EIA-861 Grid Reliability & Net Metering

# Black River Electric Coop - (MO) (MO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Black River Electric Coop - (MO) (EIA ID 1775, MO) serves 21,606 customers at 13.61 c/kWh (+0.31 c/kWh vs Missouri average) with 2,908.5 min/yr SAIDI (48.48 hrs/yr) with 103 net-metered residential solar systems (0.48% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 1775

- **Res. Rate** : 13.61 c/kWh

- **SAIDI (All Events)** : 2,908.5 min/yr

- **Net-Metered PV** : 103 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Black River Electric Coop - (MO) Compare on Tariffs and Reliability?

How Black River Electric Coop - (MO) (Cooperative) performs across 8 counties on kWh rates and outage resilience. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Black River Electric Coop - (MO) (Cooperative) logged 2,908.5 SAIDI outage minutes (48.48 hrs/yr, 80.6% storm-driven), making battery backup or a standby ATS worthwhile. Typical residential meters drew 1,151.2 kWh/mo ($156.70/mo) in 2025, while its tariff bills residential power at 13.61 c/kWh (+0.31 c/kWh vs Missouri average vs. Missouri), offsetting ~$1,470/yr on an 8 kW array—compare rates directly with Three Rivers Electric Coop (13.03 c/kWh).

## Where Does Black River Electric Coop - (MO) Sit Across US Utility Rates?

National utility tariff curve marking Black River Electric Coop - (MO) at 13.61 c/kWh vs. 18.54 c/kWh US mean.

## How Does Black River Electric Coop - (MO) Rank Across Cost & Reliability?

Relative ranking of Black River Electric Coop - (MO) on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Black River Electric Coop - (MO)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Black River Electric Coop - (MO) in Missouri.

Lowest Rate #851 / 1,989

### 13.61 c/kWh (+0.31 vs MO)

Commercial avg: 12.17 c/kWh; Industrial: 8.35 c/kWh; est. residential bill $156.70/mo.

Reliability #748 / 751

### 2,908.5 min/yr (48.48 hrs)

80.6% (2,344.2 min) from Major Event Days.

Post-25D Payback

### 16.1 Years @ 13.61 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,470/yr at 1,350 kWh/kW.

Distributed PV

### 103 Net-Metered Systems

0.53 MW residential PV (0.48% of customers) across 8 counties; state FEMA declarations (2015-2026): 23.

Black River Electric Coop - (MO) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1361 = $1,470/yr

EIA-861 2025 Utility ID 1775: Rate=13.61 c/kWh, Cust=21,606, SAIDI=2,908.5 min, PV=103.

**Result:** 48.48 outage hrs/yr; 16.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Black River Electric Coop - (MO)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Black River Electric Coop - (MO). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for Black River Electric Coop - (MO) (Utility ID 1775).

| EIA Utility ID & BA Code | ID 1775 · AECI |
|---|---|
| State & Ownership Type | MO · Cooperative |
| Retail Electricity Rates | 13.61 c/kWh Res · 12.17 c Comm · 8.35 c Ind |
| Avg Monthly Usage & Bill | 1,151.2 kWh/mo ($156.70/mo est.) |
| SAIDI (All Events w/ MED) | 2,908.5 min/yr (48.48 hrs/yr) |
| SAIDI (Without Major Events) | 564.3 min/yr (Storm share: 80.6%) |
| Residential Net-Metered PV | 103 systems (0.53 MW) |
| Counties Served (Sample) | 8 counties (Bollinger, Cape Girardeau, Dent, Iron, Madison, Reynolds, Shannon, Wayne) |

## Which Peer Electric Utilities Operate in MO?

Nearby Missouri electric utilities of comparable customer size led by Three Rivers Electric Coop (13.03 c/kWh). Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Three Rivers Electric Coop**](https://epri-peac.com/utilities/mo-three-rivers-electric-coop-16751/) | 13.03 c | 130.0 min | 158 | 22,757 |
| [**Howell-Oregon Elec Coop, Inc**](https://epri-peac.com/utilities/mo-howell-oregon-elec-coop-inc-8934/) | 13.12 c | — | 220 | 23,203 |
| [**Crawford Electric Coop, Inc**](https://epri-peac.com/utilities/mo-crawford-electric-coop-inc-4524/) | 13.21 c | 362.0 min | 117 | 19,861 |
| [**New-Mac Electric Coop, Inc**](https://epri-peac.com/utilities/mo-new-mac-electric-coop-inc-13520/) | 13.44 c | — | 366 | 19,527 |

What to Check & Best-Fit Scenarios

## What Should Black River Electric Coop - (MO) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Black River Electric Coop - (MO) (Cooperative, MO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Black River Electric Coop - (MO) acts as a wires-only TDU or bundled utility in MO.
- Transformer limits: Black River Electric Coop - (MO) interconnection engineering still checks neighborhood transformer kVA regardless of 2,908.5 SAIDI.

### Black River Electric Coop - (MO) Solar & Battery Evaluators

Compare your actual Black River Electric Coop - (MO) monthly kWh statement against 13.61 c/kWh and verify current export tariffs in MO.

### Black River Electric Coop - (MO) Outage & Generator Planners

Use Black River Electric Coop - (MO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Black River Electric Coop - (MO) (Missouri) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Black River Electric Coop - (MO)'s residential electricity rate and 2026 solar payback?

Black River Electric Coop - (MO) averages 13.61 c/kWh (+0.31 c/kWh vs Missouri average vs. Missouri). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,470/yr (16.1-year payback).

### How reliable is Black River Electric Coop - (MO) compared to peer Missouri utilities?

Black River Electric Coop - (MO) logged 2,908.5 SAIDI outage minutes (48.48 hrs/yr, 80.6% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Three Rivers Electric Coop (13.03 c/kWh) across Missouri.

### Which counties and customers does Black River Electric Coop - (MO) serve in Missouri?

EIA-861 filings list 21,606 customers across 8 counties including Bollinger, Cape Girardeau, Dent, with 103 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Black River Electric Coop - (MO).

## Related Pages

Explore Missouri energy benchmarks, Three Rivers Electric Coop, county outage profiles, and NEC 705.12 tools alongside Black River Electric Coop - (MO).

[Missouri State Energy Rates & Utilities](https://epri-peac.com/states/missouri/) [All Missouri County Power & Outage Profiles](https://epri-peac.com/counties/missouri/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.61 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)