves 35,275 customers at 12.39 c/kWh (-0.91 c/kWh vs Missouri average) with 155.4 min/yr SAIDI (2.59 hrs/yr) with 301 net-metered residential solar systems (0.85% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 10603

- **Res. Rate** : 12.39 c/kWh

- **SAIDI (All Events)** : 155.4 min/yr

- **Net-Metered PV** : 301 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Laclede Electric Coop, Inc Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.39 c/kWh), and outage history inside Laclede Electric Coop, Inc territory. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Evaluating solar or generator backup under Laclede Electric Coop, Inc (Missouri) starts with its 12.39 c/kWh residential baseline (-0.91 c/kWh vs Missouri average) and 17.6-year 8 kW cash payback. EIA-861 records show Laclede Electric Coop, Inc recorded 155.4 SAIDI outage minutes (2.59 hrs/yr, rank #341 of 751 reporting utilities) across 35,275 accounts.

## Where Does Laclede Electric Coop, Inc Sit Across US Utility Rates?

Benchmarking Laclede Electric Coop, Inc's 12.39 c/kWh residential rate against 1,989 EIA-861 utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does Laclede Electric Coop, Inc Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Laclede Electric Coop, Inc across Missouri utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Laclede Electric Coop, Inc?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Laclede Electric Coop, Inc in 2025.

Lowest Rate #487 / 1,989

### 12.39 c/kWh (-0.91 vs MO)

Commercial avg: 12.37 c/kWh; Industrial: 10.66 c/kWh; est. residential bill $158.48/mo.

Reliability #341 / 751

### 155.4 min/yr (2.59 hrs)

20.8% (32.3 min) from Major Event Days; avg restore 75.1 min (~2.3 kWh @ 1.8 kW).

Post-25D Payback

### 17.6 Years @ 12.39 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,338/yr at 1,350 kWh/kW.

Distributed PV

### 301 Net-Metered Systems

3.045 MW residential PV (0.85% of customers) across 6 counties; state FEMA declarations (2015-2026): 23.

Laclede Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (75.1 min / 60) * 1.8 kW = 2.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1239 = $1,338/yr

EIA-861 2025 Utility ID 10603: Rate=12.39 c/kWh, Cust=35,275, SAIDI=155.4 min, PV=301.

**Result:** 2.59 outage hrs/yr; 17.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Laclede Electric Coop, Inc?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 10603. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for Laclede Electric Coop, Inc (Utility ID 10603).

| EIA Utility ID & BA Code | ID 10603 · AECI |
|---|---|
| State & Ownership Type | MO · Cooperative |
| Retail Electricity Rates | 12.39 c/kWh Res · 12.37 c Comm · 10.66 c Ind |
| Avg Monthly Usage & Bill | 1,278.9 kWh/mo ($158.48/mo est.) |
| SAIDI (All Events w/ MED) | 155.4 min/yr (2.59 hrs/yr) |
| SAIDI (Without Major Events) | 123.1 min/yr (Storm share: 20.8%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.07 /yr · 75.1 min restore |
| Residential Net-Metered PV | 301 systems (3.045 MW) |
| Counties Served (Sample) | 6 counties (Camden, Dallas, Laclede, Pulaski, Webster, Wright) |

## Which Peer Electric Utilities Operate in MO?

Benchmark Laclede Electric Coop, Inc directly against Boone Electric Coop and peer Missouri retail electric power providers. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Boone Electric Coop**](https://epri-peac.com/utilities/mo-boone-electric-coop-2001/) | 13.57 c | 66.9 min | 386 | 34,098 |
| [**Ozark Border Electric Coop**](https://epri-peac.com/utilities/mo-ozark-border-electric-coop-14285/) | 12.28 c | — | 122 | 33,262 |
| [**Ozark Electric Coop Inc - (MO)**](https://epri-peac.com/utilities/mo-ozark-electric-coop-inc-mo-14288/) | 15.64 c | — | 610 | 31,915 |
| [**Co-Mo Electric Coop Inc**](https://epri-peac.com/utilities/mo-co-mo-electric-coop-inc-4063/) | 14.93 c | 158.1 min | 243 | 31,352 |

What to Check & Best-Fit Scenarios

## What Should Laclede Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Laclede Electric Coop, Inc (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Laclede Electric Coop, Inc acts as a wires-only TDU or bundled utility in MO.
- Transformer limits: Laclede Electric Coop, Inc interconnection engineering still checks neighborhood transformer kVA regardless of 155.4 SAIDI.

### Laclede Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Laclede Electric Coop, Inc monthly kWh statement against 12.39 c/kWh and verify current export tariffs in MO.

### Laclede Electric Coop, Inc Outage & Generator Planners

Use Laclede Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Laclede Electric Coop, Inc (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Laclede Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Laclede Electric Coop, Inc averages 12.39 c/kWh (-0.91 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,338/yr (17.6-year payback).

### How reliable is Laclede Electric Coop, Inc compared to peer Missouri utilities?

Laclede Electric Coop, Inc recorded 155.4 SAIDI outage minutes (2.59 hrs/yr, rank #341 of 751 reporting utilities); compare rates and outage history directly with Boone Electric Coop (13.57 c/kWh) across Missouri.

### Which counties and customers does Laclede Electric Coop, Inc serve in Missouri?

EIA-861 filings list 35,275 customers across 6 counties including Camden, Dallas, Laclede, with 301 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Laclede Electric Coop, Inc.

## Related Pages

Explore Missouri energy benchmarks, Boone Electric Coop, county outage profiles, and NEC 705.12 tools alongside Laclede Electric Coop, Inc.

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.39 c/kWh rates.