Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Hutchinson Utilities Comm (EIA ID 9130, MN) serves 6,731 customers at 11.02 c/kWh (-4.81 c/kWh vs Minnesota average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 9130

- **Res. Rate** : 11.02 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Hutchinson Utilities Comm Compare on Tariffs and Reliability?

EIA-861 rate delta (-4.81 c/kWh vs Minnesota average), customer scale (6,731), and 2026 solar payback benchmarks for Hutchinson Utilities Comm.

Ranked #238 of 1,989 reporting US utilities for residential rate (top 12.1%; lower than 87.9% of peers), Hutchinson Utilities Comm serves 6,731 accounts in Minnesota (Municipal). Commercial power averages 9.08 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 182.0 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does Hutchinson Utilities Comm Sit Across US Utility Rates?

Positions Hutchinson Utilities Comm (11.02 c/kWh) across 1,989 US electric utility residential tariffs. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does Hutchinson Utilities Comm Rank Across Cost & Reliability?

Percentile placement of Hutchinson Utilities Comm across retail kWh electricity cost and IEEE grid reliability outage metrics. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## What Do EIA-861 Benchmarks Show for Hutchinson Utilities Comm?

Four key EIA-861 rate, outage, and solar payback benchmarks for Hutchinson Utilities Comm (Municipal) in Minnesota. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Lowest Rate #238 / 1,989

### 11.02 c/kWh (-4.81 vs MN)

Commercial avg: 9.08 c/kWh; Industrial: 7.73 c/kWh; est. residential bill $77.85/mo.

State Reliability Context

### 182.0 min/yr (MN Avg)

Utility did not file separate IEEE SAIDI in 2025; Minnesota customer-weighted SAIDI is 182.0 min/yr.

Post-25D Payback

### 19.8 Years @ 11.02 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,190/yr at 1,350 kWh/kW.

Service Territory

### 6,731 Customers · 1 County

Serves 1 county including McLeod in Minnesota; state FEMA declarations (2015-2026): 15.

Hutchinson Utilities Comm Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1102 = $1,190/yr

EIA-861 2025 Utility ID 9130: Rate=11.02 c/kWh, Cust=6,731.

**Result:** 19.8 yr 8 kW cash payback at 11.02 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Hutchinson Utilities Comm?

Complete Form EIA-861 filing summary for Hutchinson Utilities Comm (ID 9130) covering sales, PV, and counties. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for Hutchinson Utilities Comm (Utility ID 9130).

| EIA Utility ID & BA Code | ID 9130 · MISO |
|---|---|
| State & Ownership Type | MN · Municipal |
| Retail Electricity Rates | 11.02 c/kWh Res · 9.08 c Comm · 7.73 c Ind |
| Avg Monthly Usage & Bill | 706.4 kWh/mo ($77.85/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (McLeod) |

## Which Peer Electric Utilities Operate in MN?

Compare Hutchinson Utilities Comm directly with Brainerd Public Utilities and nearby Minnesota electric utilities by customer base. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Brainerd Public Utilities**](https://epri-peac.com/utilities/mn-brainerd-public-utilities-2138/) | 12.1 c | 21.3 min | 0 | 7,014 |
| [**City of Marshall - (MN)**](https://epri-peac.com/utilities/mn-city-of-marshall-mn-11731/) | 9.85 c | 4.9 min | 8 | 5,864 |
| [**Federated Rural Electric Assn**](https://epri-peac.com/utilities/mn-federated-rural-electric-assn-6258/) | 12.81 c | 116.2 min | 13 | 5,733 |
| [**Minnesota Valley Coop L&P Assn**](https://epri-peac.com/utilities/mn-minnesota-valley-coop-l-p-assn-40304/) | 13.23 c | 124.8 min | 40 | 4,946 |

What to Check & Best-Fit Scenarios

## What Should Hutchinson Utilities Comm Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Hutchinson Utilities Comm (Municipal, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Hutchinson Utilities Comm acts as a wires-only TDU or bundled utility in MN.
- Transformer limits: Hutchinson Utilities Comm interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### Hutchinson Utilities Comm Solar & Battery Evaluators

Compare your actual Hutchinson Utilities Comm monthly kWh statement against 11.02 c/kWh and verify current export tariffs in MN.

### Hutchinson Utilities Comm Outage & Generator Planners

Use Hutchinson Utilities Comm's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Hutchinson Utilities Comm (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

### What is Hutchinson Utilities Comm's residential electricity rate and 2026 solar payback?

Hutchinson Utilities Comm averages 11.02 c/kWh (-4.81 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,190/yr (19.8-year payback).

### How reliable is Hutchinson Utilities Comm compared to peer Minnesota utilities?

Hutchinson Utilities Comm did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 182.0 min/yr); compare rates and outage history directly with Brainerd Public Utilities (12.1 c/kWh) across Minnesota.

### Which counties and customers does Hutchinson Utilities Comm serve in Minnesota?

EIA-861 filings list 6,731 customers across 1 county including McLeod, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Hutchinson Utilities Comm.

## Related Pages

Explore Minnesota energy benchmarks, Brainerd Public Utilities, county outage profiles, and NEC 705.12 tools alongside Hutchinson Utilities Comm.

[Minnesota State Energy Rates & Utilities](https://epri-peac.com/states/minnesota/) [All Minnesota County Power & Outage Profiles](https://epri-peac.com/counties/minnesota/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.02 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)