EIA-861 Grid Reliability & Net Metering

# City of Monett - (MO) (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Monett - (MO) (EIA ID 12782, MO) serves 4,174 customers at 12.86 c/kWh (-0.44 c/kWh vs Missouri average) with 83.6 min/yr SAIDI (1.39 hrs/yr) with 34 net-metered residential solar systems (0.81% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 12782

- **Res. Rate** : 12.86 c/kWh

- **SAIDI (All Events)** : 83.6 min/yr

- **Net-Metered PV** : 34 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Monett - (MO) Compare on Tariffs and Reliability?

How City of Monett - (MO) (Municipal) performs across 2 counties on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Across 2 counties including Barry, Lawrence, City of Monett - (MO) offers a low 12.86 c/kWh residential rate (-5.68 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.0 years without federal 25D compared to peer Missouri Rural Electric Coop (14.24 c/kWh). With 4,174 customer accounts (Municipal), 2025 Form EIA-861 shows City of Monett - (MO) recorded 83.6 SAIDI outage minutes (1.39 hrs/yr, rank #189 of 751 reporting utilities), with 34 net-metered residential solar systems (0.81% customer adoption).

## Where Does City of Monett - (MO) Sit Across US Utility Rates?

National utility tariff curve marking City of Monett - (MO) at 12.86 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Monett - (MO) Rank Across Cost & Reliability?

Relative ranking of City of Monett - (MO) on residential electricity pricing and annual IEEE SAIDI outage duration. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## What Do EIA-861 Benchmarks Show for City of Monett - (MO)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Monett - (MO) in Missouri.

Lowest Rate #608 / 1,989

### 12.86 c/kWh (-0.44 vs MO)

Commercial avg: 11.64 c/kWh; Industrial: 10.21 c/kWh; est. residential bill $124.43/mo.

Reliability #189 / 751

### 83.6 min/yr (1.39 hrs)

45.0% (37.6 min) from Major Event Days; avg restore 95.9 min (~2.9 kWh @ 1.8 kW).

Post-25D Payback

### 17.0 Years @ 12.86 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,389/yr at 1,350 kWh/kW.

Distributed PV

### 34 Net-Metered Systems

0.319 MW residential PV (0.81% of customers) across 2 counties; state FEMA declarations (2015-2026): 23.

City of Monett - (MO) Reliability & Solar Offset Calculation

Backup_Energy = (95.9 min / 60) * 1.8 kW = 2.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1286 = $1,389/yr

EIA-861 2025 Utility ID 12782: Rate=12.86 c/kWh, Cust=4,174, SAIDI=83.6 min, PV=34.

**Result:** 1.39 outage hrs/yr; 17.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Monett - (MO)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Monett - (MO). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for City of Monett - (MO) (Utility ID 12782).

| EIA Utility ID & BA Code | ID 12782 · SWPP |
|---|---|
| State & Ownership Type | MO · Municipal |
| Retail Electricity Rates | 12.86 c/kWh Res · 11.64 c Comm · 10.21 c Ind |
| Avg Monthly Usage & Bill | 967.5 kWh/mo ($124.43/mo est.) |
| SAIDI (All Events w/ MED) | 83.6 min/yr (1.39 hrs/yr) |
| SAIDI (Without Major Events) | 46.0 min/yr (Storm share: 45.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.872 /yr · 95.9 min restore |
| Residential Net-Metered PV | 34 systems (0.319 MW) |
| Counties Served (Sample) | 2 counties (Barry, Lawrence) |

## Which Peer Electric Utilities Operate in MO?

Nearby Missouri electric utilities of comparable customer size led by Missouri Rural Electric Coop (14.24 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Missouri Rural Electric Coop**](https://epri-peac.com/utilities/mo-missouri-rural-electric-coop-12700/) | 14.24 c | — | 11 | 5,077 |
| [**City of Lebanon - (MO)**](https://epri-peac.com/utilities/mo-city-of-lebanon-mo-10832/) | 10.25 c | — | 14 | 6,078 |
| [**City of Sikeston - (MO)**](https://epri-peac.com/utilities/mo-city-of-sikeston-mo-17177/) | 9.84 c | — | 32 | 6,928 |
| [**City of Carthage - (MO)**](https://epri-peac.com/utilities/mo-city-of-carthage-mo-3113/) | 14.28 c | 321.4 min | 65 | 7,234 |

What to Check & Best-Fit Scenarios

## What Should City of Monett - (MO) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Monett - (MO) (Municipal, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Monett - (MO) (MO) shift real bills away from 12.86 c/kWh.
- Outage clustering: Major Event Days skew City of Monett - (MO) annual minutes differently than routine non-storm reliability.

### City of Monett - (MO) Solar & Battery Evaluators

Compare your actual City of Monett - (MO) monthly kWh statement against 12.86 c/kWh and verify current export tariffs in MO.

### City of Monett - (MO) Outage & Generator Planners

Use City of Monett - (MO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Monett - (MO) (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Monett - (MO)'s residential electricity rate and 2026 solar payback?

City of Monett - (MO) averages 12.86 c/kWh (-0.44 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,389/yr (17.0-year payback).

### How reliable is City of Monett - (MO) compared to peer Missouri utilities?

City of Monett - (MO) recorded 83.6 SAIDI outage minutes (1.39 hrs/yr, rank #189 of 751 reporting utilities); compare rates and outage history directly with Missouri Rural Electric Coop (14.24 c/kWh) across Missouri.

### Which counties and customers does City of Monett - (MO) serve in Missouri?

EIA-861 filings list 4,174 customers across 2 counties including Barry, Lawrence, with 34 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Monett - (MO).

## Related Pages

Explore Missouri energy benchmarks, Missouri Rural Electric Coop, county outage profiles, and NEC 705.12 tools alongside City of Monett - (MO).

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.86 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)