Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Wright-Hennepin Coop Elec Assn (EIA ID 20996, MN) serves 54,582 customers at 15.0 c/kWh (-0.83 c/kWh vs Minnesota average) with 45.0 min/yr SAIDI (0.75 hrs/yr) with 345 net-metered residential solar systems (0.63% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 20996

- **Res. Rate** : 15.0 c/kWh

- **SAIDI (All Events)** : 45.0 min/yr

- **Net-Metered PV** : 345 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Wright-Hennepin Coop Elec Assn Compare on Tariffs and Reliability?

Solar payback, residential tariff (15.0 c/kWh), and outage history inside Wright-Hennepin Coop Elec Assn territory. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Homeowners inside Wright-Hennepin Coop Elec Assn's Minnesota footprint (7 counties including Carver, Hennepin, McLeod) face 15.0 c/kWh benchmark pricing (-3.54 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 14.6 years. Reliability data recorded 45.0 SAIDI outage minutes (0.75 hrs/yr, rank #100 of 751 reporting utilities).

## Where Does Wright-Hennepin Coop Elec Assn Sit Across US Utility Rates?

Benchmarking Wright-Hennepin Coop Elec Assn's 15.0 c/kWh residential rate against 1,989 EIA-861 utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does Wright-Hennepin Coop Elec Assn Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Wright-Hennepin Coop Elec Assn across Minnesota utilities. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## What Do EIA-861 Benchmarks Show for Wright-Hennepin Coop Elec Assn?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Wright-Hennepin Coop Elec Assn in 2025.

Lowest Rate #1,214 / 1,989

### 15.0 c/kWh (-0.83 vs MN)

Commercial avg: 11.98 c/kWh; Industrial: 10.66 c/kWh; est. residential bill $140.42/mo.

Reliability #100 / 751

### 45.0 min/yr (0.75 hrs)

34.9% (15.7 min) from Major Event Days; avg restore 80.2 min (~2.4 kWh @ 1.8 kW).

Post-25D Payback

### 14.6 Years @ 15.0 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,620/yr at 1,350 kWh/kW.

Distributed PV

### 345 Net-Metered Systems

4.17 MW residential PV (0.63% of customers) across 7 counties; state FEMA declarations (2015-2026): 15.

Wright-Hennepin Coop Elec Assn Reliability & Solar Offset Calculation

Backup_Energy = (80.2 min / 60) * 1.8 kW = 2.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1500 = $1,620/yr

EIA-861 2025 Utility ID 20996: Rate=15.0 c/kWh, Cust=54,582, SAIDI=45.0 min, PV=345.

**Result:** 0.75 outage hrs/yr; 14.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Wright-Hennepin Coop Elec Assn?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 20996. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for Wright-Hennepin Coop Elec Assn (Utility ID 20996).

| EIA Utility ID & BA Code | ID 20996 · MISO |
|---|---|
| State & Ownership Type | MN · Cooperative |
| Retail Electricity Rates | 15.0 c/kWh Res · 11.98 c Comm · 10.66 c Ind |
| Avg Monthly Usage & Bill | 936.4 kWh/mo ($140.42/mo est.) |
| SAIDI (All Events w/ MED) | 45.0 min/yr (0.75 hrs/yr) |
| SAIDI (Without Major Events) | 29.3 min/yr (Storm share: 34.9%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.561 /yr · 80.2 min restore |
| Residential Net-Metered PV | 345 systems (4.17 MW) |
| Counties Served (Sample) | 7 counties (Carver, Hennepin, McLeod, Meeker, Sherburne, Stearns, Wright) |

## Which Peer Electric Utilities Operate in MN?

Benchmark Wright-Hennepin Coop Elec Assn directly against Rochester Public Utilities and peer Minnesota retail electric power providers. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Rochester Public Utilities**](https://epri-peac.com/utilities/mn-rochester-public-utilities-16181/) | 18.58 c | 33.0 min | 755 | 55,728 |
| [**East Central Energy**](https://epri-peac.com/utilities/mn-east-central-energy-5574/) | 17.63 c | 97.0 min | 682 | 55,839 |
| [**Otter Tail Power Co**](https://epri-peac.com/utilities/mn-otter-tail-power-co-14232/) | 11.27 c | 557.3 min | 84 | 50,219 |
| [**Lake Country Power**](https://epri-peac.com/utilities/mn-lake-country-power-10697/) | 18.34 c | 414.7 min | 308 | 47,386 |

What to Check & Best-Fit Scenarios

## What Should Wright-Hennepin Coop Elec Assn Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Wright-Hennepin Coop Elec Assn (Cooperative, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Wright-Hennepin Coop Elec Assn's 15.0 c/kWh blended residential rate in MN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Wright-Hennepin Coop Elec Assn system-wide SAIDI averages rural and urban circuits across its MN territory or nearby Rochester Public Utilities.

### Wright-Hennepin Coop Elec Assn Solar & Battery Evaluators

Compare your actual Wright-Hennepin Coop Elec Assn monthly kWh statement against 15.0 c/kWh and verify current export tariffs in MN.

### Wright-Hennepin Coop Elec Assn Outage & Generator Planners

Use Wright-Hennepin Coop Elec Assn's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Wright-Hennepin Coop Elec Assn (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Wright-Hennepin Coop Elec Assn's residential electricity rate and 2026 solar payback?

Wright-Hennepin Coop Elec Assn averages 15.0 c/kWh (-0.83 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,620/yr (14.6-year payback).

### How reliable is Wright-Hennepin Coop Elec Assn compared to peer Minnesota utilities?

Wright-Hennepin Coop Elec Assn recorded 45.0 SAIDI outage minutes (0.75 hrs/yr, rank #100 of 751 reporting utilities); compare rates and outage history directly with Rochester Public Utilities (18.58 c/kWh) across Minnesota.

### Which counties and customers does Wright-Hennepin Coop Elec Assn serve in Minnesota?

EIA-861 filings list 54,582 customers across 7 counties including Carver, Hennepin, McLeod, with 345 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Wright-Hennepin Coop Elec Assn.

## Related Pages

Explore Minnesota energy benchmarks, Rochester Public Utilities, county outage profiles, and NEC 705.12 tools alongside Wright-Hennepin Coop Elec Assn.

[Minnesota State Energy Rates & Utilities](https://epri-peac.com/states/minnesota/) [All Minnesota County Power & Outage Profiles](https://epri-peac.com/counties/minnesota/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.0 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)