---
title: "City of Sikeston - (MO) (MO) Rate & SAIDI"
url: https://epri-peac.com/utilities/mo-city-of-sikeston-mo-17177/
description: "2025 EIA-861 profile for City of Sikeston - (MO) (MO): 9.84 c/kWh rate, SAIDI Not reported in EIA-861, 32 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Sikeston - (MO) (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Sikeston - (MO) (EIA ID 17177, MO) serves 6,928 customers at 9.84 c/kWh (-3.46 c/kWh vs Missouri average) with no standalone IEEE SAIDI filing (2 counties served) with 32 net-metered residential solar systems (0.46% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 17177

- **Res. Rate** : 9.84 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 32 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Sikeston - (MO) Compare on Tariffs and Reliability?

Solar payback, residential tariff (9.84 c/kWh), and outage history inside City of Sikeston - (MO) territory. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Homeowners inside City of Sikeston - (MO)'s Missouri footprint (2 counties including New Madrid, Scott) face 9.84 c/kWh benchmark pricing (-8.70 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 22.2 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr).

## Where Does City of Sikeston - (MO) Sit Across US Utility Rates?

Benchmarking City of Sikeston - (MO)'s 9.84 c/kWh residential rate against 1,989 EIA-861 utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does City of Sikeston - (MO) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Sikeston - (MO) across Missouri utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## What Do EIA-861 Benchmarks Show for City of Sikeston - (MO)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Sikeston - (MO) in 2025.

Lowest Rate #124 / 1,989

### 9.84 c/kWh (-3.46 vs MO)

Commercial avg: 11.15 c/kWh; Industrial: 6.13 c/kWh; est. residential bill $139.95/mo.

State Reliability Context

### 466.0 min/yr (MO Avg)

Utility did not file separate IEEE SAIDI in 2025; Missouri customer-weighted SAIDI is 466.0 min/yr.

Post-25D Payback

### 22.2 Years @ 9.84 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,063/yr at 1,350 kWh/kW.

Distributed PV

### 32 Net-Metered Systems

0.289 MW residential PV (0.46% of customers) across 2 counties; state FEMA declarations (2015-2026): 23.

City of Sikeston - (MO) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0984 = $1,063/yr

EIA-861 2025 Utility ID 17177: Rate=9.84 c/kWh, Cust=6,928, PV=32.

**Result:** 22.2 yr 8 kW cash payback at 9.84 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Sikeston - (MO)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 17177. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Sikeston - (MO) (Utility ID 17177).

| EIA Utility ID & BA Code | ID 17177 · SPA |
|---|---|
| State & Ownership Type | MO · Municipal |
| Retail Electricity Rates | 9.84 c/kWh Res · 11.15 c Comm · 6.13 c Ind |
| Avg Monthly Usage & Bill | 1,422.4 kWh/mo ($139.95/mo est.) |
| Residential Net-Metered PV | 32 systems (0.289 MW) |
| Counties Served (Sample) | 2 counties (New Madrid, Scott) |

## Which Peer Electric Utilities Operate in MO?

Benchmark City of Sikeston - (MO) directly against City of Carthage - (MO) and peer Missouri retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Carthage - (MO)**](https://epri-peac.com/utilities/mo-city-of-carthage-mo-3113/) | 14.28 c | 321.4 min | 65 | 7,234 |
| [**City of Farmington - (MO)**](https://epri-peac.com/utilities/mo-city-of-farmington-mo-6205/) | 14.59 c | — | 20 | 7,396 |
| [**City of Hannibal - (MO)**](https://epri-peac.com/utilities/mo-city-of-hannibal-mo-8055/) | 14.03 c | 17.7 min | 20 | 7,673 |
| [**Consolidated Electric Coop**](https://epri-peac.com/utilities/mo-consolidated-electric-coop-4237/) | 13.54 c | 232.9 min | 70 | 7,698 |

What to Check & Best-Fit Scenarios

## What Should City of Sikeston - (MO) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Sikeston - (MO) (Municipal, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Sikeston - (MO) (MO) shift real bills away from 9.84 c/kWh.
- Outage clustering: Major Event Days skew City of Sikeston - (MO) annual minutes differently than routine non-storm reliability.

### City of Sikeston - (MO) Solar & Battery Evaluators

Compare your actual City of Sikeston - (MO) monthly kWh statement against 9.84 c/kWh and verify current export tariffs in MO.

### City of Sikeston - (MO) Outage & Generator Planners

Use City of Sikeston - (MO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Sikeston - (MO) (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Sikeston - (MO)'s residential electricity rate and 2026 solar payback?

City of Sikeston - (MO) averages 9.84 c/kWh (-3.46 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,063/yr (22.2-year payback).

### How reliable is City of Sikeston - (MO) compared to peer Missouri utilities?

City of Sikeston - (MO) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr); compare rates and outage history directly with City of Carthage - (MO) (14.28 c/kWh) across Missouri.

### Which counties and customers does City of Sikeston - (MO) serve in Missouri?

EIA-861 filings list 6,928 customers across 2 counties including New Madrid, Scott, with 32 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Sikeston - (MO).

## Related Pages

Explore Missouri energy benchmarks, City of Carthage - (MO), county outage profiles, and NEC 705.12 tools alongside City of Sikeston - (MO).

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.84 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
