---
title: "City of Marshall - (MN) (MN) Rate & SAIDI"
url: https://epri-peac.com/utilities/mn-city-of-marshall-mn-11731/
description: "2025 EIA-861 profile for City of Marshall - (MN) (MN): 9.85 c/kWh rate, SAIDI 4.9 min/yr, 8 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Marshall - (MN) (MN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Marshall - (MN) (EIA ID 11731, MN) serves 5,864 customers at 9.85 c/kWh (-5.98 c/kWh vs Minnesota average) with 4.9 min/yr SAIDI (0.08 hrs/yr) with 8 net-metered residential solar systems (0.14% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11731

- **Res. Rate** : 9.85 c/kWh

- **SAIDI (All Events)** : 4.9 min/yr

- **Net-Metered PV** : 8 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Marshall - (MN) Compare on Tariffs and Reliability?

How City of Marshall - (MN) (Municipal) performs across 1 county on kWh rates and outage resilience. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Across 1 county including Lyon, City of Marshall - (MN) offers a low 9.85 c/kWh residential rate (-8.69 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 22.2 years without federal 25D compared to peer Federated Rural Electric Assn (12.81 c/kWh). With 5,864 customer accounts (Municipal), 2025 Form EIA-861 shows City of Marshall - (MN) recorded 4.9 SAIDI outage minutes (0.08 hrs/yr, rank #4 of 751 reporting utilities), with 8 net-metered residential solar systems (0.14% customer adoption).

## Where Does City of Marshall - (MN) Sit Across US Utility Rates?

National utility tariff curve marking City of Marshall - (MN) at 9.85 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Marshall - (MN) Rank Across Cost & Reliability?

Relative ranking of City of Marshall - (MN) on residential electricity pricing and annual IEEE SAIDI outage duration. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## What Do EIA-861 Benchmarks Show for City of Marshall - (MN)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Marshall - (MN) in Minnesota.

Lowest Rate #125 / 1,989

### 9.85 c/kWh (-5.98 vs MN)

Commercial avg: 8.68 c/kWh; Industrial: 6.54 c/kWh; est. residential bill $88.09/mo.

Reliability #4 / 751

### 4.9 min/yr (0.08 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 30.4 min (~0.9 kWh @ 1.8 kW).

Post-25D Payback

### 22.2 Years @ 9.85 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,064/yr at 1,350 kWh/kW.

Distributed PV

### 8 Net-Metered Systems

0.052 MW residential PV (0.14% of customers) across 1 county; state FEMA declarations (2015-2026): 15.

City of Marshall - (MN) Reliability & Solar Offset Calculation

Backup_Energy = (30.4 min / 60) * 1.8 kW = 0.9 kWh/event | Solar_Offset = 10,800 kWh * $0.0985 = $1,064/yr

EIA-861 2025 Utility ID 11731: Rate=9.85 c/kWh, Cust=5,864, SAIDI=4.9 min, PV=8.

**Result:** 0.08 outage hrs/yr; 22.2 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Marshall - (MN)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Marshall - (MN). Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for City of Marshall - (MN) (Utility ID 11731).

| EIA Utility ID & BA Code | ID 11731 · MISO |
|---|---|
| State & Ownership Type | MN · Municipal |
| Retail Electricity Rates | 9.85 c/kWh Res · 8.68 c Comm · 6.54 c Ind |
| Avg Monthly Usage & Bill | 894.0 kWh/mo ($88.09/mo est.) |
| SAIDI (All Events w/ MED) | 4.9 min/yr (0.08 hrs/yr) |
| SAIDI (Without Major Events) | 4.9 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.16 /yr · 30.4 min restore |
| Residential Net-Metered PV | 8 systems (0.052 MW) |
| Counties Served (Sample) | 1 county (Lyon) |

## Which Peer Electric Utilities Operate in MN?

Nearby Minnesota electric utilities of comparable customer size led by Federated Rural Electric Assn (12.81 c/kWh). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Federated Rural Electric Assn**](https://epri-peac.com/utilities/mn-federated-rural-electric-assn-6258/) | 12.81 c | 116.2 min | 13 | 5,733 |
| [**Hutchinson Utilities Comm**](https://epri-peac.com/utilities/mn-hutchinson-utilities-comm-9130/) | 11.02 c | — | 0 | 6,731 |
| [**Minnesota Valley Coop L&P Assn**](https://epri-peac.com/utilities/mn-minnesota-valley-coop-l-p-assn-40304/) | 13.23 c | 124.8 min | 40 | 4,946 |
| [**Brainerd Public Utilities**](https://epri-peac.com/utilities/mn-brainerd-public-utilities-2138/) | 12.1 c | 21.3 min | 0 | 7,014 |

What to Check & Best-Fit Scenarios

## What Should City of Marshall - (MN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Marshall - (MN) (Municipal, MN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Marshall - (MN) (MN) shift real bills away from 9.85 c/kWh.
- Outage clustering: Major Event Days skew City of Marshall - (MN) annual minutes differently than routine non-storm reliability.

### City of Marshall - (MN) Solar & Battery Evaluators

Compare your actual City of Marshall - (MN) monthly kWh statement against 9.85 c/kWh and verify current export tariffs in MN.

### City of Marshall - (MN) Outage & Generator Planners

Use City of Marshall - (MN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Marshall - (MN) (Minnesota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Marshall - (MN)'s residential electricity rate and 2026 solar payback?

City of Marshall - (MN) averages 9.85 c/kWh (-5.98 c/kWh vs Minnesota average vs. Minnesota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,064/yr (22.2-year payback).

### How reliable is City of Marshall - (MN) compared to peer Minnesota utilities?

City of Marshall - (MN) recorded 4.9 SAIDI outage minutes (0.08 hrs/yr, rank #4 of 751 reporting utilities); compare rates and outage history directly with Federated Rural Electric Assn (12.81 c/kWh) across Minnesota.

### Which counties and customers does City of Marshall - (MN) serve in Minnesota?

EIA-861 filings list 5,864 customers across 1 county including Lyon, with 8 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Marshall - (MN).

## Related Pages

Explore Minnesota energy benchmarks, Federated Rural Electric Assn, county outage profiles, and NEC 705.12 tools alongside City of Marshall - (MN).

[Minnesota State Energy Rates & Utilities](https://epri-peac.com/states/minnesota/) [All Minnesota County Power & Outage Profiles](https://epri-peac.com/counties/minnesota/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.85 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
