---
title: "City of Farmington - (MO) (MO) Rate & SAIDI"
url: https://epri-peac.com/utilities/mo-city-of-farmington-mo-6205/
description: "2025 EIA-861 profile for City of Farmington - (MO) (MO): 14.59 c/kWh rate, SAIDI Not reported in EIA-861, 20 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Farmington - (MO) (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Farmington - (MO) (EIA ID 6205, MO) serves 7,396 customers at 14.59 c/kWh (+1.29 c/kWh vs Missouri average) with no standalone IEEE SAIDI filing (1 county served) with 20 net-metered residential solar systems (0.27% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6205

- **Res. Rate** : 14.59 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 20 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Farmington - (MO) Compare on Tariffs and Reliability?

EIA-861 rate delta (+1.29 c/kWh vs Missouri average), customer scale (7,396), and 2026 solar payback benchmarks for City of Farmington - (MO).

Ranked #1,117 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 43.7% of peers), City of Farmington - (MO) serves 7,396 accounts in Missouri (Municipal). Commercial power averages 14.36 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr), with 20 net-metered residential solar systems (0.27% customer adoption).

## Where Does City of Farmington - (MO) Sit Across US Utility Rates?

Positions City of Farmington - (MO) (14.59 c/kWh) across 1,989 US electric utility residential tariffs. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does City of Farmington - (MO) Rank Across Cost & Reliability?

Percentile placement of City of Farmington - (MO) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Farmington - (MO)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Farmington - (MO) (Municipal) in Missouri. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Lowest Rate #1,117 / 1,989

### 14.59 c/kWh (+1.29 vs MO)

Commercial avg: 14.36 c/kWh; Industrial: 10.93 c/kWh; est. residential bill $130.15/mo.

State Reliability Context

### 466.0 min/yr (MO Avg)

Utility did not file separate IEEE SAIDI in 2025; Missouri customer-weighted SAIDI is 466.0 min/yr.

Post-25D Payback

### 15.0 Years @ 14.59 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,576/yr at 1,350 kWh/kW.

Distributed PV

### 20 Net-Metered Systems

0.197 MW residential PV (0.27% of customers) across 1 county; state FEMA declarations (2015-2026): 23.

City of Farmington - (MO) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1459 = $1,576/yr

EIA-861 2025 Utility ID 6205: Rate=14.59 c/kWh, Cust=7,396, PV=20.

**Result:** 15.0 yr 8 kW cash payback at 14.59 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Farmington - (MO)?

Complete Form EIA-861 filing summary for City of Farmington - (MO) (ID 6205) covering sales, PV, and counties. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Farmington - (MO) (Utility ID 6205).

| EIA Utility ID & BA Code | ID 6205 · MISO |
|---|---|
| State & Ownership Type | MO · Municipal |
| Retail Electricity Rates | 14.59 c/kWh Res · 14.36 c Comm · 10.93 c Ind |
| Avg Monthly Usage & Bill | 891.9 kWh/mo ($130.15/mo est.) |
| Residential Net-Metered PV | 20 systems (0.197 MW) |
| Counties Served (Sample) | 1 county (St Francois) |

## Which Peer Electric Utilities Operate in MO?

Compare City of Farmington - (MO) directly with City of Carthage - (MO) and nearby Missouri electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Carthage - (MO)**](https://epri-peac.com/utilities/mo-city-of-carthage-mo-3113/) | 14.28 c | 321.4 min | 65 | 7,234 |
| [**City of Hannibal - (MO)**](https://epri-peac.com/utilities/mo-city-of-hannibal-mo-8055/) | 14.03 c | 17.7 min | 20 | 7,673 |
| [**Consolidated Electric Coop**](https://epri-peac.com/utilities/mo-consolidated-electric-coop-4237/) | 13.54 c | 232.9 min | 70 | 7,698 |
| [**City of Poplar Bluff - (MO)**](https://epri-peac.com/utilities/mo-city-of-poplar-bluff-mo-15229/) | 11.06 c | — | 19 | 7,710 |

What to Check & Best-Fit Scenarios

## What Should City of Farmington - (MO) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Farmington - (MO) (Municipal, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Farmington - (MO) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in MO.
- Export credit rules: check City of Farmington - (MO)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Farmington - (MO) Solar & Battery Evaluators

Compare your actual City of Farmington - (MO) monthly kWh statement against 14.59 c/kWh and verify current export tariffs in MO.

### City of Farmington - (MO) Outage & Generator Planners

Use City of Farmington - (MO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Farmington - (MO) (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Farmington - (MO)'s residential electricity rate and 2026 solar payback?

City of Farmington - (MO) averages 14.59 c/kWh (+1.29 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,576/yr (15.0-year payback).

### How reliable is City of Farmington - (MO) compared to peer Missouri utilities?

City of Farmington - (MO) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 466.0 min/yr); compare rates and outage history directly with City of Carthage - (MO) (14.28 c/kWh) across Missouri.

### Which counties and customers does City of Farmington - (MO) serve in Missouri?

EIA-861 filings list 7,396 customers across 1 county including St Francois, with 20 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Farmington - (MO).

## Related Pages

Explore Missouri energy benchmarks, City of Carthage - (MO), county outage profiles, and NEC 705.12 tools alongside City of Farmington - (MO).

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.59 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
