---
title: "Freeborn Mower Electric (MN) Rate & SAIDI"
url: https://epri-peac.com/utilities/mn-freeborn-mower-electric-cooperative-6782/
description: "2025 EIA-861 profile for Freeborn Mower Electric Cooperative (MN): 15.28 c/kWh rate, SAIDI 172.3 min/yr, 170 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Freeborn Mower Electric Cooperative (MN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Freeborn Mower Electric Cooperative (EIA ID 6782, MN) serves 17,664 customers at 15.28 c/kWh (-0.55 c/kWh vs Minnesota average) with 172.3 min/yr SAIDI (2.87 hrs/yr) with 170 net-metered residential solar systems (0.96% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6782

- **Res. Rate** : 15.28 c/kWh

- **SAIDI (All Events)** : 172.3 min/yr

- **Net-Metered PV** : 170 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Freeborn Mower Electric Cooperative Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.55 c/kWh vs Minnesota average), customer scale (17,664), and 2026 solar payback benchmarks for Freeborn Mower Electric Cooperative.

Serving 17,664 customers across 7 counties including Dodge, Faribault, Fillmore in Minnesota, Freeborn Mower Electric Cooperative (Cooperative, Balancing Authority MISO) bills residential power at 15.28 c/kWh (-0.55 c/kWh vs Minnesota average vs. Minnesota), offsetting ~$1,650/yr on an 8 kW array. Grid filings show the utility recorded 172.3 SAIDI outage minutes (2.87 hrs/yr, rank #366 of 751 reporting utilities), with 170 net-metered residential solar systems (0.96% customer adoption).

## Where Does Freeborn Mower Electric Cooperative Sit Across US Utility Rates?

Positions Freeborn Mower Electric Cooperative (15.28 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does Freeborn Mower Electric Cooperative Rank Across Cost & Reliability?

Percentile placement of Freeborn Mower Electric Cooperative across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Freeborn Mower Electric Cooperative?

Four key EIA-861 rate, outage, and solar payback benchmarks for Freeborn Mower Electric Cooperative (Cooperative) in Minnesota. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #1,268 / 1,989

### 15.28 c/kWh (-0.55 vs MN)

Commercial avg: 12.08 c/kWh; Industrial: 8.94 c/kWh; est. residential bill $136.36/mo.

Reliability #366 / 751

### 172.3 min/yr (2.87 hrs)

67.7% (116.7 min) from Major Event Days; avg restore 109.1 min (~3.3 kWh @ 1.8 kW).

Post-25D Payback

### 14.3 Years @ 15.28 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,650/yr at 1,350 kWh/kW.

Distributed PV

### 170 Net-Metered Systems

3.828 MW residential PV (0.96% of customers) across 7 counties; state FEMA declarations (2015-2026): 15.

Freeborn Mower Electric Cooperative Reliability & Solar Offset Calculation

Backup_Energy = (109.1 min / 60) * 1.8 kW = 3.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1528 = $1,650/yr

EIA-861 2025 Utility ID 6782: Rate=15.28 c/kWh, Cust=17,664, SAIDI=172.3 min, PV=170.

**Result:** 2.87 outage hrs/yr; 14.3 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Freeborn Mower Electric Cooperative?

Complete Form EIA-861 filing summary for Freeborn Mower Electric Cooperative (ID 6782) covering sales, PV, and counties. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for Freeborn Mower Electric Cooperative (Utility ID 6782).

| EIA Utility ID & BA Code | ID 6782 · MISO |
|---|---|
| State & Ownership Type | MN · Cooperative |
| Retail Electricity Rates | 15.28 c/kWh Res · 12.08 c Comm · 8.94 c Ind |
| Avg Monthly Usage & Bill | 892.7 kWh/mo ($136.36/mo est.) |
| SAIDI (All Events w/ MED) | 172.3 min/yr (2.87 hrs/yr) |
| SAIDI (Without Major Events) | 55.6 min/yr (Storm share: 67.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.58 /yr · 109.1 min restore |
| Residential Net-Metered PV | 170 systems (3.828 MW) |
| Counties Served (Sample) | 7 counties (Dodge, Faribault, Fillmore, Freeborn, Mower, Olmsted, Steele) |

## Which Peer Electric Utilities Operate in MN?

Compare Freeborn Mower Electric Cooperative directly with BENCO Electric Cooperative and nearby Minnesota electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**BENCO Electric Cooperative**](https://epri-peac.com/utilities/mn-benco-electric-cooperative-1884/) | 16.14 c | — | 181 | 18,500 |
| [**City of Moorhead - (MN)**](https://epri-peac.com/utilities/mn-city-of-moorhead-mn-12894/) | 11.52 c | 14.5 min | 32 | 18,556 |
| [**Shakopee Public Utilities Comm**](https://epri-peac.com/utilities/mn-shakopee-public-utilities-comm-16971/) | 15.91 c | 12.7 min | 365 | 18,970 |
| [**MiEnergy Cooperative**](https://epri-peac.com/utilities/mn-mienergy-cooperative-19157/) | 16.9 c | 212.8 min | 421 | 15,320 |

What to Check & Best-Fit Scenarios

## What Should Freeborn Mower Electric Cooperative Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Freeborn Mower Electric Cooperative (Cooperative, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Freeborn Mower Electric Cooperative's 15.28 c/kWh blended residential rate in MN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Freeborn Mower Electric Cooperative system-wide SAIDI averages rural and urban circuits across its MN territory or nearby BENCO Electric Cooperative.

### Freeborn Mower Electric Cooperative Solar & Battery Evaluators

Compare your actual Freeborn Mower Electric Cooperative monthly kWh statement against 15.28 c/kWh and verify current export tariffs in MN.

### Freeborn Mower Electric Cooperative Outage & Generator Planners

Use Freeborn Mower Electric Cooperative's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Freeborn Mower Electric Cooperative (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Freeborn Mower Electric Cooperative's residential electricity rate and 2026 solar payback?

Freeborn Mower Electric Cooperative averages 15.28 c/kWh (-0.55 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,650/yr (14.3-year payback).

### How reliable is Freeborn Mower Electric Cooperative compared to peer Minnesota utilities?

Freeborn Mower Electric Cooperative recorded 172.3 SAIDI outage minutes (2.87 hrs/yr, rank #366 of 751 reporting utilities); compare rates and outage history directly with BENCO Electric Cooperative (16.14 c/kWh) across Minnesota.

### Which counties and customers does Freeborn Mower Electric Cooperative serve in Minnesota?

EIA-861 filings list 17,664 customers across 7 counties including Dodge, Faribault, Fillmore, with 170 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Freeborn Mower Electric Cooperative.

## Related Pages

Explore Minnesota energy benchmarks, BENCO Electric Cooperative, county outage profiles, and NEC 705.12 tools alongside Freeborn Mower Electric Cooperative.

[Minnesota State Energy Rates & Utilities](https://epri-peac.com/states/minnesota/) [All Minnesota County Power & Outage Profiles](https://epri-peac.com/counties/minnesota/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.28 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
