description: "2025 EIA-861 profile for Coldwater Board of Public Util (MI): 15.61 c/kWh rate, SAIDI 309.5 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Coldwater Board of Public Util (MI) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Coldwater Board of Public Util (EIA ID 3915, MI) serves 6,420 customers at 15.61 c/kWh (-4.42 c/kWh vs Michigan average) with 309.5 min/yr SAIDI (5.16 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3915

- **Res. Rate** : 15.61 c/kWh

- **SAIDI (All Events)** : 309.5 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Coldwater Board of Public Util Compare on Tariffs and Reliability?

EIA-861 rate delta (-4.42 c/kWh vs Michigan average), customer scale (6,420), and 2026 solar payback benchmarks for Coldwater Board of Public Util.

Ranked #1,339 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 32.6% of peers), Coldwater Board of Public Util serves 6,420 accounts in Michigan (Municipal). Commercial power averages 14.7 c/kWh. It logged 309.5 SAIDI outage minutes (5.16 hrs/yr, 93.9% storm-driven), making battery backup or a standby ATS worthwhile, with zero residential net-metered PV reported in 2025 filings.

## Where Does Coldwater Board of Public Util Sit Across US Utility Rates?

Positions Coldwater Board of Public Util (15.61 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does Coldwater Board of Public Util Rank Across Cost & Reliability?

Percentile placement of Coldwater Board of Public Util across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Coldwater Board of Public Util?

Four key EIA-861 rate, outage, and solar payback benchmarks for Coldwater Board of Public Util (Municipal) in Michigan.

Lowest Rate #1,339 / 1,989

### 15.61 c/kWh (-4.42 vs MI)

Commercial avg: 14.7 c/kWh; Industrial: 9.61 c/kWh; est. residential bill $93.16/mo.

Reliability #538 / 751

### 309.5 min/yr (5.16 hrs)

93.9% (290.7 min) from Major Event Days; avg restore 329.6 min (~9.9 kWh @ 1.8 kW).

Post-25D Payback

### 14.0 Years @ 15.61 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,686/yr at 1,350 kWh/kW.

Service Territory

### 6,420 Customers · 1 County

Serves 1 county including Branch in Michigan; state FEMA declarations (2015-2026): 11.

Coldwater Board of Public Util Reliability & Solar Offset Calculation

Backup_Energy = (329.6 min / 60) * 1.8 kW = 9.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1561 = $1,686/yr

EIA-861 2025 Utility ID 3915: Rate=15.61 c/kWh, Cust=6,420, SAIDI=309.5 min.

**Result:** 5.16 outage hrs/yr; 14.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Coldwater Board of Public Util?

Complete Form EIA-861 filing summary for Coldwater Board of Public Util (ID 3915) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for Coldwater Board of Public Util (Utility ID 3915).

| EIA Utility ID & BA Code | ID 3915 · MISO |
|---|---|
| State & Ownership Type | MI · Municipal |
| Retail Electricity Rates | 15.61 c/kWh Res · 14.7 c Comm · 9.61 c Ind |
| Avg Monthly Usage & Bill | 596.9 kWh/mo ($93.16/mo est.) |
| SAIDI (All Events w/ MED) | 309.5 min/yr (5.16 hrs/yr) |
| SAIDI (Without Major Events) | 18.8 min/yr (Storm share: 93.9%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.939 /yr · 329.6 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Branch) |

## Which Peer Electric Utilities Operate in MI?

Compare Coldwater Board of Public Util directly with City of Sturgis - (MI) and nearby Michigan electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Sturgis - (MI)**](https://epri-peac.com/utilities/mi-city-of-sturgis-mi-18252/) | 16.03 c | 39.2 min | 17 | 6,112 |
| [**City of Zeeland - (MI)**](https://epri-peac.com/utilities/mi-city-of-zeeland-mi-21158/) | 9.98 c | 25.1 min | 4 | 6,058 |
| [**Northern States Power Co**](https://epri-peac.com/utilities/mi-northern-states-power-co-13780/) | 15.48 c | 738.0 min | 0 | 7,567 |
| [**Alger-Delta Coop Electric Assn**](https://epri-peac.com/utilities/mi-alger-delta-coop-electric-assn-305/) | 23.2 c | 1,151.9 min | 64 | 9,837 |

What to Check & Best-Fit Scenarios

## What Should Coldwater Board of Public Util Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Coldwater Board of Public Util (Municipal, MI) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Coldwater Board of Public Util (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in MI.
- Export credit rules: check Coldwater Board of Public Util's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Coldwater Board of Public Util Solar & Battery Evaluators

Compare your actual Coldwater Board of Public Util monthly kWh statement against 15.61 c/kWh and verify current export tariffs in MI.

### Coldwater Board of Public Util Outage & Generator Planners

Use Coldwater Board of Public Util's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Coldwater Board of Public Util (Michigan) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Coldwater Board of Public Util's residential electricity rate and 2026 solar payback?

Coldwater Board of Public Util averages 15.61 c/kWh (-4.42 c/kWh vs Michigan average vs. Michigan). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,686/yr (14.0-year payback).

### How reliable is Coldwater Board of Public Util compared to peer Michigan utilities?

Coldwater Board of Public Util logged 309.5 SAIDI outage minutes (5.16 hrs/yr, 93.9% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with City of Sturgis - (MI) (16.03 c/kWh) across Michigan.

### Which counties and customers does Coldwater Board of Public Util serve in Michigan?

EIA-861 filings list 6,420 customers across 1 county including Branch, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Coldwater Board of Public Util.

## Related Pages

Explore Michigan energy benchmarks, City of Sturgis - (MI), county outage profiles, and NEC 705.12 tools alongside Coldwater Board of Public Util.

[Michigan State Energy Rates & Utilities](https://epri-peac.com/states/michigan/) [All Michigan County Power & Outage Profiles](https://epri-peac.com/counties/michigan/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.61 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)